Deltek Insight 2012: Excessive Pass-Through Costs – The Newest FAR Unallowable

Like this? Share it with your network

Share

Deltek Insight 2012: Excessive Pass-Through Costs – The Newest FAR Unallowable

  • 1,107 views
Uploaded on

The Final Rule on Excessive Pass-Through Costs became effective with the change to FAR Part 31 in January 2011. This change created the first new category of unallowable costs in more than a......

The Final Rule on Excessive Pass-Through Costs became effective with the change to FAR Part 31 in January 2011. This change created the first new category of unallowable costs in more than a decade. Learn how and when DCAA will examine this new category of unallowable costs and how to quantify your exposure and protect your interests. Beginner Level.

More in: Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
1,107
On Slideshare
1,107
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
6
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide
  • SummaryDue to a new FAR provision effective January, 2011, and new audit Guidance from DCAA, indirect costs and fee or profit associated with subcontracts may be unallowable when the total subcontracted content of a contract or individual delivery order exceeds seventy percent of the total cost.The contracting officer may make a determination that pass-through costs are excessive and thus unallowable prior to award, but is not required to do so. DCAA will examine contracts containing the new implementing FAR clause during incurred cost submission audits and the review of final vouchers. This means that any DCAA opinion on allowability of indirect costs or fee/profit associated with subcontract costs may not be rendered until years after the costs are incurred.DCAA audit guidance on the new provisions appears to reach far beyond the intent of the regulation and effectively puts the burden on the contractor to “demonstrate” the value added by the indirect costs. Absent such demonstration, auditors are required to question the allowability of both the indirect costs and any fee or profit associated with all subcontract costs on the covered contract or delivery order.These new regulations and the implementing guidance could result in sweeping changes to large IDIQ, MAC and GWAC programs currently dependent on large prime/sub teams for delivery order performance.
  • The concept of limiting the allowability of G&A and profit on subcontracts goes back to a failed House bill, the Clean Contracting Act of 2006. That bill, sponsored by Congressman Henry Waxman (D, CA) was partially a response to a public outcry over FEMA contracting in the aftermath of Hurricane Katrina. The bill proposed to…ban “monopoly contracts” and most IDIQsreduce the use of cost-plus contractsprohibit “layer cake” deals that inflate costs through tiers of subcontractorslimit noncompetitive contractsincrease oversight, and effectively ban award feesdeter corruption in contractingend sole source contracting with Alaska Native Corporationsrequire Prime contractors to perform 65% of the work on ALL contracts
  • The bill failed, but a provision was successfully inserted in the National Defense Authorization Act (NDAA) for Fiscal Year 2007 to require DoD to “prescribe regulations to ensure that pass-through charges on contracts or subcontracts that are entered into for or on behalf of DoD are not excessive in relation to the cost of work performed by the relevant contractor or subcontractor.” The language was somewhat vague and applied only to Defense contracts, but it did provide a starting point for the initiative.In the mean time, a bill very similar to the Clean Contracting Act entitled the “Accountability in Government Contracting Act,” was offered by Senator Susan Collins (R, ME) in 2007 including a provision which would have required tiering of subcontracts to be “minimized.” The bill was flawed in a number of respects and was never reported out of committee.
  • The same year, Senator Byron Dorgan (D, ND) offered yet another version, the “Honest Leadership & Accountability in Contracting Act,” but that bill also failed to survive committee consideration.Congressman Henry Waxman (D, CA) then reintroduced a somewhat watered down version of his “Clean Contracting Act,” in 2008, but once again, the bill seemed unlikely to pass.
  • There was little or no public awareness or interest in the issue, despite a DFARS rule that was effective 26 April, 2007 (implementing the requirement of the 2007 NDAA), until the 2008 Presidential campaigns.
  • In a number of stump speeches, Senator John McCain began to publicize the issue, railing against what he termed “layer cake contracting.” His speeches cited examples of costs that doubled or tripled as invoices passed through multiple layers of subcontract tiers. His unfortunate staffers were unable to find real examples of such invoices, but that didn’t deter the bloggers or the media.Actually, the public response was a resounding yawn, but the Congressional response was somewhat more alert.
  • Anticipating yet another failure of the Clean Contracting Act, Congressman Waxman inserted the entire 2008 version of the bill into the Duncan Hunter National Defense Authorization Act (NDAA) for Fiscal Year 2009 (H.R. 5658) as an amendment. The amendment contained a section entitled “Anti-Fraud Provisions,” another entitled “Curbing Abuse-Prone Contracts,” and, finally, a provision requiring that the FAR be modified within one year to insert a provision to “minimize the excessive use by contractors of subcontractors, or of tiers of subcontractors, that add no or negligible value, and to ensure that neither a contractor nor a subcontractor receives indirect costs or profit on work performed by a lower tier subcontractor to which the higher-tier contractor or subcontractor adds no, or negligible, value.”
  • Passage of the 2009 NDAA kicked off the rule-making process on 14 October, 2008. Section 866 of the Act required an implementing FAR change within one year resulting in the following actions:
  • Passage of the 2009 NDAA kicked off the rule-making process on 14 October, 2008. Section 866 of the Act required an implementing FAR change within one year resulting in the following actions:14 October, 2009 – Interim rule published for comment14 December, 2009 – Comment period end13 December, 2010 – Final rule published in the Federal Register13 January 2011 – Final Rule became effectiveWhile not actually part of the rule-making process, there was one more significant event on 18 February, 2011. DCAA issued guidance to auditors on excessive pass through costs via Audit Guidance Memo (AGM) 11-PSP-003
  • FAR was amended with changes to…Prohibit "excessive" pass-through charges on cost-reimbursement contracts with civilian agencies in excess of the simplified acquisition thresholdProhibit “excessive” pass-through charges on all types of contracts with DOD in excess of $650,0000 (except for fixed-price contracts awarded based on adequate price competition or for commercial items)Require that the provisions be flowed down to subcontractorsRequire that covered contractors and subcontractors report specific information about pass-through charges (indirect costs and profit) either…In their proposals when they intend to subcontract more than 70 percent of the contract or subcontract effort, or After award when they actually subcontract more than 70 percent of the effort
  • A new FAR provision was added to Part 15 to control use of the new FAR Solicitation provision and contract clause(s).15.408 (n), Limitations on Pass-Through Charges. The contracting officer shall insert the provision at 52.215-22, Limitations on Pass-Through Charges—Identification of Subcontract Effort, in solicitations containing the clause at 52.215-23.The contract clause at 52.215-23 is required…For civilian agencies, in all cost-reimbursement contracts over the simplified acquisition threshold ($100k)For DOD, in all contracts except…A firm-fixed-price contract awarded on the basis of adequate price competition;A fixed-price contract with economic price adjustment awarded on the basis of adequate price competition;A firm-fixed-price contract for the acquisition of a commercial item; orA fixed-price contract with economic price adjustment, for the acquisition of a commercial item.The difference in the treatment of DoD and Civilian Agency contract arises out of the differing provisions of the 2007 and 2009 National Defense Authorization Acts. The 2007 provision applies to all contracts except certain types of fixed price arrangements. The 2009 provision extends coverage to the contracts with Civilian agencies, but only for cost-reimbursable contracts.
  • A new FAR Solicitation Provision was added:52.215-22 Limitations on Pass-Through Charges—Identification of Subcontract Effort.Requires that excessive [pass-through charges be excluded from the proposalRequires that the proposal identify the ($) amount of work to be performed by subcontractorsIf the amount to be subcontracted exceeds 70%...Requires the Prime to describe (and substantiate) the value added to be performed with respect to the subs efforts (indirect, not direct)Requires the Prime to identify the amount of all indirect cost and profit applicable to (each) sub’s workRequires a flow down to subs for proposal purposes
  • A new contract clause, “Limitations on Pass-Through Charges,” was added at FAR 52.215-23.As prescribed in 15.408(n)(2), use the following clause:LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009) Here are the highlights of the clause…52.215-23(b) - The Government will not pay excessive pass-through charges. The Contracting Officer shall determine if excessive pass-through charges exist.52.215-23(c)(1) - The Contractor shall notify the Contracting Officer in writing if—The Contractor changes the amount of subcontract effort after award such that it exceeds 70 percent of the total cost of work to be performedAny subcontractor changes the amount of lower-tier subcontractor effort after award such that it exceeds 70 percent of the total cost of the work to be performed under its subcontract52.215-23(d)(1) - If the Contracting Officer determines that excessive pass-through charges exist For other than fixed-price contracts, the excessive pass-through charges are unallowableFor applicable DoD fixed-price contracts, as identified in 15.408(n)(2)(i)(B), the Government shall be entitled to a price reduction for the amount of excessive pass-through chargesFlowdown to subs is required. (Note that the reporting responsibility is on the Prime, NOT the sub)Subs must report to the Prime (who is then required to report to the Gov’t)
  • DCAA guidance to auditors on excessive pass through costs was issued in the form of Audit Guidance Memo (AGM) 11-PSP-003(R) on 18 February, 2011.The memo provides direction as follows: “as part of a forward proposal pricing audit, auditors should perform procedures to evaluate a contractor's proposed support to demonstrate its added value when the proposed subcontracts are expected to exceed 70 percent of the total costs of the work performed”It also directs that during “incurred cost audits and evaluations of final vouchers, auditors should also perform procedures to test compliance with the subject FAR provisions”
  • DCAA guidance to auditors on excessive pass through costs was issued in the form of Audit Guidance Memo (AGM) 11-PSP-003(R) on 18 February, 2011.The memo provides direction as follows: “as part of a forward proposal pricing audit, auditors should perform procedures to evaluate a contractor's proposed support to demonstrate its added value when the proposed subcontracts are expected to exceed 70 percent of the total costs of the work performed”It also directs that during “incurred cost audits and evaluations of final vouchers, auditors should also perform procedures to test compliance with the subject FAR provisions”
  • The new FAR provisions require the Prime to “provide a description of the added value it will provide” and gives examples such as processing orders, maintaining inventory, reducing delivery lead times, managing multiple sources, coordinating deliveries, and performing quality assurance.The new DCAA Audit Guidance requires auditors to “evaluate the reasonableness of the contractor’s description and supporting documentation of the added value”Neither “reasonableness of the description” nor “supporting documentation for the added value” are required by the FAR provisions. With respect to audits of final vouchers, DCAA again oversteps the regulation by requiring the auditors to “provide a description and a demonstration of the added value by the contractor” DCAA further directs auditors to question costs and profits as excessive if “the contractor cannot demonstrate its added value efforts.” Finally, DCAA reminds auditors that “functions/costs not determined excessive under FAR 31.203(i) are still subject to the general (FAR 31.2) allowability, allocability, and reasonableness criteria”In other words, if you can’t question the costs under the new excessive pass-through clause, question them as not allocable or not reasonable.
  • Given the new audit guidance on this issue and the outstanding audit guidance on Government officials who ignore DCAA recommendations, the following expectations seem reasonable:G&A and profit on any proposal, contract or delivery order with more than 70% subcontracting are likely to be questionedMost contracting officers will be likely to pursue those recommendations – perhaps post-award in many cases.The solicitation provision and contract clause(s) will almost certainly be misused.Agencies are already including the provision in commercial item acquisitions despite the fact that they are exempted from the requirement and FAR Part 12 bars “the tailoring of solicitations for commercial items in a manner inconsistent with customary commercial practice.”One such solicitation out of DLA has already been the subject of a protestThe agency defended the use of the provisions saying that it “wanted to avoid excessive pass through charges from multiple sources along the supply chain.”GAO denied the protest
  • The intent of the new FAR solicitation provisions and clauses is for the contracting officer to be aware of the subcontract content and to afford the Government the opportunity to make a pre-determination that pass-through charges are “excessive” and thus unallowable. There is, however, no requirement for such a determination and consequently the lack of such determination is no protection against a future disallowance. Likewise, there is no provision for a pre-determination that such charges will be allowable. By making no determination at or prior to award, the Government can give itself as many bites at this particular apple as it would like.
  • Failure to report if a contract’s subcontract content has “grown” post award to exceed 70% is a contractual non-compliance and could result in a finding of a significant system deficiency. DCAA’s Audit Guidance Memo (AGM) 11-PSP-003 states “If the auditor finds through the procedures below that the contractor failed to comply with the requirements of FAR 52.215-23(c) this should be considered an accounting and/or purchasing system deficiency.”In ALL contracts where subcontract costs exceed 70% of the total, the auditors are directed “If the contractor cannot demonstrate its “added value” efforts, then the indirect costs (and profit) added by the contractor to the subcontracted work should be questioned.”
  • Unfortunately, AGM 11-PSP-003 directs these reviews in proposals, the incurred cost submissions and final vouchers, but no other time. While other examinations could certainly occur, it would be unlikely given DCAA’s current backlog of other work. As a result, any opinion by DCAA as to the allowability of indirect costs and profit applied to subcontract costs may not surface until years after the costs were incurred. In some cases, it could be many years afterward.The FAR language treats each delivery order separately. Most other examination of subcontracting efforts on IDIQ contracts (such as Small Business Subcontracting Plan Compliance) is conducted on the total contract (or even on an Enterprise basis), not delivery order by delivery order. This could effectively ban G&A and profit on “pass-through” prime/sub IDIQ arrangements – like many orders placed under the Alliant, Encore, SEWP, Eagle, Seaport-e, and dozens of other programs.
  • Contractors should consider a value added G&A base if large teams or high subcontract content are part of the business model or strategy. The new FAR clause 52.215-23 contains a specific exception for “subcontract management costs” stating that costs to be disallowed are “other than charges for the costs of managing subcontracts and any applicable indirect costs and associated profit/fee based on such costs”. This would seem to specifically exempt the traditional “Material Handling” rate from disallowance under the new clause(s), but the very exclusion of subcontracts from a “Value Added” G&A base could also result in a near-automatic position by DCAA that there should also be no profit allowed.
  • Contractors should document very carefully the functions performed with respect to subcontract management and administration and the costs included in any indirect rate applied to subcontracts. They should also should develop standardized descriptions of the “value added” efforts performed and ensure they are in every proposal – not just the ones with high subcontract content.Contractors should examine teaming and competitive strategies very carefully. The large team/order pass-through strategy that has been so successful on large competitive IDIQ programs may be considerably less attractive for future proposals unless…Orders are to be fixed price and competed, orThe Prime will retain and perform more than 30% of every orderContractors should monitor subcontract costs in both proposals and actual costs and make reporting both standard and routine.Finally, they should ensure that every contract brief contains a statement concerning the value of services performed with respect to subcontracts.
  • These new FAR provisions and DCAA’s audit guidance could have far-reaching implications for IDIQ programs designed to encourage teaming and pass-through arrangements.Seaport-e orders are heavily cost-type and often 99% subcontracted. G&A and profit may not be unallowable on such orders.Many other IDIQ programs’ contracts are held by a prime who passes work through to a subcontract team member. Those may also be affected.In addition, the impact on “unpopulated joint ventures” where virtually all of the work is subcontracted to the venture companies is uncertain. Since much of DCAA’s emphasis is on examination of subcontract costs through the incurred cost submission or final vouchers (possibly years after performance), it will almost certainly result in new documentation and record-keeping requirements.Given the difficulty of making such subjective judgments on the effectiveness of efforts performed years before (such as subcontract administration or management), will DCAA could began reviewing subcontract content on interim vouchers, giving the Government still more bites at the apple? 
  • These new FAR provisions and DCAA’s audit guidance could have far-reaching implications for IDIQ programs designed to encourage teaming and pass-through arrangements.Seaport-e orders are heavily cost-type and often 99% subcontracted. G&A and profit may not be unallowable on such orders.Many other IDIQ programs’ contracts are held by a prime who passes work through to a subcontract team member. Those may also be affected.In addition, the impact on “unpopulated joint ventures” where virtually all of the work is subcontracted to the venture companies is uncertain.

Transcript

  • 1. Excessive Pass-ThroughCosts — The NewestFAR UnallowableRich Wilkinson, Director, Watkins Meegan LLCKiran Pinto, Manager, Watkins Meegan LLCGC-189
  • 2. Session ContentBackgroundPublic awarenessEnabling legislation and chronologyThe FAR changesThe FAR MechanismsDCAA audit guidance and its effectsContractor exposureMitigation strategiesA look forward2 ©2012 Deltek, Inc. All Rights Reserved
  • 3. Background3 ©2012 Deltek, Inc. All Rights Reserved
  • 4. Origin of the ConceptLimitation on “Excessive Pass-Through” goes back to 2006“Clean Contracting Act” introduced in 2006  Sponsored by Representative Henry Waxman (D-CA)  Partially a response to public outcry over FEMA contracting post- Katrina  Would have…  Prohibited “layer-cake” deals that inflate costs through tiers of subcontractors  Banned “monopoly contracts” and most IDIQs  Ended all sole source contracts to Alaska Native Corporations  Banned award fee contracts  Required Prime contractors to perform 65% of all work on all contracts4 ©2012 Deltek, Inc. All Rights Reserved
  • 5. Origin of the ConceptProvision inserted in 2007 NDAA to require DOD to “prescribe regulations to ensure pass-through charges are not excessive”  Language was vague at best and applied only to DOD  Implemented by weak DFARS rule effective 26 April 2007  Starting point for future effortsSimilar bill, “Accountability in Government Contracting Act” introduced in 2007  Sponsored by Senator Susan Collins (R-ME)  Would have required tiering of subcontracts to be “minimized”  Flawed in many respects and never reported out of committee5 ©2012 Deltek, Inc. All Rights Reserved
  • 6. Origin of the ConceptAnother bill, “Honest Leadership & Accountability in Contracting Act” also introduced in 2007  Sponsored by Senator Byron Dorgan (D-ND)  Also failed to survive committee considerationAnother version of “Clean Contracting Act” introduced in 2008  Also sponsored by Representative Henry Waxman (D-CA)  “Watered down” version of the original, but contained the excessive pass-through provisions  Also seemed unlikely to pass6 ©2012 Deltek, Inc. All Rights Reserved
  • 7. Public Awareness7 ©2012 Deltek, Inc. All Rights Reserved
  • 8. Public Awareness of the IssueLittle or none (even in the GovCon community) despite thenew rule at DFARS 215.408Rule promulgated in response to requirement of Section 852of FY2007 NDAA which required DOD to prescribe regulationsnot later than 1 May 2007 to…“ensure that pass-through charges on contracts andsubcontracts that are entered into for or on behalf of DoD arenot excessive in relation to the cost of work performed by therelevant contractor or subcontractor”8 ©2012 Deltek, Inc. All Rights Reserved
  • 9. Public Awareness of the IssueSurfaced in the 2008 Presidential Campaigns when SenatorJohn McCain introduced it in stump speeches  Referred to the issue as “layer cake contracting”  Speeches cited examples of cost doubled or tripled through layers  No specifics ever presentedPublic response was a resounding yawnCongressional response somewhat more alert9 ©2012 Deltek, Inc. All Rights Reserved
  • 10. Enabling Legislation & Chronology10 ©2012 Deltek, Inc. All Rights Reserved
  • 11. Enabling LegislationAnticipating yet another failure of the Clean Contracting Act…  Representative Waxman inserted the entire bill into the FY2009 NDAA (HR 5658) as an amendment  One Section entitled “Anti-Fraud Provisions”  Another entitled “Curbing Abuse-Prone Contracts”  Another entitled “Excessive Pass-Through Costs”11 ©2012 Deltek, Inc. All Rights Reserved
  • 12. Enabling LegislationSection 866 of the FY2009 NDAA required new regulation within one year to… “minimize the excessive use by contractors of subcontractors, or of tiers of subcontractors, that add no or negligible value, and to ensure that neither a contractor nor a subcontractor receives indirect costs or profit on work performed by a lower tier subcontractor to which the higher- tier contractor or subcontractor adds no, or negligible, value.”Passage of the NDAA on 14 October 2008 kicked off therule-making processApplies to all Agencies even though initiated in the NDAA12 ©2012 Deltek, Inc. All Rights Reserved
  • 13. ChronologyRegulation  14 October 2009 – Interim rule published for comment  14 December 2009 – Comment period ended  13 December 2010 – Final rule published in the Federal Register  13 January 2011 – Final Rule became effectiveImplementation  18 February 2011 – DCAA issued Audit Guidance on the new FAR provisions (AGM 11-PSP-003)13 ©2012 Deltek, Inc. All Rights Reserved
  • 14. The FAR Changes14 ©2012 Deltek, Inc. All Rights Reserved
  • 15. The FAR ChangesFAR changes included…  Prohibition on excessive pass-through charges on cost-type contracts with civilian agencies in excess of the simplified acquisition threshold  Prohibition on excessive pass-through charges on cost-type contracts with DOD in excess of the $650k (exception for FFPs w/ adequate price competition and for commercial items)  Flowdown requirement  Reporting requirement…  In proposals when proposed subcontracting would exceed 70%, or  After award when actual subcontracting exceeds 70%15 ©2012 Deltek, Inc. All Rights Reserved
  • 16. The FAR Mechanisms16 ©2012 Deltek, Inc. All Rights Reserved
  • 17. The FAR MechanismsNew instructions to Contracting Officers  In FAR Part 15, 15.408(n) – The Contracting Officer shall insert the new solicitation provision (52.215-22) in all contracts…  In civilian agencies, in cost-type contracts over $100k  In DOD, in all contracts over $650k except certain FFPs with adequate price competition or for commercial items  Resulting contracts are to include the new clause (52.215-23)No instructions on monitoring or reporting17 ©2012 Deltek, Inc. All Rights Reserved
  • 18. The New Solicitation ProvisionThe new solicitation provision at FAR 52.215-22 is entitled “Limitations on Pass-Through Charges – Identification of Subcontractor Effort”The provision requires…  That excessive pass-through charges be excluded from the proposal  That the proposal identify $ amount of work to be performed by subs  If subcontracted work is in excess of 70% of total cost…  Requires Prime to describe and substantiate the value added (indirect)  Requires Prime to identify $ amount of of indirect cost and profit applicable to (each) sub’s work  A flowdown clause to subs for proposal purposes18 ©2012 Deltek, Inc. All Rights Reserved
  • 19. The New Contract ClauseThe new clause at FAR 52.215-23 is entitled “Limitations on Pass-Through Charges”The clause includes…  A statement that the Government will not pay excessive pass-through charges  A provision for the Contracting Officer to determine if excessive pass- through charges exist  A reporting requirement  A statement that excessive pass-through charges are unallowable  A flowdown requirement (subs report to the Prime, Prime reports to the Government)19 ©2012 Deltek, Inc. All Rights Reserved
  • 20. DCAA Audit Guidance Their Interpretation of the Rule and The Effect of the Audit Guidance20 ©2012 Deltek, Inc. All Rights Reserved
  • 21. DCAA Audit GuidanceDCAA issued guidance in the form of AGM 11-PSP-003 on18 February 2011Memo states, in part… “as part of a forward proposal pricing audit, auditors should perform procedures to evaluate a contractors proposed support to demonstrate its added value when the proposed subcontracts are expected to exceed 70 percent of the total costs of the work performed”It further directs… “during incurred cost audits and evaluations of final vouchers, auditors should also perform procedures to test compliance with the subject FAR provisions”21 ©2012 Deltek, Inc. All Rights Reserved
  • 22. DCAA Audit GuidanceOne more time… “during incurred cost audits and evaluations of final vouchers, auditors should also perform procedures to test compliance with the subject FAR provisions”22 ©2012 Deltek, Inc. All Rights Reserved
  • 23. Their Misinterpretation of the RuleFAR requires “a description of the added value it (the Prime)will provide”The AGM requires auditors to “evaluate the reasonableness ofthe contractor’s description and supporting documentation ofthe added value”Neither “reasonableness of the description” nor “supportingdocumentation for the added value” are required by the FAR23 ©2012 Deltek, Inc. All Rights Reserved
  • 24. Their Misinterpretation of the RuleOn final vouchers, the AGM requires auditors to “provide adescription and a demonstration of the added value by thecontractor”Directs auditors to question pass-through costs and profits asexcessive if “the contractor cannot demonstrate its addedvalue efforts”AGM reminds auditors that “functions/costs not determinedexcessive under FAR 31.203(i) are still subject to the general(FAR 31.2) allowability, allocability, and reasonablenesscriteria”24 ©2012 Deltek, Inc. All Rights Reserved
  • 25. Likely Effects of the AGMWhether a proposal, a contract or a delivery order…  G&A and profits will likely be questioned when sub costs exceed 70% regardless of documentation of value added efforts  Most CO’s will simply adopt the recommendations  The new FAR solicitation provision and contract clause will almost certainly be misusedThe clause has already appeared in commercial item acquisitions despite exceptionOne protest of such use in a DLA solicitation has already been denied25 ©2012 Deltek, Inc. All Rights Reserved
  • 26. Contractor Exposure26 ©2012 Deltek, Inc. All Rights Reserved
  • 27. Contractor ExposureIntent of changes is for PCO to make a pre-determination thatpass-through charges are excessive and unallowableNO REQUIREMENT for PCO to make any determinationFailure to do so does not protect contractor from futuredeterminationNo provision for prospective determination of allowabilityGovernment gets as many bites of this apple as it wants!27 ©2012 Deltek, Inc. All Rights Reserved
  • 28. Contractor ExposureFailure to comply with reporting requirement is contractualnon-complianceCould result in finding of significant system deficiencyAGM 11-PSP-003 specifically states… “If the auditor finds through the procedures below that the contractor failed to comply with the requirements of FAR 52.215-23(c), this should be considered an accounting and/or purchasing system deficiency.”For all contracts where sub costs exceed 70%, AGM says… “If the contractor cannot demonstrate its “added value” efforts, then the indirect costs (and profit) added by the contractor to the subcontracted work should be questioned.”28 ©2012 Deltek, Inc. All Rights Reserved
  • 29. Contractor ExposureAGM requires review of pass-through costs in…  Proposals  Incurred cost submissions  Final voucher review but NO OTHER TIME!Issue may surface in proposal reviewIf not, any opinion by DCAA on allowability of pass-throughcosts may not be expressed until YEARS after the costs wereincurred reported and billedThe new clause treats each delivery order separately29 ©2012 Deltek, Inc. All Rights Reserved
  • 30. Mitigation Strategies30 ©2012 Deltek, Inc. All Rights Reserved
  • 31. Mitigation StrategiesConsider a Value Added G&A base if large teams or high subcontent are part of your business model or strategy  FAR 52.215-23 contains a specific exception for “subcontract management costs”  Costs to be disallowed are “other than charges for the costs of managing subcontracts and any applicable indirect costs and associated profit/fee based on such costs”Seems to specifically exempt the traditional (M&SH) rate fromdisallowanceExclusion of subs from G&A base could result in a nearautomatic recommendation of no profit by DCAA31 ©2012 Deltek, Inc. All Rights Reserved
  • 32. Mitigation StrategiesCarefully document functions performed with respect to subsDevelop a standardized description of value added effortsperformed and make sure it’s included in EVERY proposalExamine teams very carefully  Large team/order pass-through strategies may be less attractive unless  Orders are to be fixed price and competed, or  Prime will perform at least 30% of each orderMonitor subcontract content of all contracts and makereporting standardMake sure EVERY contract brief contains description of valueadded efforts performed for that contract32 ©2012 Deltek, Inc. All Rights Reserved
  • 33. A Look Forward33 ©2012 Deltek, Inc. All Rights Reserved
  • 34. A Look ForwardFAR changes could have implications for IDIQ programswhere pass-through is common and often near 100%  Seaport-e orders are heavily cost-type and sometimes 99% sub’ed  G&A and profit may be unallowable on such orders  Other IDIQ MAC programs may be similarly affectedBecause emphasis is on examination during the ICS and finalvoucher review, it may be years before we know34 ©2012 Deltek, Inc. All Rights Reserved
  • 35. Questions?35 ©2012 Deltek, Inc. All Rights Reserved