9 Industry Benchmarks for Sound Scheduling

282

Published on

As the leader in project analytics, Deltek has unique insight into the key building blocks to a perfect CPM …

As the leader in project analytics, Deltek has unique insight into the key building blocks to a perfect CPM
schedule and where, in an industry, projects are missing the mark. With the cloud-based project benchmarking
utility built into Deltek Acumen Fuse®, projects of all sizes and scope are analyzed against 9 proven
indicators of schedule quality. 5,000 projects later, the average results of this analysis are in...

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
282
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. 9 Industry Benchmarks for Sound Scheduling The median score for each of the 9 schedule quality metrics for all 5,000 anaylzed projects is show below. As the leader in project analytics, Deltek has unique insight into the key building blocks to a perfect CPM schedule and where, in an industry, projects are missing the mark. With the cloud-based project benchmarking utility built into Deltek Acumen Fuse®, projects of all sizes and scope are analyzed against 9 proven indicators of schedule quality. 5,000 projects later, the average results of this analysis are in... How does your project stack up? PROJECTS Evaluated against 9 Schedule Quality Metrics There was an average quality score of: 58only 15% scored above the pass mark of 75 However, as more and more projects adopt Fuse, AVERAGE SCHEDULE QUALITY IS IMPROVING Launch of Fuse’s Cloud-Based Benchmarking Today AverageScore Insufficient DetailTM Number of Lags Number of Leads Merge HotspotTM Missing Logic Average percentage of activities that are missing a predecessor, a successor or both Logic Density TM Average number of logic links per activity across all analyzed schedules Critical Average percentage of activities across all analyzed schedules that are critical Hard Constraints Average percentage of activities that contain a “Must Finish On” or “Must Start On” constraint Negative Float Average percentage of activities across all analyzed schedules that have negative float Average percentage of activities that have a duration greater than 10% of the project duration Average percentage of activities that are being driven by a lag Average percentage of activities that are being driven by a lead or negative lag Average percentage of activities that have a high number of predecessors Use the free, web-based Schedule IndexTM Calculator to get your project scores and find out how you compare. www.deltek.com/schedule-index *Data collected through Deltek Acumen Fuse's cloud-based benchmarking utility 3.02 19% 23% 2% 8% 12% 14% 3% 10%

×