Portfolio September 2009

  • 1,984 views
Uploaded on

 

More in: Design , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
No Downloads

Views

Total Views
1,984
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
366
Comments
1
Likes
1

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Deirdre Gaffney Architect PORTFOLIO 2006 › BEE › Bachelor of Architecture - Final Project selected by Queensland University of Technology http://shapeofthingstocome.ci.qut.edu.au/?q=students/deirdre-gaffney
  • 2. EMAIL deirdregaffney@hotmail.com CONTACT Deirdre Gaffney Oman (+968) 97 215 213 Architect Dubai (+971) 566 9211 58 CURRENT ADDRESS B.BEnv. Architectural Studies / B.Architecture Al Azaiba, Muscat, OMAN Personal Date of Birth 24 March 1983 Marital Status Single Visas Australian Citizen / Passport holder UAE Residency Expiry - Sep 2011 Drivers Licences Qld, Australia Expiry - 2013 UAE Expiry – 2018 Education Queensland University of Technology Bachelor of Built Environment (Architectural Studies), Brisbane Australia 2003 Bachelor of Architecture, Brisbane, Australia. 2006. Final Architectural design project selected to represent QUT ‘The Shape of Things to come’ exhibition, 2007 http://shapeofthingstocome.ci.qut.edu.au/ Royal Australian Institute of Architects Student Member 2002-2006 inclusive. Participant of the 2003 student exchange program – Tongji University, Shanghai 2003. Undergraduate thesis research involved a 6-week endeavour to the UK & Europe 2005. Experience July 2008 to Jan 2009 - Earc, Dubai - Architect (Full Time) Jan 2009 to present - Earc, Muscat www.earc.com.au Engaged on a full time 3-year contract in Dubai, United Arab Emirates by an Australian-based company, owned and operated by multi-award winning architect Noel Robinson. Role to provide assistance to the practice manager in establishing the company’s new premier design branch office in Dubai. Recent relocation to Muscat office to assist with major projects. Preparation of prequalification documents, fee proposals, marketing strategies and conducting business networking events including an earc company launch at Cityscape Dubai. Organisation of a Cityscape Dubai stand build and advertising materials. Design and presentation of a number of 5 star conceptual and masterplanning projects for middle- eastern clients. January 2005 to November 2006 Ellivo Architects, Brisbane - Student Architect (Full Time) November 2006 to June 2008 www.ellivo.com - Graduate Architect (Full Time) Completion of various residential, commercial and development projects under the sole supervi- sion of company directors & project architects. Participated in on-site measure and inspections. Liase with consultant teams, co-ordination of documentation, and chairing of consultant meetings, preparation of meeting minutes & client design presentations. Design Development, BA/ DA Drawings, Construction Drawings and 3D Renderings. August 2002 to December 2004 Suters Architects, Brisbane - Architectural Assistant www.sutersarchitects.com.au (Full Time) Participated in a team to assist the Project Architect on various hospital, health care, commercial tenancy interior fit-outs, multi-residential and residential projects. Liase with consultant teams and co-ordination of documentation under the supervision of senior associates. Schematic Design, Design Development, Construction Drawings and 3D Renderings. Preparation and presentation of 3D Models, interior designs, joinery designs, colour and sample
  • 3. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Dubai Gateway Dubai, United Arab Emirates Masterplanned multi-use development on prime position land in Al Jadaf, Dubai, involving G+30 height allowance. Includes the preparation of numerous design options and area calculations studies for a Kuwait-based development client, 3D massing studies and submission to the Dubai EMPLOYER Municipality. Currently awaiting approvals. EARC DUBAI / NOEL ROBINSON ARCHITECTS Estimated $200m CLIENT EXPLORE INVESTMENTS
  • 4. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Deep Dive Dubai, United Arab Emirates Conceptual project commissioned by Geneva-based development company for a new world-class deep dive facility based in Dubai with the view to develop the same concept in further locations around the world such as Russia and New York. EMPLOYER EARC DUBAI / Deep Dive Dubai seeks to encapsulate in a single building the holistic nature of the diving experi- NOEL ROBINSON ARCHITECTS ence from its immediate sense of enjoyment and discovery to its broader context of training, science and education. The proposed complex is a unique opportunity to develop an entity that CLIENT will be a point of reference for the divers of the world. The architecture has been considered as SELECT NY an assemblage of minimalistic and pure forms that are independent of each other but overlap and interlock to form a more complex object, like the mechanism of a watch. Estimated $200m
  • 5. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Government Guest House Muscat, Oman Schematic Concept Design for a 5-star Government Guest House on prime-position land over- looking the omani coastline. Parliamentary guests including heads of state, prime ministers and their entourage will be housed in VIP guest suites including a 40-room hotel, 200 capacity function EMPLOYER facility and private serviced apartments. EARC DUBAI / NOEL ROBINSON ARCHITECTS Currently awaiting signoff to proceed with design development. CLIENT Estimated 10m Euros build price. SULTANATE OF OMAN
  • 6. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Government Guest House Muscat, Oman Schematic Concept Design for a 5-star Government Guest House on prime-position land over- looking the omani coastline. Parliamentary guests including heads of state, prime ministers and their entourage will be housed in VIP guest suites including a 40-room hotel, 200 capacity function EMPLOYER facility and private serviced apartments. EARC DUBAI / NOEL ROBINSON ARCHITECTS Currently awaiting signoff to proceed with design development. CLIENT Estimated 20m Euros build price. SULTANATE OF OMAN
  • 7. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Sohar University Sohar, Oman earc was appointed by Sohar University to design and document 12 buildings within the two- hectare campus on the back of their intiial master planning commission. EMPLOYER Assistance to the team involved tender documentation and 3D visualisation of 4 of the main EARC DUBAI / campus Stage 1 Buildings. NOEL ROBINSON ARCHITECTS CLIENT Estiamated $120m SOHAR UNIVERSITY
  • 8. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Muscat Municipality Recreation Club Muscat, Oman Masterplanned VIP recreational club development on prime position land in Muscat, Oman, involving community facilities for use by the Muscat Municipality and it’s employees. Includes fa- cilities such as a 5-star hammam, gymnasium, indoor pool and mens/ladies quarters, 200 capacity EMPLOYER function facility, and prestige beach-front recreational facilities. EARC DUBAI / NOEL ROBINSON ARCHITECTS Currently awaiting signoff to proceed with design development with the view to further develop masterplans of adjacent sites. CLIENT MUSCAT MUNICIPALITY Estimated $100m
  • 9. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Al Azaiba Hotel Muscat, Oman earc was appointed to provide a number of conceptual designs and preliminary feasilibility studies for a new 4 star hotel on prime position property in the heart of a tourism precinct in Muscat. Involvement including concept design, 3D visualisation and presentation to the Sheikh. Drawings EMPLOYER prepared in softline sketch and sketchup 7. EARC DUBAI / NOEL ROBINSON ARCHITECTS CLIENT SHEIKH MOHAMMAD
  • 10. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Al Azaiba Hotel Muscat, Oman earc was appointed to provide a number of conceptual designs and preliminary feasilibility studies for a new 4 star hotel on prime position property in the heart of a tourism precinct in Muscat. Involvement including concept design, 3D visualisation and presentation to the Sheikh. Drawings EMPLOYER prepared in softline sketch and sketchup 7. EARC DUBAI / NOEL ROBINSON ARCHITECTS
  • 11. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Al Mawalih Mixed Use Development Muscat, Oman Masterplanned multi-use development in Al Sahwa, Oman involving G+5 commercial height allowance. Includes the preparation of numerous design options and area calculations studies for feasibility / subdivision approval, 3D massing studies and submission to the Muscat Municipality. EMPLOYER EARC DUBAI / Currently awaiting client signoff to proceed with design development. NOEL ROBINSON ARCHITECTS Estimated $200m CLIENT MAJAN DEVELOPMENT COMPANY OVERLOOKING: Overlooking of duplexes has been controlled by the separation to the residential units of the internal road s providing a distance in excess of twenty (20) metres. s has been provided in three parts - centrally in Zones A, D and E. Each duplex will also be provided with screening devices where appropriate. n and leisure activities for access by all residents. RETAIL / COMMERCIAL: The retail / commercial component is located at ground oor level at the perimeter of the site providing easy ded on site attached to each residence. from both outside and from within the site, maintaining residents privacy. will be provided via access to a basement carpark. cial zones will be provided in the basement. e alongside the internal road system. mmercial sector is proposed to be located on eitherside of theEntry Project Features: Sence of Comunity spirit Social Interactivity MDC Al Mawalih Provision of open comunal space ured by maintaining a minimum Master Planning - setback to any plot Integrated landscaped environment ) of six (6) metres and between residential buildings a integrated vehicular movement with the provision of ample open and besment carparking Adding value to the surrounding neighbourhood Provision of neighbourhood school and hospital Provision of a ordable alternate living styles Value added facility for the surrounding neighbourhood h MDC Al Mawalih Developments in surrounding area - 3D Massing Study tion MDC Al Mawalih - 3D Massing Study Adjoining Developments + Height Analysis - Analysis of heights and adoining development densities
  • 12. DEIRDRE GAFFNEY PORTFOLIO OF WORKS ‘The Boulevard’ Buranda TOD, Brisbane, Australia Masterplanned multi-use Transit Oriented Development (TOD) involving G+25 residential, hotel and office towers. EMPLOYER Currently awaiting Development Approval. EARC DUBAI / NOEL ROBINSON ARCHITECTS CLIENT ANTHONY JOHN GROUP
  • 13. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Santai Saltwater Resort Townsville, Queensland, Australia The first stage of the city’s prime waterfront development sites, Santai Resort Townsville (Lot 3), is a $150 million waterfront project, approved by the council in July 2008. EMPLOYER Forming a part of a masterplanned Saltwater development proposed by Resort Corp next to EARC DUBAI / Jupiters casino, the mixed-use project of around 450 units built around an `eat street’ restaurant NOEL ROBINSON ARCHITECTS and retail hub features a 15-level tower as the centrepiece. CLIENT Estimated $500 million RESORTCORP http://www.saltwatertownsville.com.au/
  • 14. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Noosa North Shore Resort Noosa, Queensland, Australia Residential development in state-protected bushland involving the design and documentation of 17 individual holiday homes over 3 stages, an undertaking shared amongst 5 multi-award winning Queensland architectural practices. Each residence averages 280m². Lightweight construction, EMPLOYER including fibre cement, timber weatherboard, metal cladding & glazing. ELLIVO ARCHITECTS Stage 1 complete Aug 2007. Stage 2 currently under construction. CLIENT $70m Budget PETRAC http://www.noosanorthshore.com.au/
  • 15. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Jade Luxury Apartments Gold Coast, Queensland, Australia Hi-end residential tower project including 13 apartments, each boasting an exclusive level and private plunge pool within the building. Building floor plate averages 300m² including maid’s quar- ters. In-situ and precast concrete construction, including glazing and cladding including imported EMPLOYER stones and metal. ELLIVO ARCHITECTS Construction completed October 2006. CLIENT $50m Budget BEZZINA http://www.bezzina.com.au/sitehome.aspx
  • 16. DEIRDRE GAFFNEY PORTFOLIO OF WORKS 38 Riverwalk Avenue Residential Robina, Queensland, Australia Rising tall and elegant at the heart of Riverwalk and overlooking a tranquil lake, 38 Riverwalk Av- enue is the signature Riverwalk address. Multi-residential apartment tower project aimed at afford- able inner-city living demographic within Robina city centre, Gold Coast. The 39 apartments and EMPLOYER 4 penthouses are all north east facing, featuring luxuries such as a porte-cochere, reception, pool ELLIVO ARCHITECTS and function area. Apartments average 100-120 m². Masonry construction, including lightweight FC cladding & cantilevering roof designs. CLIENT Construction complete October 2008. ROBINA LAND CORPORATION $20m Budget http://www.robina.com.au/38-riverwalk-avenue.html
  • 17. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Cairns Hilton Hotel Cairns, Queensland, Australia Mixed-use masterplan for a 25,000sqm hotel development on a prime-position vacant block of land in the heart of Cairns city, North Queensland. With the assistance of a company director, we shaped the building to meet the client’s request that the project be the ‘most photographed and EMPLOYER iconic building in Cairns’, incorporating a major podium level public ‘thoroughfare’ and several ELLIVO ARCHITECTS water features and exposed wet-edge pools to the eastern street frontage. The 15-storey tower aimed at a 250-room hotel for the anticipated new ‘Hilton’ tenant, a mixture of private residential beach-view apartments and penthouse opportunities, 2 stories of office-commercial space and podium-level retail. Estimated $120m Budget
  • 18. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Market Street Development Indooroopilly, Queensland, Australia Commercial/ Retail development including 6 strata-titled tenancies to be retro-fitted post- construction. Development site area including external works of 1130 m² involving construction documentation in Revit for tender purposes. Masonry construction, including glazing, lightweight EMPLOYER infill panels and external works. ELLIVO ARCHITECTS Construction to commence March 2008. $1m Budget 5 cm CONSTRUCTION NOTES: 1. REFER TO THESE DRAWINGS IN CONJUNCTION WITH ALL SCHEDULES AND 4 OTHER DOCUMENTATION PROVIDED BY PLANIT ARCHITECTS. 3 2. REFER TO THESE DRAWINGS IN CONJUNCTION WITH THE PROJECT SPECIFICATION(S) AND OTHER DOCUMENTATION PROVIDED BY THE PROJECT 2 MANAGER AND DOUMENTATION PROVIDED BY CONSULTANTS TO THE PROJECT. H G F E D C B A D 3. REFER ANY DISCREPANCIES TO THE PROJECT MANAGER AND COPY THEC 1 6310 7480 2110 2780 2610 5800 5590 CORESPONDANCE TO PLANIT ARCHITECTS. 2610 0 DATE REVISION ISSUE 11-12-07 PRELIMINARY ISSUE P1 Top of Lift over-run height to be confirmed. 2 1 2 1 Flash over entire parapet perimeter. A3-102 A3-103 A3-103 A3-104 22-01-08 PRELIMINARY ISSUE Top of Parapet BA 14-02-08 PRELIMINARY ISSUE 01 18100 Lift construction to be confirmed Site Boundary Line Site Boundary Line 6 upon sucessful tender of manufacturer. A6-301 8 A6-301 Refer to manufacturer's Top of Parapet recommendations and check structural RB HFC RB 18100 engineering requirements onsite. SC1 HFC Webforge - 1m spans (width) 2240 SGN-07 2 SGN-06 HFC RB SC1 Roof Pitching Point with associated A3-103 RB 1 fixings to 15860 FG FG ? A5-201 perimeter edge beam. SGN-02 LIFT 2760 W-12 W-32 W-33 HFC 20 150 20 10 RB GB SCR-04 screen to detail Level 1 OVER-RUN 10000 SGN-05 ? SC1 13100 190 x 50mm top plate rail along Trimming Galvanised Trimdek roof sheeting full length of balutrade edge. 300 DISCLAIMER HFC RB SGN-08 50 6 CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE FG RB Purlin COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN 4000 W-07 W-06 W-05 W-04 W-03 Fascia Truss 150mm wide x PERMISSION OF PLANIT ARCHITECTURE AND MANAGEMENT P/L. 652mm high as required by Perimeter Beam 4200 SGN-01 KEY PLAN: 652 GB structural eng. along full length Ground Floor RB PT4 of balustrade edge. RB RB RB RB 9100 1000 PT4 105 6 50 SCR-02 screen to detail FC lining on 20mm furring 190 x 50mm top plate rail along channels direct fixed to u/s full length of balutrade edge. 30 raking structure over. Refer MATERIALS LEGEND: East Elevation to elevation for raked ceiling 1 opening height 1 : 100 pitching point heights. 200 AFFL ABOVE FINISHED FLOOR LEVEL to be confirmed AWN AWNING BA BATTENS, ALUMINIUM BT BATTENS, TIMBER 100mm steel posts at CEN CENTRE POINT centres nominated on 5 cm CONSTRUCTION NOTES: CH CEILING HEIGHT architect's elevation drawings CO COLORBOND ROOF SHEETING 310 A B C D E F G H DO DRAIN OUTLET 1. REFER TO THESE DRAWINGS IN CONJUNCTION WITH ALL SCHEDULES AND 4 DP DOWNPIPE (SPIRAL GALV U.N.O) 5590 5800 2610 2780 2110 7480 6360 OTHER DOCUMENTATION PROVIDED BY PLANIT ARCHITECTS. 20 150 0 30 FFL FINISHED FLOOR LEVEL FG FIXED GLAZING 3 2. REFER TO THESE DRAWINGS IN CONJUNCTION WITH THE PROJECT H G F E D C B A LIFT SPECIFICATION(S) AND OTHER DOCUMENTATION PROVIDED BY THE PROJECT 50 100 FGD FHR FIXED GLAZED DOOR FIRE HOSE REEL 2 1 2 2 CORE 100mm spiral MANAGER AND DOUMENTATION PROVIDED BY CONSULTANTS TO THE PROJECT. 190 x 50mm top plate rail along HFC HARDIES FLUSH-SET FC CLADDING 6310 A3-104 7480 A3-103 2110 2780 2610 5800A3-102 5590 200 full length of balutrade edge. HYD HYDRAULIC PIPEWORK 3. REFERdownpipe galv ANY DISCREPANCIES TO THE PROJECT MANAGER AND COPY THE 50 6 Site Boundary Line Site Boundary Line 1 LV VENTILATION LOUVRES behind CORESPONDANCE TO PLANIT ARCHITECTS. MC SELECT METAL WALL CLADDING 2 2 3 2 1 1 PEN MASONRY PENETRATION Allow 50mm fixing gap between 0 A3-202 A3-202 A3-102 A3-103 A3-104 PFC HOT DIPPED GALVANIZED, A3-103 DATE members for fixing of 50x10mm WELDED PARALLEL FLANGE CHANNEL + PAINT FINISH REVISION ISSUE 1312 808 RB welded plates. RENDERED/PAINTED MASONRY 20-12-07 PRELIMINARY ISSUE P1 RDL RECESSED DOWNLIGHT 1 Fascia Truss 150mm wide x 950 Sim A3-103 Tiled surface T1 RWH RAINWATER HEAD 3 Top of Parapet S SIGNAGE 950mm high as required by 22-01-08PANEL TO CONTRACTOR'S DETAIL PRELIMINARY ISSUE BA Site Boundary Line FALL FALL A/C 14-02-08 PRELIMINARY ISSUE 01 structural eng. along full SC1 SCYON MATRIX CLADDING (HARDIES) 18100 10 20 1000 A5-103 Unit RB RB behind ? SCR SCREEN TO DETAIL Allow minimum length of balustrade edge. 2240 Line of parapet behind Trafficable A/C Ductwork as Line of lift core parapet SGD SLIDING GLASS DOOR 200mm clear zone Walkway & A/C per Mech Eng's behind for select light fittings. plant decks to detail Documentationl SP DRAINAGE SPITTER Top of Parapet Roof Pitching Point eaves beam to Sim SPR DOWNPIPE SPREADER RB HFC structural eng's SC1 1 18100 SSL STRUCTURAL SLAB LEVEL 450w x 150d Box Gutter to detail 15860 detail STF STEEL TROWEL FINISH 20 10 2240 A5-101 TD GALVANIZED TRIMDEK ROOF SHEETING 2760 TFC HOT DIPPED GALVANIZED, Roof Pitching Point WELDED TAPERED FLANGE 2 PT4 PT4 CHANNEL + PAINT FINISH 310 VP VENT PIPE TO HYDRAULIC ENG'S SPECS 1500 Level 1 15860 10000 ? PT4 Line of Signage to contractor's detail outline painted SHS in wall behind bulkhead over Drained Awning 30mm cladding zone allowance solid balustrade to detail 13100 entry behind Slab similar detail to 2760 TENANCY 6 access bridge Drained balcony slab either side of steel posts 7 lightweight stud wall infill between SHS posts A5-201 FALL FALL Level 1 4000 TFC to slab edge 13100 Drained balcony slab - 50mm maximum cast-in pipework at minimum 350 6 N allowable fall to hyd eng's specification. Dean Fleming VERIFY ALL DIMENSIONS ON SITE BEFORE A/C Ductwork as Ground Floor per Mech Eng's DISCLAIMER 4000 A5-201 D-03 CLIENT CONTRACTORS ARE TO COMMENCING ANY of 150SHS post behind Pty Line WORK OR PRODUCING SHOP DRAWINGS. THESE Documentationl 9100 ramped concrete Ltd 1000 TENANCY 1 LIFT driveway surface to DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY STAIR Carpark Level KITCHENETTE structural & civil NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN VOID Planter to landscape engineer's specifications. Planter to landscape Column in carpark below PERMISSION OF PLANIT ARCHITECTURE AND MANAGEMENT P/L. 8100 detail drawings CORE 90/90/90 FRL Masonry wall behind entry ramp to detail detail drawings applied waterproofing to Planter to landscape Ground Floor retaining wall surface where detail drawings 100mm spiral galv downpipe Commercial Development KEY PLAN: column at shown below finished ground level. RB 9100 behind 1000 Carpark Level PROJECT 11 Market Street, Indooroopilly locations on plans 8100 West Elevation Lots 1 & 3 on SP158414 2 1 : 100 DRAWING Building Elevations - East & 2 West A3-201 06-063 SP/DG JOB NUMBER DESIGN / DRAWN Section C-C Detail Section - Access Bridge Balcony 1 1 : 100 1 A1 SCALE MATERIALS LEGEND: As indicated DATE CREATED 06/12/07 1 : 20 A2-102 01 ABOVE FINISHED FLOOR LEVEL ISSUE DRAWING AFFL AWN AWNING No. BA BATTENS, ALUMINIUM BT BATTENS, TIMBER 1 2 1 ISSUED FOR CEN CENTRE POINT CHITECTS T:[07] 3831 5055 F:[07] 3831 5066 W:planitarc.com.au E:planit@planitarc.com.au ACN 082 197 966 PRICING A3-101 A3-101 A3-102 LEVEL 1, 112 BARRY PDE FORTITUDE VALLEY PO BOX 494 SPRING HILL Q 4004 CH CEILING HEIGHT 0 1 2 3 4 5 cm CO COLORBOND ROOF SHEETING DO DRAIN OUTLET DP DOWNPIPE (SPIRAL GALV U.N.O) 03 04 05 06 07 08 FFL FINISHED FLOOR LEVEL FG FIXED GLAZING 5590 5850 12000 2780 1200 3580 3850 FGD FIXED GLAZED DOOR 01 02 FHR FIRE HOSE REEL 5 HFC HARDIES FLUSH-SET FC CLADDING HYD HYDRAULIC PIPEWORK Site Boundary Line ? LV VENTILATION LOUVRES MC SELECT METAL WALL CLADDING PLANIT ARCHITECTS T:[0 PEN MASONRY PENETRATION LEVEL 1, 112 BARRY PDE FORTITUDE VALLEY PO BOX 494 SPRING HILL Q 4004 ramp up to ladder A/C Trafficable A/C A/C top of lift A/C line of parapet behind access point Unit Walkway & A/C Unit Unit over-run Unit PFC HOT DIPPED GALVANIZED, behind plant decks to behind behind behind WELDED PARALLEL FLANGE
  • 19. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Residential Community Development Murwillumbah, NSW, Australia Residential Development in the heart of a small country township in Murwillumbah for low-income demographic. Scheme includes a mix of 2 & 3 bed townhouses & rowhouses on a steeply sloping site. EMPLOYER ELLIVO ARCHITECTS Preparation of all schematic drawings involving cad plans, typical unit design, photoshop eleva- tions, open space and GFA calculations for preliminary approval by council.
  • 20. DEIRDRE GAFFNEY PORTFOLIO OF WORKS Residential Community Development Murwillumbah, NSW, Australia Residential Development in the heart of a small country township in Murwillumbah for low-income demographic. Scheme includes a mix of 2 & 3 bed townhouses & rowhouses on a steeply sloping site. EMPLOYER ELLIVO ARCHITECTS Preparation of all schematic drawings involving cad plans, typical unit design, photoshop eleva- tions, open space and GFA calculations for preliminary approval by council.