Why pmc presentation

1,431 views
1,254 views

Published on

Project Management

Published in: Business, Technology
2 Comments
5 Likes
Statistics
Notes
No Downloads
Views
Total views
1,431
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
0
Comments
2
Likes
5
Embeds 0
No embeds

No notes for slide

Why pmc presentation

  1. 1. Why PMC?<br />
  2. 2. EXPERT<br />Every JOB needs an<br />
  3. 3. Why would a <br />400Cr <br />400Cr <br />Job be any <br />different<br />
  4. 4. 400Cr<br />Dream to<br /> reality <br />STORY<br />
  5. 5. The STEPS <br />
  6. 6. It all starts with<br /> DESIGN<br />
  7. 7. And then comes <br />CONSTRUCTION<br />
  8. 8. However the STORY is not so simple .<br />The Phases are overlapping.<br />DESIGN<br />PHASE<br />CONSTRUCTION PHASE<br />HANDING OVER PHASE<br />
  9. 9. Hence Manpower, Material, Machinery Drawings and Money all have to be Co-Ordinatedand Managed<br />
  10. 10. In the Absence of Such a Managementagency<br />
  11. 11. Failed Project<br />
  12. 12. Civil Contractor<br />Interiors <br />Contractor<br />Lift<br />Vendor<br />Electrical Contractor<br />Plumbing<br />Contractor<br />HVAC<br />Contractor<br />Govt Agencies<br />Consultants<br />There are many Players<br /> in the Game<br />
  13. 13. Total Chaos in Absence of PMC<br />
  14. 14. Plumbing<br />Contractor<br />HVAC<br />Contractor<br />Electrical Contractor<br />Lift<br />Vendor<br />PMC<br />Interiors <br />Contractor<br />Civil Contractor<br />Consultants<br />Govt Agencies<br />
  15. 15. `<br />Unhindered work in presence of PMC<br />
  16. 16. `<br />Cost Overruns<br />Time Overruns<br />COST<br />Without PMC<br />With PMC<br />`<br />TIME<br />
  17. 17.
  18. 18. Quality Assurance/Quality Control<br />
  19. 19. Project Management using Critical Path Method<br />
  20. 20. Why PMC?<br />
  21. 21. Because it Saves Money &time while delivering Quality<br />

×