Your SlideShare is downloading. ×
DCD Census Key Findings SEA 2011-2012
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

DCD Census Key Findings SEA 2011-2012

239
views

Published on

Published in: Travel, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
239
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
9
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Key Findings:South East AsiaThese are the results of the Data Center IndustryCensus conducted between June & July 2011 based onthe responses from data center end-user / operators.©DatacenterDynamics, 2011.©©DatacenterDynamics,2011 Datacenter Dynamics 2011 Key Findings: Singapore & South East Asia Data Center Market
  • 2. Table of contents1. Profile of individuals that completed the census view This section shows the background disciplines, levels of experience, decision making, remuneration and qualifications of the 115 individuals that completed the census.2. Profile of Organisations represented in the census view This section shows the sectors represented, company size and annual turnover of the organisations represented in the sample3. Data Center Infrastructure profile view This section profiles the characteristics of the each data center, provides aggregate results for all DC’s represented in the sample and details the areas of greatest concern to DC operators4. Technology & Investment view This section profiles the investments made in the areas of facility infrastructure, IT optimization and outsourcing of DC operations in individual DC’s. The aggregate levels of investment for the sample are provided5. Market Drivers view This section details the direction the sample believe the DC market is headed in the coming months and years, focusing on the areas of resource availability & costs, regulations & standards and advances in technology©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 3. Notice to all readersYour reading or use of the information contained in this document assumesyour understanding of & consent the following criteria for so doing.Reproduction & Copyright InformationThese slides may be reproduced in full with acknowledgement of the source as‘DatacenterDynamics Global Industry Census 2011’. Reproduction for the purposesof publication is permitted only with the written permission of DatacenterDynamics.Legal DisclaimerThe information shown in this document has been derived from sample research. As with anysample survey the findings may not necessarily be representative of the attitudes or behaviours ofthe entire population from which the sample has been taken. DatacenterDynamics takes no liabilityfor any actions or decisions taken wholly or in part on the basis of the data included herein. Fullinformation on the methodology for data collection & analysis is available online at:www.datacenterdynamics.com/research©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 4. 1.0 Profile of the Individuals thatcompleted the censusThe key findings in this section are based on asample of 115 data center end-users/operators.©DatacenterDynamics, 2011.©©DatacenterDynamics,2011 Datacenter Dynamics 2011
  • 5. 1.1 Profile of Individuals RespondingFrom what professional disciplines do the samples come from& what is their decision making capability? 0.9Job function / professional discipline% total 14.6 20.7 Facility Management Engineering & Support 9.5 IT, Applications Management Networks 13.7 40.6 Operations OtherRoles & responsibilities in relation to data centerRespondent could give more than one answer 40 35 30 25 20 15 10 5 0©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 6. 1.2 Individuals Profile continued.....What level of data center experience doindividuals from the sample have?Number of years in the industry Number of years working for current employerGrouped % total Grouped % total 40.0 40 30.0 30 20.0 20% % 10.0 10 .0 0 Under 1 - 2 yrs 2- 5 yrs 5- 10 yrs Over 10 Under 1 1- 2 yrs 2- 5 yrs 5- 10 yrs Over 10 1yr yrs yr yrsLayers of management representedGrouped % total C-level executive, Board member, Owner Senior manager, VP, Dept head Project or team leader Specalist3 53 30.3 13.6©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 7. 1.3 Individuals Profile continued.....What is the annual remuneration & highest academic qualification of therespondentsAnnual remuneration Highest level of academic qualificationGrouped % total (US$) achieved Grouped % total 40.0 Technical diploma Graduate degree 30.0 Post-graduate degree none of these 20.0 % 10.0 .0 Under 40,001 - 60,001 - 80,001 - Over 12.5 59.1 19.7 4.5 40,000 60,000 80,000 100,000 100,000Work location of respondents 3.4 1.6 1.6% total 16 Singapore Malaysia Thailand Vietnam Other SE Asia 77.3©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 8. 2.0 The Profile of OrganizationsRepresented by this sample©DatacenterDynamics, 2011.©©DatacenterDynamics,2011 Datacenter Dynamics 2011
  • 9. 2.1 Profile of organizationsWhat sectors are represented in the sample, what is their number ofemployees & annual turnover Industry sector classification 17.3% % total 25.5% ICT Telecommunications 11.0% Public Sector 5.5% Banking finnancial services 9.4% Industrial/Manufacturing 4.7% 13.4% 12.6% Healthcare and pharma Energy & utilities Other Annual turnover (US$ Million) Number of employees Grouped % total Grouped % total 30.0 35.0 25.0 30.0 25.0 20.0 % 20.0 15.0 15.0 % 10.0 10.0 5.0 5.0 .0 .0 Under 10 to 50 51-100 101-500 .5-1 bn 1 bn+ 10©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 10. 3.0 Data Center Infrastructure Profile byorganizationThe profile of data centers owned & operated by thesample including both ‘in house’ & ‘outsourced’footprint©DatacenterDynamics, 2011.©©DatacenterDynamics,2011 Datacenter Dynamics 2011
  • 11. 3.1 Data center Infrastructure profileWhat is the shape & size of the data center infrastructure operated byorganizations from our sample?No. of data centers per organization Dedicated space per organizationGrouped % total - (20 racks +) Grouped % total - (white/raised floor m²) 40 40 30 30 20 % 20 % 10 10 0 0 Under 250 251-500 501-1000 1001-2500 2501-5000 5001-25000 Over 25000 1 2--5 6--10 11--25 26--50 51--100 100+ m2 Estimated Sample Total = 3400 facilities Estimated Sample Total = 820,000 m2Number of racks per organization Total power consumption per organizationGrouped % total Grouped % total 60 40 40 30 20 % % 20 10 0 0 Estimated Sample Total = 200,000 racks Estimated Sample Total = 0.75 GW©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 12. 3.2 Profile By organization contd..What is the shape &size of the data center infrastructure operated byorganizations from our sample? continued..... Where is their primary data Outsourced data center footprint center housed? Grouped % total 60 50 40 30 % 20 10 0 None 1%-25% 26%-50% 51%-75% 76%-99% 100% Within an office building Estimated Sample Total = 15,000 outsourced racks Standalone/purpose built facility Rack density Geographical footprint (Infrastructure) Grouped % total % total (based on all racks in sample) Low (up to 5kW) Med (5.1-10kW) High (over 10kW) Local National Regional Global 71.2 14.1 14.7 44.9 8.2 24.5 22.4©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 13. 3.3 Infrastructure GrowthHow does the sample think that their data center infrastructure will changeover the next 12 months? Number of data centers Number of racks (‘000s) Total facility power (GW) Total sample aggregate shown Total sample aggregate shown Total sample aggregate shown 3750 225 1 3700 0.9 220 3650 0.8 3600 215 0.7 3550 210 0.6 3500 0.5 3450 205 0.4 3400 200 0.3 3350 0.2 195 3300 0.1 3250 190 0 2011 2012 2011 2012 2011 2012 +8.8% +9.5% +24% Next 12 months = +300 DC’s Next 12 months = +19,000 Racks Next 12 months = +.18 GW©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 14. 3.4 Mission Critical StaffingWhat level of human resource is dedicated to runningthis infrastructure? Facilities staff per organization IT staff per organizations Grouped % total Grouped % total 50.0 50 40.0 40 30.0 30 % % 20.0 20 10.0 10 .0 0 Under 10 11--50 51-100 Over 100 Under 10 11--50 51-100 Over 100 Estimated Sample Total = 8,700 staff©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 15. 3.5 Data Center MonitoringWith what frequency does the sample monitor energy & environmental factorswithin their data centers?Monitoring% total 100 90 80 70 60 50 40 30 Continuously Occasionally 20 Never 10 0©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 16. 4.0 Technology & InvestmentHow much the sample are investing in their datacenters& what they are investing in©DatacenterDynamics, 2011.©©DatacenterDynamics,2011 Datacenter Dynamics 2011
  • 17. 4.1 Facility InfrastructureWhat facility infrastructure technologies, systems & services are the sampleinvesting in? Infrastructure Technologies & Services % Total Respondents could nominate multiple technologies & services Next 12 months Past 12 months DCIM Monitoring systems Modular solutions Containerized data center solutions Power distribution solutions Cabling & switching infrastructure Cooling infrastructure Building control systems Power protection solutions 0 10 20 30 40 50 60©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 18. 4.2 IT OptimizationWhat IT optimization strategies/technologies are the sample investing in? IT Optimization Strategies % Total Respondents could nominate multiple technologies & services Next 12 months Past 12 months Mainframe computing High performance computing Blade servers Upgrade storage systems Unified computingUpgrade network & routing equipment Upgrade systems management Datacenter automation software User virtualization Application virtualization Server virtualization Cloud architectures 0 5 10 15 20 25 30 35 40 45©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 19. 4.3 OutsourcingWhat type of outsourced data center services are the sample investing in? Outsourcing % Total Respondents could nominate multiple technologies & services Next 12 months Past 12 months Asset leasing Managed services Wholesale colocation services Retail colocation services Public cloud Private cloud Hosting services Application/Software as a service Platform as a service Infrastructure as a service 0 5 10 15 20 25 30©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 20. 4.4 Technology & Investment Levels of investment per technology/strategy area, year on yearIT Optimization Outsourcing Facility InfrastructureTotal sample aggregate shown Total sample aggregate shown Total sample aggregate shown$ US million $ US million $ US million 700 350 1000 300 900 600 800 500 250 700 400 200 600 500 300 150 400 200 100 300 200 100 50 100 0 0 0 2011 2012 2011 2012 2011 2012 150% 181% 190% Next 12 months = + 200 US$ M Next 12 months = + 190 US$ M Next 12 months = + 600 US$ M ©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 21. 5.0 Market DriversThe trends, reasons & concerns behind marketinvestment©DatacenterDynamics, 2011.©©DatacenterDynamics,2011 Datacenter Dynamics 2011
  • 22. 5.1 Regulations & StandardsThe trends, reasons & concerns behind market investmentPerception of future impact of key market trends on operation% Total (across) Significant Moderate Little or None The evolotion of datacenter metrics New and evolving facility accreditation schemes The continuing development of datacenter best practice standards Legislation or taxation to reduce data center energy use/carbon emissions 0% 20% 40% 60% 80% 100%©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 23. 5.2 Resource Availability & CostThe concerns of DC operators going forwardPerception of future impact of key market trends on operation% Total (across) Significant Moderate Little or None Reduced capital expenditure budgets Prospect of water shortages Reduced operating budgets Availability of suitable outsourcing facilities locally Increasing IT capacity needs Prospect of energy shortage/blackouts/brownouts Cost & availability of suitable real estate for DCS Increasing energy costs Increasing labour costs Shortage of suitably skilled/trained staff 0% 20% 40% 60% 80% 100%©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 24. 5.3 Advances in TechnologyWhat technologies will shape DC operations in the futurePerception of future impact of key market trends on operation% Total (across) Significant Moderate Little or None Developments in virtualization Trends towards network convergence Development in monitoring & reporting technologies Development of energy efficinet cooling, power & network technologies Continuing developments in server technologies Advances in cloud services Evolution of containerised data centers Advances in modular design & construction 0% 20% 40% 60% 80% 100%©DatacenterDynamics, 2011. Key Findings: Singapore & South East Asia Data Center Market
  • 25. We hope you found this data of value.Key findings exist for all the markets we work in. GoldMyDCD members have access to all the data sets.This data can be analysed from a variety ofperspectives; if you are interested in speaking to ourresearch department about how you can use thisinsight to achieve genuine market understanding pleaseemail us at: research@datacenterdynamics.com©DatacenterDynamics, 2011.©©DatacenterDynamics,2011 Datacenter Dynamics 2011

×