Your SlideShare is downloading. ×
Building fa qs (1)
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Building fa qs (1)

54

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
54
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Proposed Building Addition FAQsQ. Why are you proposing an addition?A. The library has long had a need for additional computers, and our patrons have repeatedly asked forcomputer classes. This addition will give us the space we need for a minimum of 6 public computers, andwill enable us to hold computer classes and tutorials. In addition, staff will be able to engage in grouplearning activities, which can only help us serve you better! Additionally, we desperately need another public restroom; one that is not in the children’s room. Aconveniently located, handicapped accessible restroom is one of the planned changes.Q. Anything else?A. The west side of the library is the oldest part of the building. If you look at the many ells andindentations, you will see they incorporate numerous roof angles and drainages. Over the years thesehave become problematic and tend to cause leaking at times of heavy rain. The roof would need to beextensively repaired anyway. Why not realign it over a new substructure to prevent future problems andsolve our space needs all at the same time?Q. What else will we see?A. We are very excited about our plans to include landscaping that will incorporate outdoorperformance, programming and story time areas, perennial gardens and benches for reading andreflection. Our intention is to increase the amount of outdoor programs, and we hope to be able to hostconcerts “in the garden” on summer evenings.Q. Why do it now?A. Interest rates are at an all time low, and building costs have dropped. Our Caithness PILOT money(see budget FAQs) is not infinite. It made a lot of sense to our Board of Trustees and our financialadvisors to use Caithness funds toward a permanent benefit for the library and our patrons; one thatwill remain long after the PILOTs have come to an end. A ten year mortgage will be paid off shortlybefore the PILOTs stop. We will not have to have a large budgetary increase at that time if we use it forthis valuable, but finite, purpose.Q. How much will it cost?A. We have estimated the budget for this project at $500,000.00. At prevailing rates we estimate paying$57,000 annually for 10 years in principal and interest, coincidentally, almost the exact amount of ourannual income from Caithness.Q. What does that mean for me, the individual taxpayer?A. This year’s budgetary increase amounts to an additional $5.50 for the average homeowner, or a totalannual library tax of $147.00. That is $12.25 per month; or $2.82 per week for your entire household!Books, movies, programs, computers, homework help, friends, fun and more! Something for everyoneat the Brookhaven Free Library.

×