Lokadalath udupi 2
Upcoming SlideShare
Loading in...5
×
 

Lokadalath udupi 2

on

  • 485 views

udupi district Lokadalath presentation 2nd part

udupi district Lokadalath presentation 2nd part

Statistics

Views

Total Views
485
Views on SlideShare
485
Embed Views
0

Actions

Likes
0
Downloads
3
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Lokadalath udupi 2 Lokadalath udupi 2 Presentation Transcript

  • 1
  • P a n c h a ya th R a jE n g in e e r in g D iv is io n ,U d no. p i Constituency Sl u No of Estimated No of Tanks Expenditure Tanks Amount completed Total 1 Udupi 50 906.00 5 249.70 2 Kundapura 56 623.00 23 210.80 3 Karkala 17 380.00 6 43.83 Minor irrigation 4 15 589.00 6 174.09 dpt. tanks Total 138 2498.00 40 678.36Rural water supply scheme 2011-12 Tanks taken up 1 under 58 212.00 35 113.18 Sustainability 2
  • R W S a n d P R E D iv is io n , U d u p i No of No of Expenditure No of Estimated Tenderd Sl no. Constituency Tanks Tanks Tanks Amount Amount Total tenderd completed 1 Udupi 50 906.00 50 803.05 3 249.70 2 Kundapura 56 623.00 56 533.59 8 210.83 3 Karkala 17 380.00 17 347.20 0 43.83 Total 123 1909.00 123 1683.84 11 504.36 3
  • Total no of No of tanksSl. No. taluk tanks survey done 1 Udupi 158 147 2 Kundapura 188 83 3 Karkala 66 45   Total 412 275 4
  • Rangan KereAvari Kere Desiltation Desiltation 5
  • Rangan kere Desiltation Geru Hadi Desiltation Work 6
  • 1. ¸ ¹ Ñ ‘ Ð 18 - 0 6 - 2 0 11 ¤ Ð · Ð ‘ ¹ Ð ®Ù · Ð À Ð ¦ ¹ Ð ô Ñ Ä Ù Ö Ó ‘ ý Ä · Ñ Ã ³ ý ¹ Ð  ö Ê Ð  ö Ê Ð Ä Ñ Ñ · Ð ì ’ õ ¦ ¦ Ð Ñ A - A c ¦o Ö ÓP ¡l¹a n §aÓ s ³ o n 18Ð- ¤ Ð6 ¸ - 2 0 11 t iÙ n Ù Ñô À 0Sl. Depa Name of Comm Water Encroach Eviction of Improvement required Rs.in lakhsNo. rt Tank ond Spread ment Encroachm ment Area in Area in Area in ent Hect Hect. Hect Area Cost Desilting Wast Sluice Bund Total in Rs. Qty. Amo e / Rs. in Rs. in Hect. In unt Weir Canal lakhs lakhs lakhs Rs. Rs. Rs. in in in lakhs1 2 3 4 5 6 7 8 9 lakhs lakhs 12 10 11 13 141 Minor Kandavara 70.20 12.34 0.69 0.69 1.51 41000. 29.00 12.0 36.00 37.00 114.0 Irrigat Herikere 00 0 0 ion2 Minor Yellur 40.30 3.89 0.30 0.30 0.85 1000.0 1.00 0 0.00 27.00 28.00 Irrigat Dhalanthara 0 ion Kere3 Minor Chantaru 122.72 8.19 0.05 0.05 1.54 11000. 6.00 0 52.00 55.00 113.0 Irrigat Madaga 00 0 ion Kere4 Minor Anekere 49.75 12.40 0 0 0 12000. 10.00 22.0 0 33.00 65.00 Irrigat 00 0 ionÊ Ê Ê 2 8 2 . 3 6 . 8 1. 0 4 1. 0 3 . 9 6 5 0 4 6 . 3 4 . 8 8 . 15 2 3 2 97 2 4 0 0 0 . 0 0 0 0 0 0 .0 0 0 .0 887
  • 888
  • S l Na me of Est Re ma rks . Wo rk im aN teo. c o 1 Improvements to 85.0 Desilting, st Chantaru Madaga 0 strengthening of Tank in Chantaru tank bund, sluice Village, Udupi Taluk replacement and 2 Improvements to 28.0 Underworks. allied Tender Dhalanthra Kere in ( R s process 0 Yellur Village, Udupi . In 3 Improvements to Taluk l49.0 Under Tender ak Kandavara Herikere h 0 ) process s in Kandavara Village, Kundapura Taluk 889
  • Improvements to Chantharu Madaga Kere Before Execution 8810
  • Improvements to Chantharu Madaga Kere During Desilting 8811
  • Improvements to Chantharu Madaga KereDuring Desilting 8812
  • Improvements to Chantharu Madaga KereDuring Bund Improvements 8813
  • Improvements to Chantharu Madaga Kere Contructions of Retaining Wall 8814
  • • Videos of Chantharu madaga Rejuvenation•1•2•3•4 15
  • Compliance on Tree planting,Rejuvenation of water supplycatchments etc 16
  •  Udupi District is one of the Coastal districts ofKarnataka – Geographical area of the district is356446 Ha. The Forests of district forms 28.08% of the area. The Forests are spread mainly in WesternGhats, which is one of the 25 Mega Bio-diversityspots of the world. TOTAL FOREST AREA OF THE DISTRICT. - 1,00,102 Ha. 8817
  • The Forests are managed as per theprescriptions of the Working Plan / Wildlife Management Planapproved by the Government. 8818
  • Kundapura Kuduremukh Social Forestry Forest Division Wildlife Division, Division, Udupi Kundapura forest Kuduremukh wildlife Karkala Social Forestrydivision has filed an division, Karkala has Division, Udupi has affidavit for filed an affidavit for filed an affidavit forafforestation in 5000 275 Ha. of Plantation, raising of 5 LakshHa. Of Government 12500 M3 Soil seedlings in Govt. land, 150 Kms. conservation works, Land, PanchayathRoadside plantation establishing 25 Nos of lands, Schools, and 100 Ha. Of Anti –poaching Roadside and Mangrove camps, 15 Nos. of distribution to FarmersPlantations for next check dams and and the public for five years. ponds, desilting of planting in their lands. tanks, 2000 Kms of Proposed for Fire protection works afforestation in 506 Ha. inside the protected Of Govt lands and 8819
  • Action taken reports- Kundapura Forest DivisionSl Progress as on Programme for . 31-03-2012 the year 2011-12 Activity Seedlin Seedling Target DateN Area in Area gs so. Ha. in Ha. planted planted Block 1619.55 16.07 533 20.871 Plantation Ha. Lakhs Ha. Lakhs Balance Roadside 60.70 0.1214 74 0.26 works filed2 in the plantation Kms Lakhs Kms Lakhs affidavit, Mangrove 0.90 1.10 will be3 15 Ha. - completed Plantation Lakhs Lakhs in the next Coastal five years. 0.303 Green Belt 12 Ha. - - Lakhs plantation 8820
  • Roadside plantation 21
  • Mangrove plantation 22
  • Coastal Green Belt plantation G q À Ä ¦ ª À ®A i À Ä z À º É d ª À i Á r J A § ¡ è U Á ½ , ®ª À A Z À ºÁU À ® ºÉ ®¼ É ºÉ ®£ É § - ¸ À ª À Ä Ä z À æ § ¢ £ É q À Ä v É ® à ¥ À Ä Ð 12 8823
  • Other activities – Kundapura Forest Division Sl. Progress as on Programme for the No Activity 31-03-2012 year 2011-12 . Digging of trench for 1 18 Kms boundary consolidation Soil and moisture conservation 2 982 cum works (Staggered Amount trenches) No. of Compensation paid (Rs. cases 3 paid for wildlife In lakhs) damages 16.43 400 Lakhs Revenue share No. of Share (Rs., given to Village VFCs in lakhs) 4 Forest 57.739 Committees 40 Lakhs 8824
  •  £ À ¢ ªÀ Ä ®®¸À AgÀ PÀ ë uÁP Á A iÀ Ä ð P À æ ª À Ä¢ £ ÁAP À : 11- 0 1- 2 0 11g À AzÀ Ä P É ® ®® è g À ÄU Áæ æ ªÀ Ä zÀ D £ É g À hÄ jJ A § ¡è £ À qÉzÀ “ £ À ¢ªÀ Ä ®® ¸À Ag À P À ë uÁC ©ü A i À i Á £ À ÓP Á A iÀ Ä ð P À æ ª À Ä z À ¡è ¸ Ë ¥ À t 25
  • Sowparniak river on the bank of which Kollur Mookambika temple is located . The river originates at Kodachadri Hill and flows westwards and joins Arabian sea at Gangolli. The main polution of the river is at Kollur , by dumping solid waste to the river and releasing untreated water from all lodges , residential areas Under the save Sowparnika campaign 1. Jatha was arranged on 11-01-2011 at Kollur. 2. Shramadhan was conducted with all Officials and school children to create awareness of safe disposal of solid waste. 3. A waste disposal vehicle of worth 6.00 lakhs is purchased by peoples contribution ( for each room of the lodge `500-00 was collected . 26
  • 27
  • 1. Raising Plantations A) Block plantation - 100 Ha. B) Fruit Yielding Plantation Along Canal Side - 10 km. C) Planting Agave and Vatevaria slips –16 ha.4. Soil and moisture conservation works A) Staggered trenches- 2751 M3 B) Gully checks – 598 M35.Community oriented works A) LP Gas is being provided to 157 beneficiaries. B) 105 Farmers (65 Men, 40 Women) are taken on a exposure trip to upper Krishna Project area inBagalkote (Alamatti). 28
  • 29
  • Action taken reports- Kuduremukh Wildlife Division, Karkala. Progress as on Status as onSl. 18-06-2011 31-03-2012 TargetN Activity Area in Seedlings Area in Seedlings Dateo. Ha. planted Ha. planted Raising fruit 75 Ha. of plantation1 bearing trees in has been raised. - - forest Rs1,34,185 of Compensation paid2 - - compensation paid to to farmers farmers in 51 cases . Balance Creating awareness Three trainings have works filed among villagers to been conducted to the in the3 - - affidavit, reduce man-animal EDC members – b)Kollur will be conflict completed in Gully checks along the Nalas work completed the next five Soil conservation years.4 - - for 4311.85 Cum. 9 works tanks have been Desilted . 369.20 KMs fire Fire Protection5 - - protection works Works have been carried out . 30
  • • A District level committee headed by Deputy Commissioner as Chairman and DCF as member secretary and all the Dist level officers as members is implementing the programme as per govt order Dated 02.02.2010.• 26 families have given their willingness to come out of the park with the suitable compensation.• The Govt of Karnataka has released Rs 98.39 lakhs for implementation of rehabilitation, out of which Rs 98.21lakshs has been disbursed to the 12 families and 13.61 acres of land has been included into the 31
  • 32
  • Action taken reports- Social Forestry Division, Udupi 33
  • List of Village Forest Committees- Kundapura Forest DivisionSl. Range JFPM under JFPM under JFPM under JBIC JFPM under OthersNo. FDA during JBIC during during 2006-07 JBIC during 2005-06 2005-06 2007-08 Kundapur 1)Kodlady, 1)Edurkujnadi 1)Muduru 1) Thrasi 1 1)Karkunje a 2)Aluru 2)Valthur- 2)Jadkal 2)Nujadi 3)Bellala Amparu 3)Shiroor, 4)Yadthare 3)Golihole 2 Byndoor 4)Kalthodu 3)Heroor 5)Yalajith 5)Pirnankila, 4)Thaggarse 3 Udupi 4)Pilaru - - 6)Heggunje 6)Ajri 5)74th Ulloor Shankarna 7)Amasebail, 4 8)Shankarnarayn 5)Hosangady 7)Yadamoge ryana a 8)Rattady- 6)Machchatt Kulanje 9)Hebri u 8)Kenjoor 9)Hosuru, 6)Nalkuru- 10)Byrampalli-41 7)Hengavall 5 Hebri 10)Perdoor Kudi (Shiroor- y Bellampalli) 11)Nooralbettu 7)Todaru- 11)Panapila 9)Idu 2) Valpady 6 Moodbidri , 12)Nalluru Hosabettu 12)Renjala 3)Kadandal 13)Durga, 8)Durga- 13)Shirlalu- - e 7 Karkala 14)Hirgana Muduru 9)Marne- Jarkala Hermunde 14)Kaudoor 15)Sulkerimog 10)Savya, 15)Kukkedi 10)Karimani 8 Venoor ru, 16)Nalkuru 11)Marodi 16)Andinje lu TOTAL 16 Nos. 11 Nos. 16 Nos. 11 Nos. 03 Nos. TOTAL – 57 VFCs formed 11)Kuthloor 34
  • Participatory Rural Appraisal Exercise in Village Forest Committees 35
  • VFC Shares No. of VFCs Formed Share Distributed (Rs. In Lakhs) in the No of No of Through Total Division VFCs VFCs Plantatio Share Year Share Throug Share n Distribute (2005-06 Distribute h MFP Distribute extraction d to d d 2005-0 2011-12) 2 0.0036 0.0036 6 2006-0 6 0.2597 0.2597 7 2007-0 16 0.68634 0.68634 8 2008-0 57 16 2.8197 3 5.68104 8.50074 9 2009-1 31 4.24968 6 27.50804 31.75772 0 2010-1 5 10.15275 10.15275 1 2011-1 4 6.37852 6.37852 2 Ê Ê 8.01902 49.72035 57.73937 36
  • School Forest 37
  • ªÀ Ä U À Ä « U É ®A zÀ Ī À Ä g À Ä A z±Á ¯ Ä gÉ ® A z À Ä U À z À ¡ è PÀ , Á¥ À ÉU À «¨Ásª0 £ À2 À 11- 12 £ Éà ¸ Á ¡£ À ¡èª À £ À ª À Ä º É ® à v À ìª À ªÀ Ä w ÛvÀ g ÉP Á A iÀ Ä ð P À æ ª À Ä U À ½ U Á V2 ,3 0 ,0 0 0 ¸ À ¹U À ¼ À £ À Ä § « « zs À±Á ¯ É ºÁU À ® ¸ À A WÀ ¸À A¸ÉÜ UÀ ¼ ÀD ª À g À t U À ¼ À ¡è V q À £ É q À À ¯ V z É . Á 38
  •  Forest Land diverted for non-forestryactivities Forest land Extent in diversion Cases Ha. 26 324.51Compensatory Plantation raised Forest Land Non-Forest (In Ha.) Land (In Ha.) 369.48 228.43 39
  • Satellite imagery of Satellite imagery of Udupi District - Udupi District - 1999 2012 40
  • • Click here to see video (Forest department ) 41
  • FINANCIAL PHYSICAL EXPENDITUR PROGRAMMES ACH. E (LAKH Rs.)AREA EXPANSION OF 425 HA. 64.80HORTICULTURE CROPSREJUVINATION OF CASHEW 20 HA 3.0ASSISTANCE TO VERMICOMPOST 35 NO. 10.50 AND BIODIGESTER UNITSINTEGRATED NUTRIENT AND 1000 HA 10.00PEST MANAGEMENTASSISTANCE TO BEE 250 NO. 3.75 KEEPING 42
  • Area Expansion of Horticulture Crops  (Banana, Pineapple, Cocoa, Cashew,  YEAR Pepper, Nutmeg and udupi Mallige) Phy. (Ha.) Fin. (Lakh Rs.) 2011-12 400 70.50 2012-13 445 77.50 2013-14 490 84.50 2014-15 535 91.50 2015-16 565 98.0 Total 2435 422.0Fund Flow NHM and MNREGA 43
  • • Action has been taken to increase area of horticulture crops using funds of National Horticulture Mission. Till the end of march 2012 an area of 425 Ha of horticulture crop has been increased utilizing Rs. 64.80 lakhs. And 412 Ha of horticulture crop area is maintained utilizing Rs. 22.27 lakhs• Under MNREGS Rs.16 lakhs have been spent in collaboration with Grama Panchayath for area expansion of Horticulture Crops. 44
  • • Under Promotion of Organic Farming 100 Ha of Horticulture area has been issued IC-3 Certificate in two clusters each 50 Ha in Udupi and Kundapura Taluk. 8 training programs for organic farming promotion are being completed under National Project on Organic Farming Scheme.• Till the end of March 2012 Department assisted 5 Vermi Compost Units and 15 Bio-digester Units using Rs.6 lakhs under National Note = IC-3 Certificate is issued by the organic certifying agency for Horticulture from inorganic to organic cultivation and the area conversion of land Mission. So as to enhance the operateddeclared as organic method of of conversion cultivation is under organic farming after 3 years cultivation period. 45
  • • Action taken to distribute bio control agents like trichoderma and Bio- fertilizers like Phosphate Solubilising Bacteria to farmers in order to reduce the use of chemical fertilizers and pesticides in horticulture crops.• Till the end of March 2012 assistance has been given to promote 250 honey bee colonies under National Horticulture Mission. 46
  • 47
  • Sl. no Activity As on 31-3-20121 Implementation of the 726 Application from Scheduled Scheduled Tribes And Tribes received 492 Tittles are Distributed to eligible claimants. other traditional (Total extent of land given is forest dwellers 651.64 acres )2 PTG(Primitive Tribal Group ) 561 Houses are sanctioned , Program 118 completed and 443 are in ( recognition of forest rights ) progress. act 2006 and rules 20083 Health Improvement for Koragas Rs 15.37 has been utilized out of Rs 30 lakhs. Nutritious food distribution Distributed to 2518 Koraga4 Educational schemes Rs 12.07 families . lakhs have been spent out of Rs 40 lakhs.5 Self employment Program Rs 44.11 lakhs has been spent out of Rs 92 lakhs . ( 97 beneficiaries. ) 48
  • Developmental Programmes Implemented forwelfare of Scheduled Tribes in Udupi District.Muduru Tribal colony 33-Shirooru Tribal Kundapura colony Udupi 49
  • Livelihood security programmeRagihaklu Tribal colony Kundapura 50
  • Infrastructural Facilities Kenjooru Tribal colony Udupi 51
  • Infrastructural Facilities Kukkehalli Tribal colony Udupi 52
  • Haladi and Hosangadi Kundapura-Beneficiaries of SCA 53
  • Assitance forSelf-employment Commercial crop atTraining Karkada Haladi 54