Transocean Ltd. Reports
Third Quarter 2009 Results
Chart #1: Average Contracted Dayrate by Rig Type
                                                  Qtr 4 2009 through Qtr 3 2010 (Unaudited)

                                                                                                     Definitions

                                                                                                           Average    The weighted average contract dayrate for each rig
$500k             High Specification Floaters                                                              Dayrate    type based on current backlog from the company's
                  Midwater Floaters                                                                                   most recent Fleet Status Report as of November 2,
                                                                                                                      2009. Includes firm contracts only.
                  Jackups
$450k
                                                                              458                             High-   The High-Specification Floaters category is a
                                                       433                                            Specification   consolidation of the Ultra-Deepwater Floaters, Other
$400k                           423                                                                       Floaters    High-Specification Floaters and Other Deepwater
        419
                                                                                                                      Floaters as described below.

                                                                                                                      Ultra-Deepwater Floaters have high-pressure mud
$350k                                                                                                                 pumps and a water depth capability of 7,500 feet or
                                                                                     348                              greater.
                 343                                           336
$300k                                  335
                                                                                                                      Other High-Specification Floaters were built in the
                                                                                                                      mid to late 1980s, are capable of drilling in harsh
                                                                                                                      environments and have greater displacement than
$250k                                                                                                                 previously constructed rigs resulting in larger
                                                                                                                      variable load capacity, more useable deck space
                                                                                                                      and better motion characteristics.
$200k
                                                                                                                      The Other Deepwater Floaters include the remaining
                                                                                                                      semi-submersible rigs and drillships that have a
$150k                                            161                                                                  water depth capacity of at least 4,500 feet.
                          155                                           153                    147
                                                                                                          Midwater    The Midwater Floaters category is generally
                                                                                                           Floaters   comprised of those non-High-Specification Floaters
$100k
                                                                                                                      with a water depth capacity of less than 4,500 feet.


 $50k                                                                                                      Jackups    The Jackups category consists of our jackup fleet.
               Qtr 4 09               Qtr 1 10               Qtr 2 10               Qtr 3 10
              (Remaining)
Chart #2: Out-of-Service Rig Months*
                                                                             Qtr 1 2009 through Qtr 4 2010 (Unaudited)

             40                                                                                                                          Definitions
                            14             21            27           21             16            25              15          8              Rig Months    Time expressed in months that each rig has been,
                                                                                                                                                            or is forecast to be Out of Service as reflected in
             35                                                                                                                                             the company's Fleet Status Report as of
                                                                                                                                                            November 2, 2009. Also includes out of service
                                                                                                                                                            time of less than 14 days that is not disclosed in
             30                                                                                                                                             the Fleet Status Report.

                                                        -                                                                                 Out-of-Service    Time when a rig is not available to earn an
             25                                             3                                                                                               operating dayrate due to shipyard, mobilization,
                                                                                                   2                                                        and upgrades.
Rig Months




                                                                                                                                             Mobilization   Includes mobilization and demobilization to and
                                                                     -
             20                           -1                             2                                                                                  from operating contracts and other activities such
                                           2                                                                                                                as shipyards excluding those mobilization and
                                                                                                                                                            demobilization periods covered in Upgrade.
                                                                                    -                                                                       Excludes Newbuild mobilization prior to
             15                                                                                                -                                            commencement of operations.
                                                                                        5                          2
                                3                       24                                                                                        Upgrade   Includes the Sedco 702 and the Sedco 706 which
                            -                                                                     23
                                                                                                                                                            have undergone shipyard projects to enhance the
             10                 3                                     19
                                          18                                                                                                                operational capabilities.
                                                                                                                             -1
                                                                                                                13                               Shipyard   Refers to periods during which a rig is out of
                 5                                                                  11                                                                      service as a result of contract preparation, other
                                8                                                                                              7                            planned shipyards, surveys, repairs, regulatory
                                                                                                                                                            inspections or other planned service or work on
                                                                                                                                                            the rig excluding reactivations and upgrades.
             -
                         Qtr 1 - 09A   Qtr 2 - 09A   Qtr 3 - 09A   Qtr 4 - 09F   Qtr 1 - 10F   Qtr 2 - 10F   Qtr 3 - 10F   Qtr 4 - 10F


                                                     Period (A = actual data, F = forecast data)

                                Shipyard                            Mobilization                               Upgrade


                     * Excludes stacked rigs and mobilization to stacking locations.
Chart #3: Operating & Maintenance (O&M) Costs Trends
                                                                                            (Unaudited)                     Definitions
                                                                                                                                  Drilling -   Includes all shorebase and common support costs such
                                                                                                                             Support Costs     as onshore offices, yards and pool equipment and other
                                                                                                                             & Other Direct    direct costs such as labor pools and newbuild expenses.
       $1,600 MM
                                                                                                                                Non Drilling   Includes Integrated Services, Drilling Management, and
                           $1,364        $1,426           $1,408             $1,171            $1,277        $1,396              Operations    Oil & Gas Services, and non-drilling overhead

       $1,400 MM                          $109                                                                              Operating Rig $    Denotes the total O&M costs of a rig while in service
                                                            $74
                                                                                                                                               based upon the Rig Operating Days (excluding shorebase
                           $176                                                                               $236                             or common support costs), as defined below.
       $1,200 MM                                                                               $165                           Rig Operating    Denotes the total amount of days a rig is deemed to be in-
                                                                              $50
                                                                                                                                      Days     service under contract operations. This excludes all out of
                                                                                                                                               service time relating to shipyards, mobilization and short-
       $1,000 MM                                                                                                                               term out of contract periods but includes the operational
                                                                                                                                               downtime of in service rigs. The average number of days
O&M Costs




                                          $841             $922                                                                                may also fluctuate from quarter to quarter as a result of
                                                                                                                                               rigs being reactivated, sold or stacked in the quarters.
            $800 MM        $787                                                                               $737
                                                                             $801              $795                         Out of Service $   Denotes the total O&M costs while a rig is out of service
                                                                                                                                               based upon Out of Service Days, as defined below. Out of
                                                                                                                                               Service costs are the difference between total operating
            $600 MM
                                                                                                                                               and maintenance costs and the In-Service Costs.

                                                                                                                             Out of Service    Includes the total amount of days a rig is deemed to be
            $400 MM                                                                                                                   Days     out of service. This relates to times when a rig is out of
                                          $213                                                                                                 service due to shipyards, mobilization, short-term idle
                           $181                            $200                                                                                periods and stacked periods.
                                                                                                              $322
            $200 MM                                                          $194              $207
                                                                                                                                O&M Costs      Operating and maintenance costs represent all direct and
                           $220           $263             $212                                                                                indirect costs associated with the operation and
                                                                             $126              $110           $101                             maintenance of our drilling rigs. Operating and
               $-                                                                                                                              maintenance costs also includes all costs related to local
                                                                                                                                               and Unit offices as well as all costs related to operations
                          Qtr2'08        Qtr3'08          Qtr4'08            Qtr1'09           Qtr2'09       Qtr3'09
                                                                    Period                                                                     support, engineering support, marketing and other similar
                                                                                                                                               costs. The principal elements of these costs are direct
                                                                                                                                               and indirect labor and benefits, repair and maintenance,
            Non Drilling Operations $   Drilling-Support Costs & Other Direct $        Operating Rig $   Out of Service $                      contract preparation expenses, insurance, boat and
                                                                                                                                               helicopter rentals, professional and technical fees, freight
                                                                                                                                               costs, communications, customs duties, tool rentals and
                                                                                                                                               services, fuel and water, general taxes and licenses.
                                                                                                                                               Labor, repair and maintenance costs, insurance
                                                                                                                                               premiums, personal injury losses and drilling rig casualty
                                                                                                                                               losses represent the most significant components of our
                                                                                                                                               operating and maintenance costs
Chart #4: Contract Backlog by Client Rating(1)
                                                          (Unaudited)
                                            Total Contract Backlog (2) = $32.2 Billion

                                                                                     Other (3) – 4%




      A Rated – 61%

                                                                                                                 Other Investment Grade – 35%




                                                    A Rated       Other Investment Grade         Other

(1)   Credit ratings represent the rating of client parent companies; however, our contracts may or may not be with the parent company.
(2)   Calculated by multiplying the contracted operating dayrate by the firm contract period from November 2, 2009 forward. Reflects firm commitments
      represented by signed contracts. Contract backlog excludes revenues from mobilization, demobilization, contract preparation, integrated services and
      customer reimbursables. Our backlog calculation assumes that we receive the full contractual dayrate, which could be higher than the actual Dayrate
      that we receive because of a number of factors (rig downtime, suspension of operations, etc.) including some beyond our control.
(3)   Other includes non-investment grade and unrated companies
Chart #5: Free Cash Flow Backlog and Debt Maturities
                                                           (Unaudited)
                                          Total Free Cash Flow Backlog (1) = $17.2 Billion
  (US$ Billions)
      5.0                                                                                        Total Free Cash Flow Backlog           $17.2 B
                                                                                                                          (2)
                                         4.4                                                     Total Face Value of Debt               $12.4 B
                                                              4.1                                Difference                              $4.8 B
      4.0

                                                                                  3.2
      3.0
                                                        2.5                                           2.4                  2.5           2.5
                                                                            2.3
                                   1.9                                                                               1.9
      2.0



                                                                                                0.9
      1.0
                     0.6
               0.4

      0.0
                 2009                2010                 2011                2012                 2013             2014-2019           2020-2038
              Remaining
                                               Scheduled Debt Maturities          Free Cash Flow Backlog
(1)    Defined as Revenue Backlog, plus Firm Mobilization Revenue for contracts not started, less the following: Operating Expenditures, Overhead costs
       (except General & Administrative), Firm Mobilization costs, Cash Taxes, Firm Sustaining Capital Expenditures, all newbuild Capital Expenditures and
       upgrade Capital Expenditures based on current backlog from the company's Fleet Status Report as of November 2, 2009.

(2)    Total Face Value of Debt as of September 30, 2009

More Related Content

Featured

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 

Featured (20)

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 

T Os O&M Cost Trends

  • 1. Transocean Ltd. Reports Third Quarter 2009 Results
  • 2. Chart #1: Average Contracted Dayrate by Rig Type Qtr 4 2009 through Qtr 3 2010 (Unaudited) Definitions Average The weighted average contract dayrate for each rig $500k High Specification Floaters Dayrate type based on current backlog from the company's Midwater Floaters most recent Fleet Status Report as of November 2, 2009. Includes firm contracts only. Jackups $450k 458 High- The High-Specification Floaters category is a 433 Specification consolidation of the Ultra-Deepwater Floaters, Other $400k 423 Floaters High-Specification Floaters and Other Deepwater 419 Floaters as described below. Ultra-Deepwater Floaters have high-pressure mud $350k pumps and a water depth capability of 7,500 feet or 348 greater. 343 336 $300k 335 Other High-Specification Floaters were built in the mid to late 1980s, are capable of drilling in harsh environments and have greater displacement than $250k previously constructed rigs resulting in larger variable load capacity, more useable deck space and better motion characteristics. $200k The Other Deepwater Floaters include the remaining semi-submersible rigs and drillships that have a $150k 161 water depth capacity of at least 4,500 feet. 155 153 147 Midwater The Midwater Floaters category is generally Floaters comprised of those non-High-Specification Floaters $100k with a water depth capacity of less than 4,500 feet. $50k Jackups The Jackups category consists of our jackup fleet. Qtr 4 09 Qtr 1 10 Qtr 2 10 Qtr 3 10 (Remaining)
  • 3. Chart #2: Out-of-Service Rig Months* Qtr 1 2009 through Qtr 4 2010 (Unaudited) 40 Definitions 14 21 27 21 16 25 15 8 Rig Months Time expressed in months that each rig has been, or is forecast to be Out of Service as reflected in 35 the company's Fleet Status Report as of November 2, 2009. Also includes out of service time of less than 14 days that is not disclosed in 30 the Fleet Status Report. - Out-of-Service Time when a rig is not available to earn an 25 3 operating dayrate due to shipyard, mobilization, 2 and upgrades. Rig Months Mobilization Includes mobilization and demobilization to and - 20 -1 2 from operating contracts and other activities such 2 as shipyards excluding those mobilization and demobilization periods covered in Upgrade. - Excludes Newbuild mobilization prior to 15 - commencement of operations. 5 2 3 24 Upgrade Includes the Sedco 702 and the Sedco 706 which - 23 have undergone shipyard projects to enhance the 10 3 19 18 operational capabilities. -1 13 Shipyard Refers to periods during which a rig is out of 5 11 service as a result of contract preparation, other 8 7 planned shipyards, surveys, repairs, regulatory inspections or other planned service or work on the rig excluding reactivations and upgrades. - Qtr 1 - 09A Qtr 2 - 09A Qtr 3 - 09A Qtr 4 - 09F Qtr 1 - 10F Qtr 2 - 10F Qtr 3 - 10F Qtr 4 - 10F Period (A = actual data, F = forecast data) Shipyard Mobilization Upgrade * Excludes stacked rigs and mobilization to stacking locations.
  • 4. Chart #3: Operating & Maintenance (O&M) Costs Trends (Unaudited) Definitions Drilling - Includes all shorebase and common support costs such Support Costs as onshore offices, yards and pool equipment and other & Other Direct direct costs such as labor pools and newbuild expenses. $1,600 MM Non Drilling Includes Integrated Services, Drilling Management, and $1,364 $1,426 $1,408 $1,171 $1,277 $1,396 Operations Oil & Gas Services, and non-drilling overhead $1,400 MM $109 Operating Rig $ Denotes the total O&M costs of a rig while in service $74 based upon the Rig Operating Days (excluding shorebase $176 $236 or common support costs), as defined below. $1,200 MM $165 Rig Operating Denotes the total amount of days a rig is deemed to be in- $50 Days service under contract operations. This excludes all out of service time relating to shipyards, mobilization and short- $1,000 MM term out of contract periods but includes the operational downtime of in service rigs. The average number of days O&M Costs $841 $922 may also fluctuate from quarter to quarter as a result of rigs being reactivated, sold or stacked in the quarters. $800 MM $787 $737 $801 $795 Out of Service $ Denotes the total O&M costs while a rig is out of service based upon Out of Service Days, as defined below. Out of Service costs are the difference between total operating $600 MM and maintenance costs and the In-Service Costs. Out of Service Includes the total amount of days a rig is deemed to be $400 MM Days out of service. This relates to times when a rig is out of $213 service due to shipyards, mobilization, short-term idle $181 $200 periods and stacked periods. $322 $200 MM $194 $207 O&M Costs Operating and maintenance costs represent all direct and $220 $263 $212 indirect costs associated with the operation and $126 $110 $101 maintenance of our drilling rigs. Operating and $- maintenance costs also includes all costs related to local and Unit offices as well as all costs related to operations Qtr2'08 Qtr3'08 Qtr4'08 Qtr1'09 Qtr2'09 Qtr3'09 Period support, engineering support, marketing and other similar costs. The principal elements of these costs are direct and indirect labor and benefits, repair and maintenance, Non Drilling Operations $ Drilling-Support Costs & Other Direct $ Operating Rig $ Out of Service $ contract preparation expenses, insurance, boat and helicopter rentals, professional and technical fees, freight costs, communications, customs duties, tool rentals and services, fuel and water, general taxes and licenses. Labor, repair and maintenance costs, insurance premiums, personal injury losses and drilling rig casualty losses represent the most significant components of our operating and maintenance costs
  • 5. Chart #4: Contract Backlog by Client Rating(1) (Unaudited) Total Contract Backlog (2) = $32.2 Billion Other (3) – 4% A Rated – 61% Other Investment Grade – 35% A Rated Other Investment Grade Other (1) Credit ratings represent the rating of client parent companies; however, our contracts may or may not be with the parent company. (2) Calculated by multiplying the contracted operating dayrate by the firm contract period from November 2, 2009 forward. Reflects firm commitments represented by signed contracts. Contract backlog excludes revenues from mobilization, demobilization, contract preparation, integrated services and customer reimbursables. Our backlog calculation assumes that we receive the full contractual dayrate, which could be higher than the actual Dayrate that we receive because of a number of factors (rig downtime, suspension of operations, etc.) including some beyond our control. (3) Other includes non-investment grade and unrated companies
  • 6. Chart #5: Free Cash Flow Backlog and Debt Maturities (Unaudited) Total Free Cash Flow Backlog (1) = $17.2 Billion (US$ Billions) 5.0 Total Free Cash Flow Backlog $17.2 B (2) 4.4 Total Face Value of Debt $12.4 B 4.1 Difference $4.8 B 4.0 3.2 3.0 2.5 2.4 2.5 2.5 2.3 1.9 1.9 2.0 0.9 1.0 0.6 0.4 0.0 2009 2010 2011 2012 2013 2014-2019 2020-2038 Remaining Scheduled Debt Maturities Free Cash Flow Backlog (1) Defined as Revenue Backlog, plus Firm Mobilization Revenue for contracts not started, less the following: Operating Expenditures, Overhead costs (except General & Administrative), Firm Mobilization costs, Cash Taxes, Firm Sustaining Capital Expenditures, all newbuild Capital Expenditures and upgrade Capital Expenditures based on current backlog from the company's Fleet Status Report as of November 2, 2009. (2) Total Face Value of Debt as of September 30, 2009