Garden PondHOW TO CONSTRUCT A SIMPLE GARDEN POND
Tools
Spade or shovel
Concrete mixer, or wheel barrow for smaller ponds
Garden hose with spray nozzle
Bucket and hose water level or carpenters level
Materials
500 gauge polythene sheet (enough to line your size pond and extend at least 150mm
beyond the perimeter of the pond comfortably).
Fine builders mix and cement (a pond of 5 square metres will need .3 cubic metres of builders
mix and one and a half 40kg bags of cement).
An array of flat stones (enough to go neatly around the edge of the pond).
A can of spray paint for marking pond perimeter.
Instructions
1 Mark out your desired shape of the pond with a can of spray paint.
A Helpful Note from Ted about Extreme Conditions
For those of us in the Great White North [Canada], where temperatures vary greatly, the
pond - especially if being used for fish and plants should be at a depth of 900mm with a
shelf area for some species of plants at approximately 300mm from the top. Although in
Canada, this will not stop the pond from becoming a large ice cube, it will prevent broiled
fish in the summer from excessive heat. Again, in northern climes, one would have to add
wire mesh to keep the pond together. A far better solution would be to use the heavy
rubberised liners that are available for fish ponds, eliminating the need for cement. As for
the pump - if you are adding one for aeration or a decorative waterfall, that will do the trick.
Ted L Stratford, PE
AnotherNote:
In some places, pools deeper than 400mm need to be fenced and need a permit. Check
with your local Authority.
2 Check the ground height along your marked line about every 600mm. You want these
points level with each other. You can do this by using our bucket and hose water level
method. For instructions on how to make and use a bucket and hose water level see next
pages.
Using a spade level out the marked line, following around the perimeter of the pond. Dig
about 200mm wide and 50mm below existing ground level at the lowest point.
This is now the shelf around the perimeter of the pond and is where the flat stones will be
placed once the concrete has been poured.
3 Dig the pond out from the pond shelf, sloping gradually down to the centre (saucer shaped)
to a maximum depth of 400mm. If the pond has the capability of a water depth greater than
400mm (16 inches) then it is required to be fenced in accordance with the Fencing of
Swimming Pools Act 1987. (New Zealand)
Lay the polythene on the bottom of the pond and up over the pond shelf leaving at least
150mm spill past the pond edge.
4 Lay the flat stones temporarily around the shelf of the pond to ensure they fit in place and
that you have enough. Remove them out of the way about 300 - 400mm from the shelf edge,
until the concrete is poured.
5 CONCRETE In a concrete mixer, (or wheel barrow for small pond) mix four parts fine
builders mix, to one part of cement. Pour enough clean water to the mix, to make a fairly stiff
mixture. If the mixture is too dry add more water. If the mixture it too wet, add more builders
mix and cement to the same ratio as above.
Spread the concrete over the entire polythene liner starting at the bottom of the pond, and
finishing up at the pond shelf. The concrete should be at least 50mm thick. Use a block of
wood for a trowel, as the edges on a conventional trowel are too sharp and likely to pierce the
polythene liner.
6 Lay the flat stones around the edge of the pond shelf, pushing them slightly into the
concrete.
A large overhanging flat stone, strategically placed, can provide shade for fish, but be sure it
is fixed firmly in place, and capable of taking any weight which might be placed on it later.
7 After a couple of hours (more or less depending on the weather or temperature) the
concrete should be stiff enough to allow the pond to be filled with water.
When filling, place an old sheet, piece of polythene or similar in the pond, so the flow of water
does not scour the concrete.
After filling remove the sheet, and leave the pond to set for about a week. After the week is
up, empty and refill the pond three or four times to reduce alkaline level.
water levelHOW TO MAKE AND USE A BUCKET AND HOSE WATER LEVEL
Material Requirements
You will need a standard plastic bucket and 12 metres of 6 mm nylex clear plastic
tube. (Both items can be purchased from any major building suppliers, and should
cost under $20).
Instructions
1. Drill a hole in the bucket 50mm up from the bottom. The hole size should be
slightly smaller than the plastic tube.
2. Slice one end of the plastic tube about 50mm down. Fig 1 This enables the tube
to be threaded into the slightly smaller hole in the bucket. Fig 2
3. Pull the tube from the inside of the bucket until tight. Fig 3
How to use
a bucket and hose water-level
Place the bucket on a saw stool or chair and fill to the top with water.
The height of the bucket does not matter.
Let the hose loose on the ground until water is running out freely and all the air
bubbles have come through.
Method 1
This method is good for profiles, high decks, high retaining walls, etc.
Pick up the end of the hose and hold it against Post (A). Fig 4
Mark the post where the water line shows in the hose.
This becomes the datum line (not the known required height).
Mark the datum height on the house, post (B), and post (C) in the same way.
You now have a level datum line on all four objects, but you want to trim the top of
the posts to the same height as the known required height on the house. Shown in
Fig 4
You do not need the water level any more.
Simply measure up from the datum height marked on the house to the known
required height, also marked on the house. Transfer this measurement to posts (A),
(B) and (C), measuring up from the datum height marked on each post.
You now have a level line from the known required height on the house, through to
post (A), (B) and (C).
Method 2
This method is good for low profiles, low decks, low retaining walls, for finding level
heights for ponds and pools, ground contours, etc.
Pick up the end of the hose and hold in against a piece of rod held upright on area
(A). Fig 5
Mark a pencil line on the rod where the water line shows in the hose.
Walk down the hill and do the same over area (B).
You will now have two pencil marks on the rod. Whatever the distance measures
between the two marks, is also the distance area (A) will need to be dug down to be
level with area (B).

More Related Content

What's hot

How to prevent pitfalls when buying epoxy flooring
How to prevent pitfalls when buying epoxy flooringHow to prevent pitfalls when buying epoxy flooring
How to prevent pitfalls when buying epoxy flooringDavid Ryan
 
Stone Works Canada Alan Block garden walls install catalog
Stone Works Canada Alan Block garden walls install catalogStone Works Canada Alan Block garden walls install catalog
Stone Works Canada Alan Block garden walls install catalogStone Works Canada
 

What's hot (6)

How to prevent pitfalls when buying epoxy flooring
How to prevent pitfalls when buying epoxy flooringHow to prevent pitfalls when buying epoxy flooring
How to prevent pitfalls when buying epoxy flooring
 
Wicking Bed Recipe for Drought Gardening
Wicking Bed Recipe for Drought Gardening Wicking Bed Recipe for Drought Gardening
Wicking Bed Recipe for Drought Gardening
 
Design Considerations for Large Format Tile
Design Considerations for Large Format TileDesign Considerations for Large Format Tile
Design Considerations for Large Format Tile
 
Daniel Whatley, APLD Portfolio
Daniel Whatley, APLD PortfolioDaniel Whatley, APLD Portfolio
Daniel Whatley, APLD Portfolio
 
Stone Works Canada Alan Block garden walls install catalog
Stone Works Canada Alan Block garden walls install catalogStone Works Canada Alan Block garden walls install catalog
Stone Works Canada Alan Block garden walls install catalog
 
cereamic
cereamiccereamic
cereamic
 

Viewers also liked

Maemo test document
Maemo test document Maemo test document
Maemo test document maninc
 
Resum tema 8 i tema 12
Resum tema 8 i tema 12Resum tema 8 i tema 12
Resum tema 8 i tema 12Carles
 
IMR Conference 2014 - Agenda
IMR Conference 2014 - AgendaIMR Conference 2014 - Agenda
IMR Conference 2014 - AgendaEFOS Management
 
Most Funny Images
Most Funny ImagesMost Funny Images
Most Funny ImagesFunny Life
 
Aero def 2017 high speed dry finishing of rotating hardware
Aero def 2017 high speed dry finishing of rotating hardwareAero def 2017 high speed dry finishing of rotating hardware
Aero def 2017 high speed dry finishing of rotating hardwareDave Davidson
 
Miss america 2017 winner savvy shields: Funny Life Pictures
Miss america 2017 winner savvy shields: Funny Life PicturesMiss america 2017 winner savvy shields: Funny Life Pictures
Miss america 2017 winner savvy shields: Funny Life PicturesFunny Life
 
Turbo-Finish Technical Bulletin
Turbo-Finish Technical BulletinTurbo-Finish Technical Bulletin
Turbo-Finish Technical BulletinDave Davidson
 
Justin bieber
Justin bieberJustin bieber
Justin bieberhjvdavies
 
Turbo finish dec 2016
Turbo finish dec 2016Turbo finish dec 2016
Turbo finish dec 2016Dave Davidson
 
Turbo abrasive machining tech paper - 2016
Turbo abrasive machining tech paper - 2016Turbo abrasive machining tech paper - 2016
Turbo abrasive machining tech paper - 2016Dave Davidson
 
Resum Tema 6 i 7
Resum Tema 6 i 7Resum Tema 6 i 7
Resum Tema 6 i 7Carles
 
Improved Part performance from Surface Condition
Improved Part performance from Surface ConditionImproved Part performance from Surface Condition
Improved Part performance from Surface ConditionDave Davidson
 

Viewers also liked (13)

Maemo test document
Maemo test document Maemo test document
Maemo test document
 
Resum tema 8 i tema 12
Resum tema 8 i tema 12Resum tema 8 i tema 12
Resum tema 8 i tema 12
 
IMR Conference 2014 - Agenda
IMR Conference 2014 - AgendaIMR Conference 2014 - Agenda
IMR Conference 2014 - Agenda
 
Most Funny Images
Most Funny ImagesMost Funny Images
Most Funny Images
 
Aero def 2017 high speed dry finishing of rotating hardware
Aero def 2017 high speed dry finishing of rotating hardwareAero def 2017 high speed dry finishing of rotating hardware
Aero def 2017 high speed dry finishing of rotating hardware
 
Miss america 2017 winner savvy shields: Funny Life Pictures
Miss america 2017 winner savvy shields: Funny Life PicturesMiss america 2017 winner savvy shields: Funny Life Pictures
Miss america 2017 winner savvy shields: Funny Life Pictures
 
Turbo-Finish Technical Bulletin
Turbo-Finish Technical BulletinTurbo-Finish Technical Bulletin
Turbo-Finish Technical Bulletin
 
Justin bieber
Justin bieberJustin bieber
Justin bieber
 
Turbo finish dec 2016
Turbo finish dec 2016Turbo finish dec 2016
Turbo finish dec 2016
 
Turbo abrasive machining tech paper - 2016
Turbo abrasive machining tech paper - 2016Turbo abrasive machining tech paper - 2016
Turbo abrasive machining tech paper - 2016
 
Resum Tema 6 i 7
Resum Tema 6 i 7Resum Tema 6 i 7
Resum Tema 6 i 7
 
Improved Part performance from Surface Condition
Improved Part performance from Surface ConditionImproved Part performance from Surface Condition
Improved Part performance from Surface Condition
 
Blockchain_OS
Blockchain_OSBlockchain_OS
Blockchain_OS
 

Similar to How to construct a suimple garden pond

Similar to How to construct a suimple garden pond (20)

In ground pool
In ground poolIn ground pool
In ground pool
 
Build a shower cubicle
Build a shower cubicleBuild a shower cubicle
Build a shower cubicle
 
Infiltration and Flow Through Planters for Droughts
Infiltration and Flow Through Planters for DroughtsInfiltration and Flow Through Planters for Droughts
Infiltration and Flow Through Planters for Droughts
 
Spring Box_compressed
Spring Box_compressedSpring Box_compressed
Spring Box_compressed
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
Building materials
Building materialsBuilding materials
Building materials
 
Laying a brick walkway or patio
Laying a brick walkway or patioLaying a brick walkway or patio
Laying a brick walkway or patio
 
Design notes
Design notesDesign notes
Design notes
 
Backyard pond
Backyard pondBackyard pond
Backyard pond
 
Backyard pond
Backyard pondBackyard pond
Backyard pond
 
Laying, jointing and testing of pipes
Laying, jointing and testing of pipesLaying, jointing and testing of pipes
Laying, jointing and testing of pipes
 
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
 
NRCS Pond Construction
NRCS Pond ConstructionNRCS Pond Construction
NRCS Pond Construction
 
Types of pile according to their composition
Types of pile according to their compositionTypes of pile according to their composition
Types of pile according to their composition
 
Aquarium
AquariumAquarium
Aquarium
 
Compost toilet manual
Compost toilet manualCompost toilet manual
Compost toilet manual
 
How to Make a Lavamanos-RoundBASE
How to Make a Lavamanos-RoundBASEHow to Make a Lavamanos-RoundBASE
How to Make a Lavamanos-RoundBASE
 
Fit a bath and wash basin
Fit a bath and wash basinFit a bath and wash basin
Fit a bath and wash basin
 
Wicking Beds for Drought Gardening
Wicking Beds for Drought GardeningWicking Beds for Drought Gardening
Wicking Beds for Drought Gardening
 
The Plastic Still
The Plastic StillThe Plastic Still
The Plastic Still
 

More from Zulaiha Amaria

More from Zulaiha Amaria (20)

Application of disciplinary system
Application of disciplinary systemApplication of disciplinary system
Application of disciplinary system
 
girl culture dictionary
girl culture dictionarygirl culture dictionary
girl culture dictionary
 
Wiring a ring main
Wiring a ring mainWiring a ring main
Wiring a ring main
 
Waterproof your roof
Waterproof your roofWaterproof your roof
Waterproof your roof
 
Wallpapering techniques
Wallpapering techniquesWallpapering techniques
Wallpapering techniques
 
Wallpaper stripping
Wallpaper strippingWallpaper stripping
Wallpaper stripping
 
Wallpaper a ceiling
Wallpaper a ceilingWallpaper a ceiling
Wallpaper a ceiling
 
Wall tiling
Wall tilingWall tiling
Wall tiling
 
Wainscotting
WainscottingWainscotting
Wainscotting
 
Upvc fascia
Upvc fasciaUpvc fascia
Upvc fascia
 
Tow dolly plans
Tow dolly plansTow dolly plans
Tow dolly plans
 
Timber decking
Timber deckingTimber decking
Timber decking
 
Timber cutting hand saws
Timber cutting hand sawsTimber cutting hand saws
Timber cutting hand saws
 
Size conversion charts
Size conversion chartsSize conversion charts
Size conversion charts
 
Shelving and storage
Shelving and storageShelving and storage
Shelving and storage
 
Safe diy
Safe diySafe diy
Safe diy
 
Replacing a brick
Replacing a brickReplacing a brick
Replacing a brick
 
Replace broken tiles
Replace broken tilesReplace broken tiles
Replace broken tiles
 
Repairing a dripping tap
Repairing a dripping tapRepairing a dripping tap
Repairing a dripping tap
 
Renovating wood
Renovating woodRenovating wood
Renovating wood
 

How to construct a suimple garden pond

  • 1. Garden PondHOW TO CONSTRUCT A SIMPLE GARDEN POND Tools Spade or shovel Concrete mixer, or wheel barrow for smaller ponds Garden hose with spray nozzle Bucket and hose water level or carpenters level Materials 500 gauge polythene sheet (enough to line your size pond and extend at least 150mm beyond the perimeter of the pond comfortably). Fine builders mix and cement (a pond of 5 square metres will need .3 cubic metres of builders mix and one and a half 40kg bags of cement). An array of flat stones (enough to go neatly around the edge of the pond). A can of spray paint for marking pond perimeter. Instructions 1 Mark out your desired shape of the pond with a can of spray paint. A Helpful Note from Ted about Extreme Conditions For those of us in the Great White North [Canada], where temperatures vary greatly, the pond - especially if being used for fish and plants should be at a depth of 900mm with a shelf area for some species of plants at approximately 300mm from the top. Although in Canada, this will not stop the pond from becoming a large ice cube, it will prevent broiled fish in the summer from excessive heat. Again, in northern climes, one would have to add wire mesh to keep the pond together. A far better solution would be to use the heavy rubberised liners that are available for fish ponds, eliminating the need for cement. As for the pump - if you are adding one for aeration or a decorative waterfall, that will do the trick. Ted L Stratford, PE AnotherNote:
  • 2. In some places, pools deeper than 400mm need to be fenced and need a permit. Check with your local Authority. 2 Check the ground height along your marked line about every 600mm. You want these points level with each other. You can do this by using our bucket and hose water level method. For instructions on how to make and use a bucket and hose water level see next pages. Using a spade level out the marked line, following around the perimeter of the pond. Dig about 200mm wide and 50mm below existing ground level at the lowest point. This is now the shelf around the perimeter of the pond and is where the flat stones will be placed once the concrete has been poured. 3 Dig the pond out from the pond shelf, sloping gradually down to the centre (saucer shaped) to a maximum depth of 400mm. If the pond has the capability of a water depth greater than 400mm (16 inches) then it is required to be fenced in accordance with the Fencing of Swimming Pools Act 1987. (New Zealand) Lay the polythene on the bottom of the pond and up over the pond shelf leaving at least 150mm spill past the pond edge. 4 Lay the flat stones temporarily around the shelf of the pond to ensure they fit in place and that you have enough. Remove them out of the way about 300 - 400mm from the shelf edge, until the concrete is poured. 5 CONCRETE In a concrete mixer, (or wheel barrow for small pond) mix four parts fine builders mix, to one part of cement. Pour enough clean water to the mix, to make a fairly stiff mixture. If the mixture is too dry add more water. If the mixture it too wet, add more builders mix and cement to the same ratio as above. Spread the concrete over the entire polythene liner starting at the bottom of the pond, and finishing up at the pond shelf. The concrete should be at least 50mm thick. Use a block of wood for a trowel, as the edges on a conventional trowel are too sharp and likely to pierce the polythene liner. 6 Lay the flat stones around the edge of the pond shelf, pushing them slightly into the concrete.
  • 3. A large overhanging flat stone, strategically placed, can provide shade for fish, but be sure it is fixed firmly in place, and capable of taking any weight which might be placed on it later. 7 After a couple of hours (more or less depending on the weather or temperature) the concrete should be stiff enough to allow the pond to be filled with water. When filling, place an old sheet, piece of polythene or similar in the pond, so the flow of water does not scour the concrete. After filling remove the sheet, and leave the pond to set for about a week. After the week is up, empty and refill the pond three or four times to reduce alkaline level. water levelHOW TO MAKE AND USE A BUCKET AND HOSE WATER LEVEL Material Requirements You will need a standard plastic bucket and 12 metres of 6 mm nylex clear plastic tube. (Both items can be purchased from any major building suppliers, and should cost under $20). Instructions 1. Drill a hole in the bucket 50mm up from the bottom. The hole size should be slightly smaller than the plastic tube. 2. Slice one end of the plastic tube about 50mm down. Fig 1 This enables the tube to be threaded into the slightly smaller hole in the bucket. Fig 2 3. Pull the tube from the inside of the bucket until tight. Fig 3
  • 4. How to use a bucket and hose water-level Place the bucket on a saw stool or chair and fill to the top with water. The height of the bucket does not matter. Let the hose loose on the ground until water is running out freely and all the air bubbles have come through. Method 1 This method is good for profiles, high decks, high retaining walls, etc. Pick up the end of the hose and hold it against Post (A). Fig 4 Mark the post where the water line shows in the hose. This becomes the datum line (not the known required height). Mark the datum height on the house, post (B), and post (C) in the same way. You now have a level datum line on all four objects, but you want to trim the top of the posts to the same height as the known required height on the house. Shown in Fig 4 You do not need the water level any more. Simply measure up from the datum height marked on the house to the known required height, also marked on the house. Transfer this measurement to posts (A), (B) and (C), measuring up from the datum height marked on each post. You now have a level line from the known required height on the house, through to post (A), (B) and (C). Method 2 This method is good for low profiles, low decks, low retaining walls, for finding level heights for ponds and pools, ground contours, etc.
  • 5. Pick up the end of the hose and hold in against a piece of rod held upright on area (A). Fig 5 Mark a pencil line on the rod where the water line shows in the hose. Walk down the hill and do the same over area (B). You will now have two pencil marks on the rod. Whatever the distance measures between the two marks, is also the distance area (A) will need to be dug down to be level with area (B).