Brownfield regeneration- breaking down the barriers

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
985
On SlideShare
0
From Embeds
0
Number of Embeds
16
Actions
Shares
0
Downloads
17
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Ecoforum 2011 Dave Johnson Brownfield Regeneration In Nsw

  1. 1. Brownfield Regeneration Breaking down the barriers Liabilities to assets Dave Johnson Principal Environmental Engineer RCA AUSTRALIA
  2. 2. <ul><li>Where are we now </li></ul><ul><li>Where have others got to </li></ul><ul><li>Where could we be going </li></ul><ul><li>Key brownfield sites </li></ul><ul><li>Conclusion </li></ul>Presentation topics
  3. 3. <ul><li>Brownfield sites – what are they ? </li></ul><ul><li>Wikepedia ; “ are abandoned or underused industrial and commercial facilities available for re-use . Expansion or redevelopment of such a facility may be complicated by real or perceived environmental contamination . </li></ul><ul><li>In the United Kingdom and Australia , brownfield applies more generally to previously used land. </li></ul><ul><li>Often otherwise called or associated with in Australia; Urban consolidation/renewal,/regeneration, infill development </li></ul><ul><li>Part of the ongoing solution to “Urban Sprawl” greenfield development, key to sustainable cities ? </li></ul>Introduction
  4. 4. <ul><li>4 key Sydney areas – Green Square, Newington Olympic Village, Pyrmont, Rhodes Peninsula </li></ul><ul><li>Waterside redevelopments </li></ul><ul><li>Newcastle – Waterside Honeysuckle, Pasminco Smelter </li></ul><ul><li>Regional plans rezoning, rather than councils </li></ul><ul><li>Urban development plans – master plans </li></ul><ul><li>Council sometimes resisting higher density </li></ul><ul><li>Landcom – HDC, SSDC, CWDC – buy/amalgamate land in inner city industrial areas </li></ul><ul><li>Up to 70% by 2031 in 2005 Syd Met Strat to be non-greenfield </li></ul>Background
  5. 5. Background <ul><li>Lower Hunter shortfall of 3000 houses </li></ul><ul><li>Some developers increasing brownfield developments e.g as result of S Met Strat 70% urban renewal targets </li></ul>
  6. 7. <ul><li>SuRF Australia – momentum for sustainable remediation </li></ul><ul><li>Recent new SEPP (Urban Renewal) – Newcastle , Redfern- Waterloo, Granville </li></ul><ul><li>Syd Met Plan 2036 – Urban renewal corridors and centres (rail focus) </li></ul><ul><li>Property Council 2009 Urban Renewal Lifeline -10 Point action plan </li></ul><ul><li>SEPP 32 Urban Consolidation (Redevelopment of Urban Land) </li></ul><ul><li>Clean Up 09 – ARIC Summit - Unlocking the productive potential of brownfield sites </li></ul>Where are we now ?
  7. 8. <ul><li>Large sites “low hanging fruit” to date, other major sites to be identified and transit orientated to be kick started </li></ul><ul><li>Mature framework for ongoing/increasing brownfields redevelopment – robust assessment of contamination and remediation industry </li></ul><ul><li>Position statements; </li></ul><ul><ul><ul><li>Housing Industry Association 2007 </li></ul></ul></ul><ul><ul><ul><li>Property Council – 2009 Urban Renewal Lifeline </li></ul></ul></ul><ul><ul><ul><li>National Housing Supply Council 2010 state of supply report </li></ul></ul></ul><ul><ul><ul><li>MDP 2010 and National Urban Policy 2011 </li></ul></ul></ul>Where are we now ?
  8. 9. Where are we now ?
  9. 10. <ul><li>R+D Investment – nobody knows about, rarely used, more restricted </li></ul><ul><li>Most developers no brownfield policy </li></ul><ul><li>Lack of national, state, development/ construction industry guidance/framework </li></ul><ul><li>Future liability concerns </li></ul><ul><li>Slow planning determinations </li></ul><ul><li>Perceptions of high remediation costs </li></ul><ul><li>Some developers slowly increasing brownfield developments e.g as result of Syd Met Strat 70% urban renewal targets </li></ul>What is stopping us with more?
  10. 11. <ul><li>Sydney needs planning process that facilitates urban renewal, become more sustainable, and deliver better urban environments for new and existing communities </li></ul>What is stopping us with more?
  11. 13. <ul><li>US </li></ul><ul><ul><li>Risk based site specific assessment </li></ul></ul><ul><ul><li>Sustainable remediation </li></ul></ul><ul><ul><li>Mature in-situ/on site remediation market </li></ul></ul><ul><ul><li>EPA Brownfields Program and grants </li></ul></ul><ul><ul><li>Tax Incentives </li></ul></ul><ul><li>UK </li></ul><ul><ul><li>As above </li></ul></ul><ul><ul><li>Mature in-situ/on site remediation market </li></ul></ul><ul><ul><li>National brownfields survey/database and strategy </li></ul></ul><ul><ul><li>Guidance - CIRIA C578 2002 guide , BURA Guide </li></ul></ul><ul><ul><li>Tax Incentives - 150% relief on land remediation expenditure </li></ul></ul><ul><ul><li>Brownfield Land Action Plans, Local Partnerships, Pilot Projects </li></ul></ul>Where have others got to ?
  12. 14. <ul><li>Holland/Germany </li></ul><ul><ul><li>Risk based site specific assessment </li></ul></ul><ul><ul><li>Sustainable remediation </li></ul></ul><ul><ul><li>Mature in-situ/on site remediation market </li></ul></ul><ul><li>Hong Kong </li></ul><ul><ul><li>Increasingly active approach to brownfields planning addressing risk and leverage land value for new infrastructure </li></ul></ul><ul><ul><li>Increased to coastal/waterfront development </li></ul></ul>Where have others got to ?
  13. 17. Where could we be going? <ul><li>No development levies on urban renewal/brownfield sites </li></ul><ul><li>DECCW more involvement and public/private partnerships </li></ul><ul><li>Towards a City Strategy –Council of Capital City Lord Mayors – good lead </li></ul><ul><li>Increased and earlier community consultation </li></ul><ul><li>NEPM – need for remediation and site management </li></ul><ul><li>Legislation to allow Government amalgamation of sites in defined urban renewal precincts predevelopment – site amalgamation/compulsory acquisition tool </li></ul>
  14. 18. <ul><li>Expand Environment Trust grants program (e.g current gasworks) for brownfields </li></ul><ul><li>DOP / Council targets - Like Syd Met Strat 2036 where 60-70% as urban renewal -policy and legislation to drive this. </li></ul><ul><li>Quicker DA determination on rezoning applications for brownfield sites </li></ul><ul><li>Industry guidance – UDIA, Property Council, ACLCA, ALGA </li></ul><ul><li>More co-ordination and expedite development through state - Landcom ? Dev Corps </li></ul><ul><li>Major Cities Group – like 1990’s BBC ($100M honeysuckle) </li></ul><ul><li>Increasing awareness of sustainable on-site remediation </li></ul>Where could we be going
  15. 19. Where could we be going? <ul><li>Urban Renewal state environmental policy </li></ul><ul><li>Implement Property Council 10 point plan </li></ul><ul><li>Urban Renewal Commission – control master planning, site amalgamation, infrastructure planning, delivery for key urban areas </li></ul><ul><li>Better Community Consultation ( new NEPM) </li></ul><ul><li>CRC Care ALGA/ACLCA Brownfield Position statements </li></ul><ul><li>ARIC - Draft conceptual framework for decision makers 2011 </li></ul>
  16. 20. Where could we be going? <ul><li>Better Developer engagement, via UDIA and Property Council </li></ul><ul><li>Hunter Urban Development Plan </li></ul><ul><li>Urban Renewal state environmental policy </li></ul><ul><li>Site specific risk assessments/management via NEPM framework –non leaching/volatile/bio-available- capped/contained hardstand residential/commercial increased land value </li></ul>
  17. 22. <ul><li>Real Financial incentives; </li></ul><ul><ul><li>Specific Tax incentives for brownfields – not trying to use another system (R+D) – tax offsets </li></ul></ul><ul><ul><li>Tax relief on long term derelict brownfield sites and remediation expenditure </li></ul></ul><ul><ul><li>Switch perverse landfill tax to tax relief for brownfield sites redevelopment, remediation, and soil treatment hub sites </li></ul></ul><ul><li>Government and Regulator Frameworks – DoP, DIT, DECCW </li></ul><ul><li>Construction industry guidance – via Housing Industry Association, Urban Taskforce </li></ul>Where could we be going?
  18. 23. Where could we be going? <ul><li>Better Community Consultation (new NEPM) </li></ul><ul><li>Potential urban renewal/brownfield sites surveys </li></ul><ul><li>CRC Care ALGA/ACLCA Brownfield Position statements </li></ul><ul><li>Better Developer engagement, via UDIA and Property Council </li></ul>
  19. 25. <ul><li>Clyde Street Hamilton Gasworks –Jemena/AGL </li></ul><ul><li>Previous Steel Street Gasworks- Newcastle – (now retail/commercial) </li></ul><ul><li>Intertrade/BHP Steel site – HDC </li></ul><ul><li>Kooragang landfill areas- HDC (commercial/industrial planned) </li></ul><ul><li>Previous Harbourside Honeysuckle – Cottage Creek </li></ul><ul><li>West Wallsend - HDC </li></ul><ul><li>Wangi Wangi Power Station </li></ul><ul><li>Current Pasminco Cockle Creek Lead Smelter – 200 ha- Boolaroo redevelopment </li></ul>Key Lower Hunter brownfield sites
  20. 26. <ul><li>Waterfront Industrial </li></ul><ul><ul><li>Rhodes Peninsula/Homebush Bay </li></ul></ul><ul><ul><li>Breakfast Point- former gasworks </li></ul></ul><ul><li>Newington Olympic Village </li></ul><ul><li>Green Square/Zetland industrial </li></ul><ul><li>Randwick – surplus government </li></ul><ul><li>Barangaroo </li></ul>Key Sydney brownfield sites

×