Vision                        Release Planning                                                Current Release             ...
Upcoming SlideShare
Loading in...5
×

PO Board #PCV12

1,475

Published on

Example of a Product Owner Board.

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
1,475
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
10
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide
  • \n
  • PO Board #PCV12

    1. 1. Vision Release Planning Current Release Release Backlog Committed Complete DeployedFor <target group> MMF “Do this”Who <has a specifc need> MMF “Basics” Epic Stor yThe <product name> Epic #1.1 .1 #2.2Is A <product category> #1.5 Story int #1.1.7 Stor yThat <key benefit> Spr #1.1.3 Epic entUnlike <primary competitors> Next Release ur r #1.6 Stor yOur Product <additional MMF “Do that” #1.1.5 Story Cadvantages> Epic #1.1.6 READY Epic #2.6 Epic #2.4 Epic Requirement Epic #1.4 MMF “Advanced” Stor y #1.2 #1.1. 4 #1 #1.3 MMF “Do better” Requirement Epic Epic #2 #2.5 Epic #2.1 #2.3 Requirement #3 Next+1 Stories can be moved in this column only when they comply to the definition of ready (presented to the Grooming meeting, sized & accepted) Story Release Definition of Definition of Definition of Ready Done Done Level of Detail / Close to done
    1. A particular slide catching your eye?

      Clipping is a handy way to collect important slides you want to go back to later.

    ×