This Slide Show is brought to You by
     http://highqualityarticles.com/
Data Collection Instruments and StrategySho




Before making any strategic alterations to actions or plans, it is
recomme...
In order to develop an accuratedata c




In order to develop an accurate data collection strategy using
instruments you m...
Compile and determinedwhat data is




Once this list has been compile and you have determined what
data is needed, you ca...
Data Collection May Adjust Speed O




Many project-planning experts recommend a schedule be
established for each phase of...
In other words




In other words, what information can be beneficial to getting the
project moving, and what information ...
Regardless of the data required




Regardless of the data required, there needs to be a data
collection strategy system i...
The main considerations would be




The main considerations would be for which days the information
is collected and wher...
If the project involves how to route traffic




If the project involves how to route traffic during exceptionally
busy ti...
This Slide Show is brought to You by
     http://highqualityarticles.com/
Upcoming SlideShare
Loading in...5
×

Data Collection Instruments and Strategy Should Be First Step In Change

1,591

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,591
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
9
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Data Collection Instruments and Strategy Should Be First Step In Change

  1. 1. This Slide Show is brought to You by http://highqualityarticles.com/
  2. 2. Data Collection Instruments and StrategySho Before making any strategic alterations to actions or plans, it is recommended that all pertinent information and facts are known, which may affect the outcome of the change. You will need to develop a data collection instrument strategy in order to obtain all the information needed to make a fact-based change in any situation.
  3. 3. In order to develop an accuratedata c In order to develop an accurate data collection strategy using instruments you must first determine what information must be known in order to make an informed decision. Once you have that information in hand, you must then determine what information you already have that can be discarded as nonessential as well as what essential information you do not have in hand.
  4. 4. Compile and determinedwhat data is Once this list has been compile and you have determined what data is needed, you can then work on developing a data collection strategy using instruments in order to obtain that information. You can determine if the data can be collected through human or mechanical observation, interviewing, auditing or some other method of data collection, and in what order will most efficiently lead to a quicker finish to the project.
  5. 5. Data Collection May Adjust Speed O Many project-planning experts recommend a schedule be established for each phase of a project and developing a data collection strategy using instruments is no different. By understand the flow of the main project, you can determine in data collection can be made in a particular order to benefit the efficiency of completing the project.
  6. 6. In other words In other words, what information can be beneficial to getting the project moving, and what information will have no influence on the progress and can be completed at a later time.
  7. 7. Regardless of the data required Regardless of the data required, there needs to be a data collection strategy system in place. For example, if the needed information involves foot traffic in a shopping mall for developing a safety plan, data collection would typically be through human observation.
  8. 8. The main considerations would be The main considerations would be for which days the information is collected and where in the vicinity would observers have the best view of a particular area. Perhaps sales data through an audit will help determine the busiest days and times based on historical performance.
  9. 9. If the project involves how to route traffic If the project involves how to route traffic during exceptionally busy times, spending time and money on days that have historically been slow, may be a waste of time and money and this information can be part of your data collection strategy, to utilize instruments for the times when better information can be obtained.
  10. 10. This Slide Show is brought to You by http://highqualityarticles.com/
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×