A crisis communication plan that the company should adopt<br />1<br />A crisis communication plan that the company should ...
Pre-crisis phase<br />Have an updated crisis management plan<br />Have a trained crisis management team<br />Conduct drill...
Crisis phase<br />Make safety the number one priority<br />Use all communication channels<br />3<br />
Post-crisis phase<br />Deliver information  and post updates promptly<br />Reflect and evaluate<br />4<br />
Conclusion<br />5<br />Prepare. React. Reflect.<br />
A crisis communication plan that the company should adopt<br />6<br />Question and answer session<br />
Upcoming SlideShare
Loading in...5
×

A Crisis Communication Plan That The Singapore Flyer Should Adopt

889

Published on

Final presentation for AB 114.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
889
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • The Singapore Flyer is a giant Ferris wheel constructed in 2005–2008. At a height of 165 m, it is the tallest Ferris wheel in the world.The Flyer has previously suffered 4 breakdowns. 2 of which were caused by inclement weather.As such, we need to adopt a CCP in case such a crisis occurs again. My proposal for a CCP would consist of 3 parts. Namely pre-crisis, crisis phase, post-crisis.
  • Abraham Lincoln former president of the united states &quot;If I had eight hours to chop down a tree, I&apos;d spend six sharpening my axe.&quot;Being Prepared. Pre-crisis phase involves ``creating plan``training designated team, and ``conducting drills to test both the plan and e team.This would allow e organisation to better react during a crisis.
  • “SAFETY FIRST” – Ensure the safety of the public , as well as employees. immediate medical attention renderedif necessary.``Use allcommunication channels to alert relevant Authorities. This can be achieved through the use of media (TV, radio) and mass notification systems such as mobile devices.
  • In the post-crisis phase, follow-up communication is required. ``provide updates on the progression of recovery efforts and investigations to stakeholders and public.Every crisis should be seen as a learning experience. The crisis managementefforts needs to be ``evaluated to see what is working and what needs improvement in order to not repeat our mistakes.
  • With regards to my proposal of a crisis communication plan, I leave you with 3 key points…``Prepare for the crisisReact to the crisisReflect aft e crisis
  • Thank you for your consideration in my proposal for the crisis communication plan. Are there any queries pertaining to my proposal which I would be able to clarify?
  • A Crisis Communication Plan That The Singapore Flyer Should Adopt

    1. 1. A crisis communication plan that the company should adopt<br />1<br />A crisis communication plan that the company should adopt<br />
    2. 2. Pre-crisis phase<br />Have an updated crisis management plan<br />Have a trained crisis management team<br />Conduct drills to test the plan and team<br />2<br />
    3. 3. Crisis phase<br />Make safety the number one priority<br />Use all communication channels<br />3<br />
    4. 4. Post-crisis phase<br />Deliver information and post updates promptly<br />Reflect and evaluate<br />4<br />
    5. 5. Conclusion<br />5<br />Prepare. React. Reflect.<br />
    6. 6. A crisis communication plan that the company should adopt<br />6<br />Question and answer session<br />

    ×