Final pla presentation

463 views

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
463
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
10
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • This presentation demonstrates the new capabilities of PowerPoint and it is best viewed in Slide Show. These slides are designed to give you great ideas for the presentations you’ll create in PowerPoint 2010! For more sample templates, click the File tab, and then on the New tab, click Sample Templates.
  • This presentation demonstrates the new capabilities of PowerPoint and it is best viewed in Slide Show. These slides are designed to give you great ideas for the presentations you’ll create in PowerPoint 2010! For more sample templates, click the File tab, and then on the New tab, click Sample Templates.
  • Final pla presentation

    1. 1. INTRODUCTION Power Link Arabian Co. Ltd. is a leading contracting company involved mainly with civil, electrical and instrumentation projects. The company is dedicated to operate with high safety measure and complies with local and international standards. Power Link Arabian Co. Ltd. is determined to provide supreme engineering design, supply, erection, testing and commissioning of substation.
    2. 2. INTRODUCTION Power Link Arabian Co. Ltd. offers services with compliments growing range of integrated services that enable us to take any industrial or public works project from concept through planning, financing, design, construction, operations and maintenance. Every element of the firm is structured to ensure that we can leverage our global resources and know-how to satisfy each client’s particular needs.
    3. 3. VENDOR REGISTRATIONS • SEC V. ID 6235953274 • SAUDI ARAMCO V.ID 10041734 • SABIC VENDOR V.ID 505786 • MARAFIQ • TASNEE V.ID. 101991 • AL ROWAD
    4. 4. SCOP OF ACTIVITIES • Layout of Sub-stations • All associated Civil works • Installation of Cable Ladders and trays • Erection of Gantries • Installation of Power transformers • Installation of Switchgear, Control and Protection system, • Installation of GIS type switchgear and Protection system. • Testing & Commissioning. • Laying of XLPE Power Cables for all voltages 11KV, 33KV, and 132KV. • Cable jointing, Indoor & Outdoor terminations. • HV DC Testing of Cables. • Testing & Commissioning. • Installations of Overhead lines, Conductors and Underground Cables. • Installation of Cables for internal Electrification in trenches, ducts, etc. • Installation of MCB , MCCB protection system • DBS & Panels Main Activities Of The Electrical Contracting Include
    5. 5. SCOP OF ACTIVITIES • Design survey & Profiling • Networking Solutions • Supply, Installation& configuration of CISCO switches • Supply & Installation of patch panels, media converters etc. • Design, Supply & installation of Fibre Optical Cables • Splicing of Fibre optic cables • Connectorization • Power Meter Testing • OTDR testing • Complete Installation of Automation Equipment • Complete Installation of Field devices
    6. 6. Power Link Hierarchy GENERAL MANAGER HR & Admin Dept. Sales & Marketing Dept. Operation Dept Estimation QA/QC Dept. Safety Dept. Civil Dept. Electrical Dept. Project Eng. Planning Eng. Protection Eng. Site Eng. Site Supervisor Technician Helper Project Eng. Planning Eng. Site Eng. Site Supervisor Technician Helper Site Manager Site Eng. Site Supervisor Forman Load man Project Eng. Document Controller Carpenter Steel Fixer Scaffolder Painter Masons Instrumentation Dept
    7. 7. CIVIL CONSTRUCTION A combination of flexibility, quality, special skills and adherence to budgets have ensured a pre-eminent position when clients require a single source contractor with capabilities in project development, management, construction services, installation and commissioning. Power Link Arabian Co. Ltd. is fully capable to perform of handling all kinds of Civil Construction • Earthwork • Roads • Sidewalks • Curbs • Gutters • Industrial Constructions • Commercial Buildings Constructions
    8. 8. Hierarchy for Civil work Planning Engineer Safety Officer Document Control Permit ReceiverBackhoe Project Engineer Project Manager Project Supervisor Foreman Carpenter Steel Fixer Painter Mason Tile Fixer Labor Dump Truck Loader Crane Bobcat Boom Truck Operator & Driver
    9. 9. CLINT: SAUDI ARAMCO (AL-WASEA BULK PLANT) CUSTOMER : GBN (GULF BUSINESS NETWORK) INSTALLATION OF EMISSION MONITORING SYSTEM CIVIL/ ELECTRICAL/ INSTRUMENTATION/ FEBRICATION
    10. 10. CLINT: SEC CUSTOMER : GBN (GULF BUSINESS NETWORK) INSTALLATION OF EMISSION MONITORING SYSTEM CIVIL/ELECTRICAL/ INSTRUMENTATION/ FEBRICATION
    11. 11. PICTURES OF CIVILPICTURES OF CIVIL JOBJOB
    12. 12. CLINT: TASNEE (AL-ROWAD)
    13. 13. Rowad Under Ground Tank
    14. 14. Rowad Under Ground Tank
    15. 15. Rowad Under Ground Tank
    16. 16. Rowad Under Ground Tank
    17. 17. Rowad Under Ground Tank
    18. 18. Rowad Under Ground Tank
    19. 19. CLINT: SABIC (YANBU)
    20. 20. Yansib Yanbu BMS Project
    21. 21. Yansib Yanbu BMS Project
    22. 22. Yansib Yanbu BMS Project
    23. 23. Yansab Yambu BMS Project
    24. 24. CLINT: MARAFIQ SWTP-9SUB- STATION CUSTOMER : SAUDI E-PHASE
    25. 25. Marafiq SWTP 9 (substation) Project
    26. 26. Marafiq SWTP 9 (substation) Project
    27. 27. Marafiq SWTP 9 (substation) Project
    28. 28. Marafiq SWTP 9 (substation) Project
    29. 29. Marafiq SWTP 9 (substation) Project
    30. 30. Marafiq SWTP 9 (substation) Project
    31. 31. ELECTRICAL & COMMISSIONING - Installation, Testing, Commissioning and Maintenance We will continue to meet the challenging needs of our clients with our quality services delivered by the most qualified people. Power Link Arabian Co. Ltd. has successfully accomplished the job of all kinds of Electrical work with the appreciation letter of from our client TASNEE • Installation, Testing, Commissioning and Maintenance • Underground and overhead distribution network. • Electrification of Buildings and Plant facilities. • Telecommunication works and security alarm system. • Power system, Substation, Switchgears and MCC. • Plant equipment, facilities and controls. • Calibration of System protection and monitoring devices.
    32. 32. Hierarchy for Electrical work Planning Engineer Safety Officer Document Control Permit ReceiverProject Engineer Project Manager Project Supervisor Foreman Electrical Technician Instrument Technician Helper Labor
    33. 33. PICTURES OFPICTURES OF ELECTRICAL JOBELECTRICAL JOB
    34. 34. CLINT: TASNEE AL-ROWAD
    35. 35. TASNEE Group Rowad Power Station Project
    36. 36. TASNEE Group Rowad Power Station Project
    37. 37. TASNEE Group Rowad Power Station Project
    38. 38. TASNEE Group Rowad Power Station Project
    39. 39. TASNEE Group Rowad Power Station Project
    40. 40. TASNEE Group Rowad Power Station Project
    41. 41. LETTER OF APPRECATION
    42. 42. CLINT: SAUDI ARAMCO CUSTOMER : ABHASAIN SYNCHRONIZATION OF THREE EXISTING GENERATORS WITH AUTOMATIC SHIFTING (SUPPLY & INSTALLATION)
    43. 43. Petro Rabic Project
    44. 44. Petro Rabic Project
    45. 45. Petro Rabic Project
    46. 46. MECHANICAL, STEEL STRUCTURE & FEBRICATION We hope that you will find the enclosed information of benefit in assessing our organization and we look forward to having the opportunity of putting our Mechanical & Fabrication skill to work for you. Mechanical Works, Steel Structure & Fabrication • HVAC Design and installations. • Steel Fabrication and Installation. • Fabrication, Installation and Erection of Steel Structure, GSM Towers.
    47. 47. Hierarchy for Civil work Planning Engineer Safety Officer Document Control Permit ReceiverBackhoe Project Engineer Project Manager Project Supervisor Foreman Steel & Pipe Fabricator Ducting Fabricator Welder Plumber Pipe Fitter Erector Dump Truck Loader Crane Bobcat Boom Truck Operator & Driver
    48. 48. TASNEE Group Rowad Power Station Project
    49. 49. TASNEE Group Rowad Power Station Project
    50. 50. PICTURES OFPICTURES OF MECHANICAL, STEELMECHANICAL, STEEL STRUCTURESTRUCTURE && FEBRICATION JOBFEBRICATION JOB
    51. 51. CLINT: SAUDI ARAMCO CUSTOMER : JOHNSONS CONTROL
    52. 52. NPOC Project Saudi Aramco
    53. 53. NPOC Project Saudi Aramco
    54. 54. NPOC Project Saudi Aramco
    55. 55. NPOC Project Saudi Aramco
    56. 56. NPOC Project Saudi Aramco
    57. 57. NPOC Project Saudi Aramco
    58. 58. NPOC Project Saudi Aramco
    59. 59. NPOC Project
    60. 60. NPOC Project
    61. 61. INSTRUMENTATION & AUTOMATION It is the underlying policy of Power Link Arabian Co. Ltd. to develop and train the indigenous labor force and retain this staff within the subsidiary operation, providing Technology Transfer in the specialist areas of Instrumentation & Automation. In this regard we believe that we have been very successful Instrumentation & Automation Works: • Installation, process equipment / facilities, piping controls, testing & commissioning Instrumentation devices. • Calibration of Flow control system and supervisory instruments, Tanks / pipe probers, storage tanks, and gauging devices. • Plant automation for process operation enhancement. • In-house testing commissioning of Plant / refinery instruments.
    62. 62. Hierarchy for Instrumentation & Automation Planning Engineer Safety Officer Document Control Permit ReceiverProject Engineer Project Manager Project Supervisor Foreman Electrical Technician Instrument Technician Helper Labor
    63. 63. PICTURES OFPICTURES OF INSTRUMENTATION &INSTRUMENTATION & AUTOMATION JOBAUTOMATION JOB
    64. 64. CLINT: TASNEE AL-ROWAD POWER MANAGEMENT OF 18 x 1.6 MW POWER STATION WITH SCADA
    65. 65. TASNEE Group Rowad Power Station Project
    66. 66. TASNEE Group Rowad Power Station Project
    67. 67. TASNEE Group Rowad Power Station Project
    68. 68. TASNEE Group Rowad Power Station Project
    69. 69. TASNEE Group Rowad Power Station Project
    70. 70. TASNEE Group Rowad Power Station Project
    71. 71. TASNEE Group Rowad Power Station Project
    72. 72. CLINT: SAUDI ARAMCO CUSTOMER: AL ASWAD SUPPLY INSTALLATION COMMISIONING OF FUEL MANAGEMENT SYSTEM WITH SCADA AT SAUDI ARAMCO CORPORATE DATA CENTER
    73. 73. Master Control Pannel for Fuel Management at CDC
    74. 74. Master Control Pannel for Fuel Management at CDC
    75. 75. Master Control Pannel for Fuel Management at CDC
    76. 76. CLINT: SABIC – ALBAYRONI EXPANSION PLANT SUPPLY & INSTALLATION CIVIL MACHINCAL ELECTRICAL
    77. 77. AL-HASA PROJECT SEC - OHTL
    78. 78. THE END

    ×