Your SlideShare is downloading. ×
0
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
All hands presentation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

All hands presentation

568

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
568
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. PARC: Organizational & Communications Overview<br />Natalie Goodwin-FrankDan Allen<br />
  • 2. Overview<br /><ul><li> Management & Organization
  • 3. Meetings
  • 4. Research Affiliate Program
  • 5. Scientific Exchange Program
  • 6. Reports Submitted
  • 7. Frequently Asked Questions (FAQs)
  • 8. Reminders
  • 9. Logo Contest for New Website</li></li></ul><li>Oversight & Management Structure<br />THEME 2<br />Biohybrid Antennas<br />OPERATIONS COMMITTEE<br />Associate DirectorDewey Holten<br />SCIENTIFIC ADVISORY COMMITTEE<br />STEERING COMMITTEE<br />PARCDirectorBob Blankenship<br />THEME 3<br />Bioinspired Antennas<br /><ul><li>Evaluate progress
  • 10. Ensure integration
  • 11. Monitor performance
  • 12. Provide sci. leadership
  • 13. Foster synergy
  • 14. Maximize productivity
  • 15. Provide admin. support
  • 16. Manage meetings
  • 17. Organize & communicate</li></ul>THEME 1<br />Natural Antennas<br />
  • 18. Scientific Advisory Committee<br />CHAIR<br />Mark Wrighton<br />Washington University<br />Elizabeth Gantt<br />University of Maryland<br />Thomas Moore<br />Arizona State Univ.<br />Kenneth Sauer<br />Univ. of California,<br />Berkeley<br />Others<br />TBD<br />
  • 19. Steering Committee<br />THEME 3<br />Bioinspired AntennasDewey Holten<br />THEME 2<br />Biohybrid Antennas<br />Neil Hunter<br />OPERATIONS<br />Natalie Goodwin-Frank<br />P A R C<br />Director, Bob Blankenship<br />Associate Director, Dewey Holten<br />THEME 1<br />Natural Antennas<br />Himadri Pakrasi<br />
  • 20. Operations Committee<br />OPERATIONS<br />Natalie Goodwin-Frank<br />Erin Plut<br />P A R C<br />Director, Bob Blankenship<br />Associate Director, Dewey Holten<br />EDUCATION & OUTREACH<br />Rachel Ruggirello<br />COMMUNICATIONS<br />Liz Dorland<br />TBN Multimedia Specialist<br />
  • 21. Meetings<br /><ul><li> Theme 3 September 3, 2009
  • 22. Seminar Series I November 5, 2009
  • 23. Themes 1 & 2 January 6-7, 2010
  • 24. DOE Visit January 29, 2010
  • 25. Seminar Series II February 19, 2010
  • 26. EFRC Directors March 1, 2010
  • 27. Seminar Series III May 18, 2010
  • 28. All Hands June 3-4, 2010
  • 29. DOE Review June 11, 2010
  • 30. SAC Meeting October 20, 2010
  • 31. EFRC Meeting Spring 2011</li></li></ul><li>Research Affiliate Program<br /><ul><li>Designed to encourage external collaborations and partnerships.
  • 32. Focused on investigators from academic or non-profit institutions that are not current members of PARC.</li></ul>Current PARC Research Affiliates >><br />Gregory Engel<br />The University of Chicago<br />Harry Frank<br />University of Connecticut <br />David Kramer<br />Washington State University<br />Min Chen<br />University of Sydney, Australia<br />Ladislav Nedbal <br />Institute of Systems Biology & Ecology, Academy of Sciences of the Czech Republic<br />Paul Loach and Pamela-Parkes Loach Northwestern University<br />Hugh O’NeillOak Ridge National Laboratory<br />
  • 33. Scientific Exchange Program<br />Travel grants for graduate students & postdocs to visit PARC and non-PARC labs.<br /><ul><li> Posted on the ning http://parc-wustl.ning.com/
  • 34. Deadlines: Feb. 8, 2010July 1, 2010 Nov. 1, 2010
  • 35. Awards will normally range from $1,000 - $5,000</li></li></ul><li>Reports Submitted to DOE<br />Due to DOE on April 30:<br /><ul><li> Operational Review Document (one-time)
  • 36. Annual Progress Report
  • 37. Subawardee reports are due April 22 annually</li></li></ul><li>FAQs<br />May I carryover unspent funds to the next budget year?<br /><ul><li> Yes; Explain if over 20% of the available funds</li></ul>May I spend salary funds on supplies? On equipment?<br /><ul><li>Yes; Equipment does not get overhead/indirect costs. </li></ul>Does this purchase count toward equipment? <br /><ul><li>>$5K, non-expendable item, useful life >2yrs.</li></ul>When does DOE need to be notified of a change?<br /><ul><li>$100K or more
  • 38. Revised budget page needed for future costs exceeding 25% of original</li></li></ul><li>Reminders<br />Please…<br /><ul><li> Cite PARC in your publications
  • 39. Send copies of your PARC publications
  • 40. Send details of outreach activities
  • 41. Share your feedbackparc-efrc@wustl.edu</li></li></ul><li>PARC<br />
  • 42. PARC needs a logo!<br />
  • 43. PARC Logo Contest<br /><ul><li> Members of the community will submit their own design for a new PARC logo.
  • 44. Submissions can be sent in any format.
  • 45. Photoshop it, draw it, paint it, etc. Whatever works, we want to see it.
  • 46. Submissions will be sent to me - Dan_Allen@wustl.edu</li></ul>- The pool of submissions will be narrowed down to 3-5 selections.<br /><ul><li> Selections will be posted on and
  • 47. The community will then be able to vote on their favorite to become the new PARC logo. </li></li></ul><li>PARC Logo Contest<br /><ul><li> Submissions will be accepted through the end of summer. The tentative day for the closing submissions is September 3rd. This date is likely to change.
  • 48. Updates on the contest will continuously be sent out over the Ning network and Facebook.
  • 49. The final decision will be made based on votes and the judgment of the PARC</li></ul> Operations staff. <br /><ul><li>The winning submission will be the new logo for PARC.
  • 50. It will be featured on the website, videos, print media, etc. Your logo will be the new face for PARC and the community. </li></li></ul><li>PARC Logo Contest<br />But wait!<br />There’s more!<br />The Winner will receive a $100 Amazon Gift card!<br />
  • 51. PARC Logo Contest<br />Additional Notes<br />- People can and are encouraged to collaborate with other team members.<br /> - Revisions can be made to your design but a final version must be sent in by September 3rd. <br /> - I am happy to help with feedback, ideas, design revisions, etc.<br /> - Be creative. <br />
  • 52. PARC Logo Contest<br />Examples:<br />
  • 53. PARC Logo Contest<br />Examples:<br />

×