Jessica Magnussen

Professional Portfolio
Healthcare Experience
Geary Community Hospital
             Junction City, KS
 Expansion/Renovation of Existing Facility
 Phase 1 – Renovation...
Admitting Waiting
Expanded Main Lobby
Corridor Along Cafeteria
Elevator Lobby
Art Glass at ICU Waiting
ICU Nurse Station
Patient Wing Nurse Station
PACU Nurse Station
Saunders County Hospital
               Wahoo, NE
 Replacement Hospital
 Included Physical Therapy, Pharmacy, Specialty ...
Therapy & Pharmacy Waiting
Recovery Beds
Procedure Room
Nurse Station
Exterior at Main Entry
Fall River Health Services
                Hot Springs, SD
 Replacement Hospital
 Included Specialty Clinic, Radiology, ...
Exterior Rendering
Rendering of Main Lobby
Artist Rendering of Exterior
Grundy County Memorial Hospital
         Grundy Center, IA
 Expansion/Renovation of existing hospital
 Included Specialt...
Information Desk
Main Lobby
Corridor Behind Main Lobby
Exterior at Main Entry
Floor Plan
Centerpoint Medical Office Building
        Independence, MO
 4 story Medical Office Building connected to hospital throu...
Main Lobby facing out
Main Lobby facing in
Elevator Lobby
Exterior
Upcoming SlideShare
Loading in …5
×

Jessica Magnussen Healthcare Portfolio

562 views
538 views

Published on

Published in: Health & Medicine
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
562
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Jessica Magnussen Healthcare Portfolio

  1. 1. Jessica Magnussen Professional Portfolio Healthcare Experience
  2. 2. Geary Community Hospital Junction City, KS  Expansion/Renovation of Existing Facility  Phase 1 – Renovation of ER, Admitting, and Existing Lobby  Phase 2 – Expansion included Surgery Suite, Prep, PACU, Patient Rooms, ICU, Cafeteria and Food Services, Expanded Main Lobby; Addition of 4th floor on existing medical office building  Phase 3 – Renovation of Radiology in progress  Involvement – Enhancement of Phase 1 design; Construction Documents; Phases DD through CA, Assistance with coordination of furniture.
  3. 3. Admitting Waiting
  4. 4. Expanded Main Lobby
  5. 5. Corridor Along Cafeteria
  6. 6. Elevator Lobby
  7. 7. Art Glass at ICU Waiting
  8. 8. ICU Nurse Station
  9. 9. Patient Wing Nurse Station
  10. 10. PACU Nurse Station
  11. 11. Saunders County Hospital Wahoo, NE  Replacement Hospital  Included Physical Therapy, Pharmacy, Specialty Clinic, Surgery , Prep/Recovery, Patient Rooms, ER, Administration  Attached Long Term Care Facility  Involvement – Finish selections through charette process; Interior Design; Construction Documents; Phases DD through CA.
  12. 12. Therapy & Pharmacy Waiting
  13. 13. Recovery Beds
  14. 14. Procedure Room
  15. 15. Nurse Station
  16. 16. Exterior at Main Entry
  17. 17. Fall River Health Services Hot Springs, SD  Replacement Hospital  Included Specialty Clinic, Radiology, Pharmacy, Lab, Surgery, Patient Rooms, ER, Cafeteria and Food Services, Administration  Involvement – Finish selections; Interior Design; Construction Documents; Phases DD through CA.  Currently under construction
  18. 18. Exterior Rendering
  19. 19. Rendering of Main Lobby
  20. 20. Artist Rendering of Exterior
  21. 21. Grundy County Memorial Hospital Grundy Center, IA  Expansion/Renovation of existing hospital  Included Specialty Clinic, Radiology, Specialty Clinic, ER, Administration  Involvement – Finish selections through charette process; Interior Design; Construction Documents; Phases DD through CA.
  22. 22. Information Desk
  23. 23. Main Lobby
  24. 24. Corridor Behind Main Lobby
  25. 25. Exterior at Main Entry
  26. 26. Floor Plan
  27. 27. Centerpoint Medical Office Building Independence, MO  4 story Medical Office Building connected to hospital through upper level bridges  Included Main Lobby, Corridors, and Public Restrooms  Involvement – Finish selections; Interior Design; Construction Documents; Phases DD through CA; Furniture and artwork selections.
  28. 28. Main Lobby facing out
  29. 29. Main Lobby facing in
  30. 30. Elevator Lobby
  31. 31. Exterior

×