Your SlideShare is downloading. ×
STaR chart
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

STaR chart

130
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
130
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Texas STaR Chart S chool T echnology a nd R eadiness Begin
  • 2. Introduction
    • Developed from the 4 domains of the Texas Long Range Plan for Technology
    • Goal is to help districts & campuses evaluate progress
    • 2006-2009 Evaluated
  • 3. 4 Domains
    • Teaching & Learning
    • Educator Preparation &
    • Development
    • Leadership, Administration,
    • and Instructional Support
    • Infrastructure for Technology
    • Website: http://starchart.esc12.net/docs/TxCSC.pdf
  • 4. Poteet High School
    • 2006-2007 Advanced Tech Rating in all 4 domains
    • 2007-2008 Advanced Tech Rating in all 4 domains
    • 2008-2009 Advanced Tech in 3 domains; Target Tech in 1
  • 5. 2008-2009 Data
  • 6. Texas STaR Chart Summary
  • 7. Summary/Conclusion Poteet High School
    • 3 years of consistency
    • Always at least Advanced Tech
    • Progressing
    • and Achieving
    • the Long Range
    • Plan Goals
    The End
  • 8. Slide Show Over!