Your SlideShare is downloading. ×
Marketing Graphics Designer
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Marketing Graphics Designer

578
views

Published on

Photo and image manipulation for marketing, brochures, web, etc.

Photo and image manipulation for marketing, brochures, web, etc.

Published in: Business, Technology

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
578
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. S-223 P5000 PackerPenetrator Procedure Prepared for ENCANA - Weatherford Qatar Prepared byQUICK CONNECTORS INC. 5226 Brittmoore ♦ Houston, Texas 77041 Date prepared April 7, 2008
  • 2. Quick Connectors Incorporated (QCI) is a leading provider of wellhead and QCI - About UsPacker Penetrator Systems Manifold Bushing Examples packer penetrator systems for use with electrical submersible pumps (ESP). QCI is proud of delivering quality, on-time products that meet our customers requirements. We have over 20 years of oil field experience installing our systems worldwide with a track record of excellence and reliability. QCI electrical penetrator systems eliminate the need for cable splicing, saving hours of costly rig time, and increasing reliability by reducing exposure to reactive agents. QCI offers various types of wellhead penetrator systems designed to work with a variety of Standard 3-Hole applications to meet customer requirements and needs. QCI wellhead penetrator systems can be designed to fit new or existing wellheads (concentric or non-concentric applications), or to accommodate wellhead applications that were not originally designed for use with ESP applications. QCI wellhead penetrators can be easily retrofitted to replace existing competitor type mandrel penetrator systems. QCI also offers specialty penetrator systems for applications requiring the use of BOP Cans, ESP Packers, dual or triple completions, and heater applications. These applications can also be retrofitted Multiple Ports for to replace existing competitor systems. Additional Control Lines All of the QCI penetrator systems are suitable for 375°F/ 190°C, and can be fitted to all ESP pump cables and electrical requirements currently in use (up to 5000 Volts and 250Amps). QCI operates under the ISO 9001-2000 requirements. All of the QCI wellhead penetrator systems are third party approved by Factory Mutual (FM) and CSA. The QCI products are designed to meet the highest classifications for safety compliance within the United States for operation of electrical equipment in hazardous/explosive locations (Class I, Divisions 1 & 2). We pride ourselves on quick delivery and excellent engineering support. QCI provides on-site installation (domestic and international) and can provide technical support through highly trained international representatives. Complete in-house training simulating wellhead and packer penetrator installation can be provided for customers who wish to install QCI equipment. Training videos and installation procedures are available upon request. QCI – Unique, Adaptable, Global Multiple Port Type Dual String Type Packer Packer 1 Lower Pump Cable 5 Manifold Bushing 2 Triskelion Lower 6 Male & Female Connectors 3 Male & Female Connectors 7 Triskelion Upper 4 Seal Fittings 8 Upper Pump Cable Features/Specifications ? No splices above and below the packer. ? A mainfold bushing is provided for dual string packers, and can accommodate extra ports for control lines, if necessary. ? For small diameter and multiple port packers, the penetrators pass through 3 individual ports through the packer. ? Voltage: 5000 VAC, 3 Phase ? Amperage: 150 Amp and 257 Amp versions available 8 Multiple Port Dual String ? Pressure: 5,000 psi API WP (10,000 psi Proof Test) 1 1 Type Packer Type Packer ? Temp: 375° F, 190° C
  • 3. P3000-2 P5000-Dual ESP Triskelion 3” Union P3000-2 Mini Mandrel Surface Power Cable (CLX) Male & Female Connectors Surface Conduit System P3000-2 Canned Pump Coupling (CPC) Cable Gland Bottom Seal Fitting Detonation Arrestor Top Seal Fitting Cable Gland Wellhead Penetrator System Surface Conduit System P5000 Dual ESP Flexible Fitting Surface Power Cable (CLX) Breather Vent/Detonation “Boll Weevil Type” Arrestor Wellhead Penetrator System Bracket Assembly Features/Benefits Specifications Features/Benefits Specifications ? Eliminates cable splices in the wellbore. ? FM & CSA Approved ? Adaptable with either concentric or eccentric ? FM & CSA Approved wellhead completions, and can be run in small ? Available as a P3000-2F for flat cable. ? Voltage: Dependant on Max. Rating of ESP Cable annular space wells. ? Voltage: 5000 VAC, 3 Phase ? Cable is stripped, and three pump cable wires are ? Amperage: Dependant on Max. Rating of ESP Cable ? Eliminates cable splices in the wellbore. Three ? Amperage: 150 Amp and 257 Amp versions available separated and sealed off with an EPDM sealing element and mini mandrel insert. Pump cable (flat or round) is ? Pressure: 3,000 psi API WP (6,000 psi Proof Test) plug-in connections are all that are required below ? Pressure: 5,000 psi API WP (10,000 psi Proof Test) the hanger. run continuously through the wellhead. ? Temp: 375° F, 190° C ? Temp: 375° F, 190° C ? Reusable surface conduit system suitable for hazardous ? Hazardous Area: Class I, Divisions 1 & 2 Group D ? Three flexible fittings with Swagelok connections ? Hazardous Area: Class I, Divisions 1 & 2 Group D seal off the penetrator above and below the tubing locations. hanger. ? Designed to eliminate large mandrel type penetrators. ? Permits the use of shielded and non-shielded ? UL listed surface cable (CLX) is terminated and sealed cables. in the conduit system for required length to reach the motor control panel. ? Reusable surface conduit system suitable for hazardous locations. ? Permits the use of shielded and non-shielded cables. ? UL listed surface cable (CLX) is terminated and sealed in the conduit system for required length to reach the motor control panel. 2 7
  • 4. 3/4” NPT PTP3000-2DM 3/4” NPT /4” PT 3/4 NPT 4” ► Eliminates cable splices in the wellbore. ► Available as a P3000-2FDM for flat cable. 1/4” NPT ► ESP cable is stripped and the three cable wires are separated and sealed off with an elastomer sealing element. ► A QCI dummy mandrel is provided to fit the existing wellhead, replacing the competitor’s mandrel. ► Reusable surface conduit system suitable for hazardous locations. ► UL listed surface cable (CLX) is terminated and sealed in the conduit system for required length to reach the power supply. ► Permits the use of shielded and non-shielded cable.
  • 5. 4 3Specifications 6 5 2 7 1 P3000-2 “Boll Weevil” Type P3000-2DM ● FM & CSA Approved 1 P3000-2 Mini Mandrel P3000-2 Mini Mandrel ● Voltage: Dependant on Max. Rating of ESP Cable 2 CPC Elbow Assembly (CPC) Canned Pump Coupling ● Amperage: Dependant on Max. Rating of ESP Cable 3 Surface Junction box Surface Conduit System ● Pressure: 3,000 psi API WP (6,000 psi Proof Test) 4 Breather Vent Breather Vent/Detonation Arrestor T ● Temp: 375° F, 190° C 5 Cable Terminator Fitting Cable Gland H ● Hazardous Area: Class I, Divisions 1 & 2 Group D 6 Surface Power Cable (CLX) Surface Power Cable
  • 6. S-223 P5000 Packer PenetratorInstallation Procedure Prepared for Tarpon Operating WC 661 A2 Prepared by QUICK CONNECTORS INC. 5226 Brittmoore ♦ Houston, Texas 77041 Date prepared February 19, 2008
  • 7. S-111 P5000 PackerPenetrator InstallationPrepared forONGC IndiaSchlumbergerPrepared byQUICK CONNECTORS INC.5226 Brittmoore ♦ Houston, Texas 77041Date preparedJune 19, 2008
  • 8. S-222 P5000 Model 1Wellhead Penetrator Installation Prepared for Tarpon Operating WC 661 A2 Prepared by QUICK CONNECTORS INC. 5226 Brittmoore ♦ Houston, Texas 77041 Date prepared January 11, 2008
  • 9. S-219 P5000 Wellhead Heater Cable Installation Procedure Prepared ffor Prepared or Pemex - Tyco Pemex - Tyco Angosttura 21 Angos ura 21 Prepared by Prepared by QUICK CONNECTORS INC. 5226 Brriittttmoorre ♦ Houstton,, Texas 77041 5226 B moo e ♦ Hous on Texas 77041 Datte prreparred Da e p epa ed Marrch 28,, 2008 Ma ch 28 2008
  • 10. Tyco Wellbore Heating – Olowi Field DevelopmentCNRI – QCI
  • 11. S-226 P5000 Wellhead Penetrator Installation Procedure Prepared for AGIBA - FMC Egypt Prepared by QUICK CONNECTORS INC. 5226 Brittmoore ♦ Houston, Texas 77041 Date prepared March 26, 2008
  • 12. Photo composite with poster affect,feathered 20 px

×