CRIF Presentation_15th Nov_Final Event
 

CRIF Presentation_15th Nov_Final Event

on

  • 466 views

Introductory presentation by Sheryl French, Delivery Manager for the CRIF Project, at the final CRIF event on 15th November 2011.

Introductory presentation by Sheryl French, Delivery Manager for the CRIF Project, at the final CRIF event on 15th November 2011.

Statistics

Views

Total Views
466
Views on SlideShare
432
Embed Views
34

Actions

Likes
0
Downloads
6
Comments
0

1 Embed 34

http://crif.wordpress.com 34

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    CRIF Presentation_15th Nov_Final Event CRIF Presentation_15th Nov_Final Event Presentation Transcript

    • Cambridgeshire Renewables Infrastructure Framework CRIF – why now? Sheryl French, Delivery ManagerThis project is being developed as part of the Climate Change Skills Fund. The fund is managed by Sustainability East on behalf of Improvement East
    • Why the CRIF? CRIF Project 2019 £6b 1992 2000 2011 2020 <2031The EarthSummit, Rio Kyoto Protocol EU RE Targets Climate Change Act 2008 e.g. Code for Sustainable Homes CRIF RE Delivery RE Investment#crifcambs Growth in Cambs Clean Tech
    • Energy Security & Cost Zero Carbon Policy DECC Renewable Energy Capacity Study Decarbonising Cambridge Cambridgeshire CRIF Project Community Energy This is the Fund focus of today Public/ Community Delivery Investment Private £6 bullion ESCO Public Sector Delivery ?Cambridgeshire Commercial DeliverySustainableFinance Model#crifcambs www.crif.citizenscape.net
    • Along the way…challenges #crifcambs http://www.youtube.com/watch?v=IuXGSEyJjoY&feature=youtube_gdata
    • Future ChallengesLong term planning –invest to save - to ease on-going and future austerity measures due to rising fuelcostsManage uncertainty –but still deliver.. uncertainty is not a reason to do nothingTrust –stakeholders need to deliver a shared agenda built around greater energy self-reliance in Cambridgeshire. This needs to be coordinated and managed together.Communication and education –The CRIF Project has touched the tip of the ice-berg -more needs to be done toprepare Cambridgeshire residents/businesses to move to the new paradigm –post petroleum man