The First Complete Emergency Power Systems
to Be Preapproved by
for California Healthcare Facilities
                     ...
What is OSHPD certification?
  OSHPD: the Office of Statewide Health Planning and Development,
  the California state agen...
Upcoming SlideShare
Loading in...5
×

Cummins Power Generation OSHPD Flyer

1,576

Published on

What does complete system preapproval
mean for you? Save time, Save money!
You benefit from faster installation and commissioning, because each component of your emergency power system installation does not need to be tested and certified before being delivered to you.

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,576
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
31
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Cummins Power Generation OSHPD Flyer

  1. 1. The First Complete Emergency Power Systems to Be Preapproved by for California Healthcare Facilities Generator sets from 10 kW – 2500 kW PowerCommand® automatic transfer switches PowerCommand digital master controls What does complete system preapproval mean for you? Save time Save money You benefit from faster installation and commissioning, because each component of your emergency power system installation does not need to be tested and certified before being delivered to you.
  2. 2. What is OSHPD certification? OSHPD: the Office of Statewide Health Planning and Development, the California state agency charged with ensuring that hospitals and other critical healthcare facilities in California are able to continue operating after an earthquake. Certification: OSHPD certifies equipment as able to withstand seismic events. Ordinarily, all equipment subject to OSHPD review must be individually tested on a shake-table to be certified. What is OSP preapproval? OSP: the OSHPD Special Seismic Certification Preapproval program. OSP facilitates swift review and approval of essential non-structural components in healthcare facilities to ensure reliability under seismic events. − Rigorous verification of representative units from a product line — mechanical testing combined with structural simulation and analysis — is required for preapproval qualification. − Once a product line is preapproved, units from that line — regardless of size — can be installed without individual testing. Preapproval saves time and money for OSHPD, designers, contractors and facility owners alike, as well as provides a formal online reference list for all healthcare stakeholders. What equipment is preapproved? Cummins Power Generation Inc. is the first manufacturer able to supply an entire preapproved emergency power system for hospitals in California: Full range of generator sets, from 10 kW – 2500 kW PowerCommand automatic transfer switches (ATS) PowerCommand digital master controls (DMC) What is the Power of One™ ? Generator sets, transfer switches and digital master controls from Cummins Power Generation are designed and built to work together, more reliably and more efficiently. That’s what we call The Power of One. The preapproval of complete power systems under the OSP program is another example of that power — power you can rely on in emergencies when lives are at stake. Learn more at oshpdsolutions.com Find the Cummins Power Generation distributor nearest you at http://www.cumminspower.com/en/locator/ ©2010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. The Power of Our energy working for you. TM One™ and “Our energy working for you.™” are www.cumminspower.com trademarks of Cummins Power Generation. F-2261 (8/10)

×