Updated plans and drawings for the College of the Rockies South Entrance Expansion. The project began in Summer '09. Expected completion for Phase 1 is Sept 2010.

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
615
On SlideShare
0
From Embeds
0
Number of Embeds
220
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

College of the Rockies Expansion

  1. 1. COTR South Expansion Project<br />September 16, 2009 Project Update<br />
  2. 2. Construction Project Update<br />Please remember that the construction site is out of bounds. <br />In emergency situations (i.e. fire alarms) the emergency exit at the south end of the 180 hallway (across from computer lab 184) will be available. <br />
  3. 3. College of the Rockies – Building profile facing south (not showing Summit Hall)<br />Phase One: Construction of new South Entrance<br /><ul><li> Planned completion by September 2010* (View Construction Schedule)
  4. 4. Construction Management firm has been hired (Wales McLelland of Burnaby, BC)
  5. 5. Site Supervisor will arrive Sept 21, 2009
  6. 6. First public tender (for foundation) was advertised on Sept 15 and will close Sept 24
  7. 7. Weekly updates will be posted for staff on the Announcements board.
  8. 8. The public can view updates on our blog: http://cotr-social.cotr.bc.ca/blogs/</li></ul>Phase Two: Reconfiguration of Existing Office Space<br /><ul><li> Planned completion by March 2011*
  9. 9. Phase two will begin upon completion of Phase One
  10. 10. Office space in the existing Kootenay Hall building will be reconfigured to maximize efficiency. Plans are currently underway and are subject to change. </li></ul>* Completion dates are our best estimate only and may change as the project progresses<br />
  11. 11. First floor expansion – showing existing building (shaded)<br />View PDF<br />
  12. 12. View PDF<br />
  13. 13. Second floor expansion – showing existing building (shaded) <br />View PDF<br />
  14. 14. View PDF<br />
  15. 15. Standing at the main entrance (upper level) looking in <br />
  16. 16. Looking towards Reception/Registration area from inside main entrance.<br />
  17. 17. Exterior View South West<br />
  18. 18. Exterior South View <br />
  19. 19. Exterior View South East<br />Note the skylights along the roofline to bring in natural light <br />
  20. 20. Interior view (upper level) looking out<br />on July 31 at 3:30pm<br />Interior view (upper level) looking out<br />on December 21 at noon<br />
  21. 21. Interior View on Upper Level<br />Looking towards the exit/entrance . Note the fireplace gathering area.<br />
  22. 22. Interior View 1 - Lower Level<br />Looking down the hallway from the student lounge. Note skylights above. Hallway is open to upper level. <br />
  23. 23. Interior View 2 - Lower Level<br />Looking South East (towards exit/entrance) from the student lounge area.<br />
  24. 24. View PDF<br />

×