CORE IN THE CORNER OFFICE        The Agnico‐Eagle     Exploration Show and Tell       145 King Street East, Suite 400     ...
Pinos Altos – MexicoExploration Success Adding to Growth Opportunities   2011         Estimated production of 168,000oz ...
Mexico
Cubiro & Colorada Areas
Cubiro Vein – Geology Map
Cubiro Vein – Mineralization 3D Model      View Looking north-northeast (+/- 1.0 g/Au t grade shell over 2m width)
Cubiro Vein Longsection         Contoured Au Intercepts (Approx. >2m @ + 0.3 g Au/t)                       View Looking No...
Cubiro Vein – Mineralization 3D ModelLongsection View                       Looking Northeast                        Decem...
Cubiro Vein – Mineralization 3D Model        Cross Section ViewCross Section-16(Showing Loc. of CB-09-015)                ...
Kittila MineOptimization Phase Bearing Significant Results   2011      Estimated production of 150,000oz Au at cash cost...
Kittila Mine - Longitudinal Section                                             Section 37870 mN                          ...
Kittila Mine                            Tonnes,                                            Au, g/t     Au, Moz.           ...
Kittila Mine – Underground Operation
Kittila – Geology Map
Kittila - Cross Section 37870 mN                       North                       Roura                       Zone       ...
LaRonde – CanadaIncreasing Gold Output in 2012   2011      Estimated production of 157,000oz Au at cash costs of       $...
Abitibi Regional Map
Ellison-Bousquet- LaRonde – Exploration Targets 2011
Building from StrengthDoyon-Bousquet-LaRonde Mining Camp             Aerial Photo Looking West                            ...
Bousquet Zone 5 - Surface View                            Zone 5                       Zone 4                             ...
Bousquet Zone 5 Longsection - 2011 Program                                                                                ...
Surface      Bousquet Zone 5                                                                                           n  ...
LaRonde Exploration Targets – Budget 2011Puits Bousquet I          Puits Bousquet II   Puits I          Puits Penna   Puit...
Abitibi Regional Map
Ellison Project - Longitudinale Section
Ellison Project - Longitudinal Section
Ellison Project                  Drill Site                               Camping Resort
Goldex – CanadaStrong Free Cash Flow Generator    2011       Estimated production of 185,000oz Au at cash costs of      ...
Goldex - 2011 Exploration Budget                                                                              View Looking...
Goldex                                  76-003                                  1.27 g/t Au / 60.0 m    73-406    2.07 g/t...
Goldex - Cross Section 6190E
Section 6040
Meliadine Project, Rankin Inlet, Nunavut$129M – Three year exploration & development program underway                     ...
Meliadine – Regional Geology Plan Map
Meliadine – Tiriganiaq Schematic Cross Section
Western Meliadine Property - Local Geology
Meliadine - 2010 Drilling
Meliadine Project Total Magnetic FieldSurface rock samples with assay results > 10g/t Au      Surface rock sample location...
Meliadine Project - Tiriganiaq Longitudinal Section                          M10-1001                          8.62 g/t Au...
Meliadine - 2010 Drilling
Meadowbank – CanadaNewest Mine - Largest Gold Producer Already    2011       Estimated production of 362,000oz Au at cas...
Meadowbank Regional Geology Map                                     PDF                                               Vaul...
Meadowbank Exploration Budget 2011                         Vault – Resource Conversion                         Vault Pit  ...
Vault Cross Section 4675N
Goose South Cross Section 4300N                                  5
Meadowbank – Aerial View
Coreinthe corner presentation
Coreinthe corner presentation
Coreinthe corner presentation
Coreinthe corner presentation
Coreinthe corner presentation
Coreinthe corner presentation
Coreinthe corner presentation
Coreinthe corner presentation
Upcoming SlideShare
Loading in...5
×

Coreinthe corner presentation

161

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
161
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Coreinthe corner presentation

  1. 1. CORE IN THE CORNER OFFICE The Agnico‐Eagle  Exploration Show and Tell 145 King Street East, Suite 400 January 6th and 7th Featuring core and geologists from key  projects: Suuri‐Roura Deep (Kittila),  Tiriganiaq‐F Zone (Meliadine), Westwood (Ellison), D Zone (Goldex), Zone 5 (Bousquet),  Cubiro (Pinos Altos)
  2. 2. Pinos Altos – MexicoExploration Success Adding to Growth Opportunities 2011  Estimated production of 168,000oz Au at cash costs of $400/oz  Mascota: 31,000oz Au at cash costs of $439/oz 2012-2015  Estimated average annual production of 175,000oz Au at cash costs of $345/oz  Underground to account for majority of production  Mascota: 55,000oz Au at cash costs of $299/oz Exploration Focus  Potential to develop satellite deposits (Cubiro, Sinter, San Eligio)  Focus on resource conversion, expansion of Pinos Altos zones, Reyna de Plata, Creston Mascota Gold reserves (m oz) 3.4 Average reserve grade (g/t) 2.5 Measured & Indicated resource (m oz) 0.5 Inferred resource (m oz) 0.7 Est. LOM (years) 18 Estimated average production (k oz/yr) 170 2011 exploration budget $2M
  3. 3. Mexico
  4. 4. Cubiro & Colorada Areas
  5. 5. Cubiro Vein – Geology Map
  6. 6. Cubiro Vein – Mineralization 3D Model View Looking north-northeast (+/- 1.0 g/Au t grade shell over 2m width)
  7. 7. Cubiro Vein Longsection Contoured Au Intercepts (Approx. >2m @ + 0.3 g Au/t) View Looking Northeast
  8. 8. Cubiro Vein – Mineralization 3D ModelLongsection View Looking Northeast December, 2010
  9. 9. Cubiro Vein – Mineralization 3D Model Cross Section ViewCross Section-16(Showing Loc. of CB-09-015) Drillhole CB-09-015200 meter Grid View Looking northeast December, 2010 Assay Summary
  10. 10. Kittila MineOptimization Phase Bearing Significant Results 2011  Estimated production of 150,000oz Au at cash costs of $548/oz  Expansion study to be reviewed Q3 2011 2012-2015  Estimated average annual production of 173,000oz Au at cash costs of $501/oz Exploration Focus  Resource conversion, expansion below Suuri and Roura, and along strike Gold reserves (m oz) 4.0 Average reserve grade (g/t) 4.8 Measured & Indicated resource (m oz) 1.4 Inferred resource (m oz) 0.6 Est. LOM (years) 22 Estimated average production (k oz/yr) 150 2011 exploration budget $16M
  11. 11. Kittila Mine - Longitudinal Section Section 37870 mN ROU-10-026B 7.25 g/t Au / 10.0 m 6.46 g/t Au / 12.8 m ROU-10-024B 3.85 g/t Au / 10.1 m ROU-10029 ROU-10-026 1.76 g/t Au / 2.1 m 3.98 g/t Au / 17.2 m ROU-10-024 ROU-10029 6.42 g/t Au / 4.9 m 2.68 g/t / 2.3 m
  12. 12. Kittila Mine Tonnes, Au, g/t Au, Moz. MtProven + Probable 26.0 4.8 4.0Mineral Reserve*Indicated Mineral 20.5 2.2 1.4ResourceInferred Mineral 5.2 3.4 0.6Resource N* Reserve and Resource calculation as of December 31, 2009
  13. 13. Kittila Mine – Underground Operation
  14. 14. Kittila – Geology Map
  15. 15. Kittila - Cross Section 37870 mN North Roura Zone CentralROU-10-026B Roura7.25 g/t Au / 10.0 m6.46 g/t Au / 12.8 m Zone
  16. 16. LaRonde – CanadaIncreasing Gold Output in 2012 2011  Estimated production of 157,000oz Au at cash costs of $54/oz 2012-2015  Estimated average annual production of 290,000oz Au at cash costs of $381/oz Exploration Focus  Additional potential at depth, to the East and to the West  Tracing and potentially defining a gold resource at Ellison (appr. 2km west of LaRonde) Gold reserves (m oz) 4.8 Average reserve grade (g/t) 4.4 Measured & Indicated resource (m oz) 0.4 Inferred resource (m oz) 1.4 Est. LOM (years) 13 Estimated average production (k oz/yr) 324 2011 exploration budget $4M
  17. 17. Abitibi Regional Map
  18. 18. Ellison-Bousquet- LaRonde – Exploration Targets 2011
  19. 19. Building from StrengthDoyon-Bousquet-LaRonde Mining Camp Aerial Photo Looking West Mouska DoyonLaRonde Bousquet 1 Bousquet 2Puits 1 Laronde PENNA LaRonde Puits 2
  20. 20. Bousquet Zone 5 - Surface View Zone 5 Zone 4 Bousquet 2 Zone 3 (mined) Bousquet 1 shaft 0 250 meters
  21. 21. Bousquet Zone 5 Longsection - 2011 Program E S10-02 00 Historical Pit Production (80’s) by Long Lac Mineral 2.0 g/t Au over 49.7m (42 tw) 69 1.9 M tonnes @ 2.20 g/t Au => 124 000 ounces Incl. Zone 4 @ 2.9 g/t over 4.5m (3.8 tw) And Zone 5 @ 2.2 g/t over 39.4m (33.5 tw) Surface In progressMineral inventory S10-07 S10-05(0- 500 metres) In progress S10-03 S10-0620.1 Mt @ 1.90 g/t =>1.2 M ounces(Zone 5 only) -250m9.1 Mt @ 1.70 g/t =>0.5 M ounces S10-01(Other parallel zones incl. Zone 4) S10-04 -450m Re-sampling program ±1500 samples (assays pending) Drilling 2010 (started Nov 30th 2010) 2 082 m Drilling Program 2011 (0-500m) 20 000m – 2 000 000 $
  22. 22. Surface Bousquet Zone 5 n Pi t pe .O ox pr ApCross Section 6900E S10-02 S10-02 2.0 g/t Au over 49.7m (42 tw) Incl. Zone 4 @ 2.9 g/t over 4.5m (3.8 tw) and Zone 5 @ 2.2 g/t over 39.4m (33.5 tw) S10-03 Assays pending -250m ined out) Zone 4 Zone 5 Zone 3 (m S10-01 Assays pending S10-04 -450m Logging in progress
  23. 23. LaRonde Exploration Targets – Budget 2011Puits Bousquet I Puits Bousquet II Puits I Puits Penna Puits II 3.8 / 5.4 In progress 5 500m In progress 863 500$ 4 250m 3.0 / 14.3 2 800m TOTAL BUDGET 2011 484 500$ 1.8 / 4.1 532 000$ 12 550m In progress TOTAL : 2 157 773 $ 2010 Results 2011 Targets
  24. 24. Abitibi Regional Map
  25. 25. Ellison Project - Longitudinale Section
  26. 26. Ellison Project - Longitudinal Section
  27. 27. Ellison Project Drill Site Camping Resort
  28. 28. Goldex – CanadaStrong Free Cash Flow Generator  2011  Estimated production of 185,000oz Au at cash costs of $349/oz  2012-2015  Estimated average annual production of 179,000oz Au at cash costs of $344/oz  Exploration Focus  Resource definition and expansion at D zone at depth, exploration to west, east and at depth Gold reserves (m oz) 1.6 Average reserve grade (g/t) 2.1 Measured & Indicated resource (m 0.0 oz) Inferred resource (m oz) 0.8 Est. LOM (years) 7 Estimated average production (k 168 oz/yr) 2011 exploration budget $6M
  29. 29. Goldex - 2011 Exploration Budget View Looking North R-Zone 9 000m / 1M$ East ofM-Zone GEZ 38 Level 8 500 m / 0.9M$S-Zone 38 level GEZ 73 Level E-Zone 84 Level D-Zone 27 300m / 2.8M$ Total 2011 (spacing 60x60m) 105 Level 1900 elev.58,200m / 6M$ D-Zone 13 200m / 1.3M$ 125 Level (spacing 90x90m)
  30. 30. Goldex 76-003 1.27 g/t Au / 60.0 m 73-406 2.07 g/t Au / 105.0 m 73-403 1.23 g/t Au / 151.5 m incl. 3.30 g/t Au / 31.5 m 76-008 1.88 g/t Au / 181.5 m Incl. 2.04 g/t Au / 165.0 m 84-050 1.51 g/t Au / 121.5 m 76-006 incl. 2.10 g/t Au / 30.0 m 1.69 g/t Au / 216.0 m incl. 2.68 g/t Au / 12.0 m incl.2.04 g/t Au / 70.5 m incl. 2.16 g/t Au / 27.0 m incl. 2.06 g/t Au / 90.0 m 73-402 1.34 g/t Au / 96.0 m incl. 2.28 g/t Au / 51.0 m 76-007 0.92 g/t Au / 159.0 m incl. 2.13 g/t Au / 16.5 m incl. 2.21 g/t Au / 19.5 m
  31. 31. Goldex - Cross Section 6190E
  32. 32. Section 6040
  33. 33. Meliadine Project, Rankin Inlet, Nunavut$129M – Three year exploration & development program underway Tonnes Grade (g/t) Contained gold ounces Measured Resource 0.3 million 10.6 101,000 oz Au* Indicated Resource 13 million 7.9 3,191,000 oz Au* Inferred Resource 8 million 6.4 1,731,000 oz Au** As per Jan 12, 2010 technical report by Snowden Mineral Industry Consultants
  34. 34. Meliadine – Regional Geology Plan Map
  35. 35. Meliadine – Tiriganiaq Schematic Cross Section
  36. 36. Western Meliadine Property - Local Geology
  37. 37. Meliadine - 2010 Drilling
  38. 38. Meliadine Project Total Magnetic FieldSurface rock samples with assay results > 10g/t Au Surface rock sample locations 10 km
  39. 39. Meliadine Project - Tiriganiaq Longitudinal Section M10-1001 8.62 g/t Au / 19.3 m incl.15.01 g/t Au / 8.2 m M10-940 10.94 g/t Au / 7.0 m
  40. 40. Meliadine - 2010 Drilling
  41. 41. Meadowbank – CanadaNewest Mine - Largest Gold Producer Already  2011  Estimated production of 362,000oz Au at cash costs of $597/oz  2012-2015  Estimated average annual production of 399,000oz Au at cash costs of $511/oz  Exploration Focus  Focus on resource conversion and expansion of Vault, Goose South and Portage Gold reserves (m oz) 3.7 Average reserve grade (g/t) 3.5 Measured & Indicated resource (m oz) 3.3 Inferred resource (m oz) 0.8 Est. LOM (years) 10 Estimated average production (k oz/yr) 350 2011 exploration budget $7M
  42. 42. Meadowbank Regional Geology Map PDF Vault Portage Goose Island Goose South Program Metres 2011 Budget (‘000’s) Minesite Exploration 19,000 $7,373 Regional Exploration 13,000 $4,029 Total 32,000 $11,402
  43. 43. Meadowbank Exploration Budget 2011 Vault – Resource Conversion Vault Pit Vault East Vault South Tern Lake Porphyry Exploration Far West Iron Formation Goose South Extension Minesite 2011 Budget Metres Program (‘000’s) Conversion 10,500 $3,814 Exploration 8,500 $3,559 Total 19,000 $7,373
  44. 44. Vault Cross Section 4675N
  45. 45. Goose South Cross Section 4300N 5
  46. 46. Meadowbank – Aerial View
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×