Your SlideShare is downloading. ×
  • Like
Coreinthe corner presentation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Coreinthe corner presentation

  • 135 views
Published

 

Published in Business , Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
135
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. CORE IN THE CORNER OFFICE The Agnico‐Eagle  Exploration Show and Tell 145 King Street East, Suite 400 January 6th and 7th Featuring core and geologists from key  projects: Suuri‐Roura Deep (Kittila),  Tiriganiaq‐F Zone (Meliadine), Westwood (Ellison), D Zone (Goldex), Zone 5 (Bousquet),  Cubiro (Pinos Altos)
  • 2. Pinos Altos – MexicoExploration Success Adding to Growth Opportunities 2011  Estimated production of 168,000oz Au at cash costs of $400/oz  Mascota: 31,000oz Au at cash costs of $439/oz 2012-2015  Estimated average annual production of 175,000oz Au at cash costs of $345/oz  Underground to account for majority of production  Mascota: 55,000oz Au at cash costs of $299/oz Exploration Focus  Potential to develop satellite deposits (Cubiro, Sinter, San Eligio)  Focus on resource conversion, expansion of Pinos Altos zones, Reyna de Plata, Creston Mascota Gold reserves (m oz) 3.4 Average reserve grade (g/t) 2.5 Measured & Indicated resource (m oz) 0.5 Inferred resource (m oz) 0.7 Est. LOM (years) 18 Estimated average production (k oz/yr) 170 2011 exploration budget $2M
  • 3. Mexico
  • 4. Cubiro & Colorada Areas
  • 5. Cubiro Vein – Geology Map
  • 6. Cubiro Vein – Mineralization 3D Model View Looking north-northeast (+/- 1.0 g/Au t grade shell over 2m width)
  • 7. Cubiro Vein Longsection Contoured Au Intercepts (Approx. >2m @ + 0.3 g Au/t) View Looking Northeast
  • 8. Cubiro Vein – Mineralization 3D ModelLongsection View Looking Northeast December, 2010
  • 9. Cubiro Vein – Mineralization 3D Model Cross Section ViewCross Section-16(Showing Loc. of CB-09-015) Drillhole CB-09-015200 meter Grid View Looking northeast December, 2010 Assay Summary
  • 10. Kittila MineOptimization Phase Bearing Significant Results 2011  Estimated production of 150,000oz Au at cash costs of $548/oz  Expansion study to be reviewed Q3 2011 2012-2015  Estimated average annual production of 173,000oz Au at cash costs of $501/oz Exploration Focus  Resource conversion, expansion below Suuri and Roura, and along strike Gold reserves (m oz) 4.0 Average reserve grade (g/t) 4.8 Measured & Indicated resource (m oz) 1.4 Inferred resource (m oz) 0.6 Est. LOM (years) 22 Estimated average production (k oz/yr) 150 2011 exploration budget $16M
  • 11. Kittila Mine - Longitudinal Section Section 37870 mN ROU-10-026B 7.25 g/t Au / 10.0 m 6.46 g/t Au / 12.8 m ROU-10-024B 3.85 g/t Au / 10.1 m ROU-10029 ROU-10-026 1.76 g/t Au / 2.1 m 3.98 g/t Au / 17.2 m ROU-10-024 ROU-10029 6.42 g/t Au / 4.9 m 2.68 g/t / 2.3 m
  • 12. Kittila Mine Tonnes, Au, g/t Au, Moz. MtProven + Probable 26.0 4.8 4.0Mineral Reserve*Indicated Mineral 20.5 2.2 1.4ResourceInferred Mineral 5.2 3.4 0.6Resource N* Reserve and Resource calculation as of December 31, 2009
  • 13. Kittila Mine – Underground Operation
  • 14. Kittila – Geology Map
  • 15. Kittila - Cross Section 37870 mN North Roura Zone CentralROU-10-026B Roura7.25 g/t Au / 10.0 m6.46 g/t Au / 12.8 m Zone
  • 16. LaRonde – CanadaIncreasing Gold Output in 2012 2011  Estimated production of 157,000oz Au at cash costs of $54/oz 2012-2015  Estimated average annual production of 290,000oz Au at cash costs of $381/oz Exploration Focus  Additional potential at depth, to the East and to the West  Tracing and potentially defining a gold resource at Ellison (appr. 2km west of LaRonde) Gold reserves (m oz) 4.8 Average reserve grade (g/t) 4.4 Measured & Indicated resource (m oz) 0.4 Inferred resource (m oz) 1.4 Est. LOM (years) 13 Estimated average production (k oz/yr) 324 2011 exploration budget $4M
  • 17. Abitibi Regional Map
  • 18. Ellison-Bousquet- LaRonde – Exploration Targets 2011
  • 19. Building from StrengthDoyon-Bousquet-LaRonde Mining Camp Aerial Photo Looking West Mouska DoyonLaRonde Bousquet 1 Bousquet 2Puits 1 Laronde PENNA LaRonde Puits 2
  • 20. Bousquet Zone 5 - Surface View Zone 5 Zone 4 Bousquet 2 Zone 3 (mined) Bousquet 1 shaft 0 250 meters
  • 21. Bousquet Zone 5 Longsection - 2011 Program E S10-02 00 Historical Pit Production (80’s) by Long Lac Mineral 2.0 g/t Au over 49.7m (42 tw) 69 1.9 M tonnes @ 2.20 g/t Au => 124 000 ounces Incl. Zone 4 @ 2.9 g/t over 4.5m (3.8 tw) And Zone 5 @ 2.2 g/t over 39.4m (33.5 tw) Surface In progressMineral inventory S10-07 S10-05(0- 500 metres) In progress S10-03 S10-0620.1 Mt @ 1.90 g/t =>1.2 M ounces(Zone 5 only) -250m9.1 Mt @ 1.70 g/t =>0.5 M ounces S10-01(Other parallel zones incl. Zone 4) S10-04 -450m Re-sampling program ±1500 samples (assays pending) Drilling 2010 (started Nov 30th 2010) 2 082 m Drilling Program 2011 (0-500m) 20 000m – 2 000 000 $
  • 22. Surface Bousquet Zone 5 n Pi t pe .O ox pr ApCross Section 6900E S10-02 S10-02 2.0 g/t Au over 49.7m (42 tw) Incl. Zone 4 @ 2.9 g/t over 4.5m (3.8 tw) and Zone 5 @ 2.2 g/t over 39.4m (33.5 tw) S10-03 Assays pending -250m ined out) Zone 4 Zone 5 Zone 3 (m S10-01 Assays pending S10-04 -450m Logging in progress
  • 23. LaRonde Exploration Targets – Budget 2011Puits Bousquet I Puits Bousquet II Puits I Puits Penna Puits II 3.8 / 5.4 In progress 5 500m In progress 863 500$ 4 250m 3.0 / 14.3 2 800m TOTAL BUDGET 2011 484 500$ 1.8 / 4.1 532 000$ 12 550m In progress TOTAL : 2 157 773 $ 2010 Results 2011 Targets
  • 24. Abitibi Regional Map
  • 25. Ellison Project - Longitudinale Section
  • 26. Ellison Project - Longitudinal Section
  • 27. Ellison Project Drill Site Camping Resort
  • 28. Goldex – CanadaStrong Free Cash Flow Generator  2011  Estimated production of 185,000oz Au at cash costs of $349/oz  2012-2015  Estimated average annual production of 179,000oz Au at cash costs of $344/oz  Exploration Focus  Resource definition and expansion at D zone at depth, exploration to west, east and at depth Gold reserves (m oz) 1.6 Average reserve grade (g/t) 2.1 Measured & Indicated resource (m 0.0 oz) Inferred resource (m oz) 0.8 Est. LOM (years) 7 Estimated average production (k 168 oz/yr) 2011 exploration budget $6M
  • 29. Goldex - 2011 Exploration Budget View Looking North R-Zone 9 000m / 1M$ East ofM-Zone GEZ 38 Level 8 500 m / 0.9M$S-Zone 38 level GEZ 73 Level E-Zone 84 Level D-Zone 27 300m / 2.8M$ Total 2011 (spacing 60x60m) 105 Level 1900 elev.58,200m / 6M$ D-Zone 13 200m / 1.3M$ 125 Level (spacing 90x90m)
  • 30. Goldex 76-003 1.27 g/t Au / 60.0 m 73-406 2.07 g/t Au / 105.0 m 73-403 1.23 g/t Au / 151.5 m incl. 3.30 g/t Au / 31.5 m 76-008 1.88 g/t Au / 181.5 m Incl. 2.04 g/t Au / 165.0 m 84-050 1.51 g/t Au / 121.5 m 76-006 incl. 2.10 g/t Au / 30.0 m 1.69 g/t Au / 216.0 m incl. 2.68 g/t Au / 12.0 m incl.2.04 g/t Au / 70.5 m incl. 2.16 g/t Au / 27.0 m incl. 2.06 g/t Au / 90.0 m 73-402 1.34 g/t Au / 96.0 m incl. 2.28 g/t Au / 51.0 m 76-007 0.92 g/t Au / 159.0 m incl. 2.13 g/t Au / 16.5 m incl. 2.21 g/t Au / 19.5 m
  • 31. Goldex - Cross Section 6190E
  • 32. Section 6040
  • 33. Meliadine Project, Rankin Inlet, Nunavut$129M – Three year exploration & development program underway Tonnes Grade (g/t) Contained gold ounces Measured Resource 0.3 million 10.6 101,000 oz Au* Indicated Resource 13 million 7.9 3,191,000 oz Au* Inferred Resource 8 million 6.4 1,731,000 oz Au** As per Jan 12, 2010 technical report by Snowden Mineral Industry Consultants
  • 34. Meliadine – Regional Geology Plan Map
  • 35. Meliadine – Tiriganiaq Schematic Cross Section
  • 36. Western Meliadine Property - Local Geology
  • 37. Meliadine - 2010 Drilling
  • 38. Meliadine Project Total Magnetic FieldSurface rock samples with assay results > 10g/t Au Surface rock sample locations 10 km
  • 39. Meliadine Project - Tiriganiaq Longitudinal Section M10-1001 8.62 g/t Au / 19.3 m incl.15.01 g/t Au / 8.2 m M10-940 10.94 g/t Au / 7.0 m
  • 40. Meliadine - 2010 Drilling
  • 41. Meadowbank – CanadaNewest Mine - Largest Gold Producer Already  2011  Estimated production of 362,000oz Au at cash costs of $597/oz  2012-2015  Estimated average annual production of 399,000oz Au at cash costs of $511/oz  Exploration Focus  Focus on resource conversion and expansion of Vault, Goose South and Portage Gold reserves (m oz) 3.7 Average reserve grade (g/t) 3.5 Measured & Indicated resource (m oz) 3.3 Inferred resource (m oz) 0.8 Est. LOM (years) 10 Estimated average production (k oz/yr) 350 2011 exploration budget $7M
  • 42. Meadowbank Regional Geology Map PDF Vault Portage Goose Island Goose South Program Metres 2011 Budget (‘000’s) Minesite Exploration 19,000 $7,373 Regional Exploration 13,000 $4,029 Total 32,000 $11,402
  • 43. Meadowbank Exploration Budget 2011 Vault – Resource Conversion Vault Pit Vault East Vault South Tern Lake Porphyry Exploration Far West Iron Formation Goose South Extension Minesite 2011 Budget Metres Program (‘000’s) Conversion 10,500 $3,814 Exploration 8,500 $3,559 Total 19,000 $7,373
  • 44. Vault Cross Section 4675N
  • 45. Goose South Cross Section 4300N 5
  • 46. Meadowbank – Aerial View