Your SlideShare is downloading. ×
Presentation germany 2
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Presentation germany 2

118
views

Published on

Published in: Business, Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
118
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Structure1. producing biogas2. using biogas3. the biogas plant in Schmiden
  • 2. Producing biogas• Biomass (e.g. maize silage) is taken by local fields and saved in a storage
  • 3. Producing biogas• One time a day, new biomass/silage is putted into the screw charger from were it is transported into the fermenter
  • 4. Producing biogas• The biomass/silage is permanently mixed up in the fermenter• Biogas is produced because of the heating and mixing process of the biomass/silage in the fermenter
  • 5. Producing biogas• The “old” biomass/silage is transported into a second fermenter/ reservoir: – Biogas is built – Biomass is saved to be used again by agriculture fermenter second fermenter/reservoir
  • 6. Using biogas First biogas must be filtered to methanBy burning down the biogas in a block heating station heat and electricity is producedThe heat partly is transported in the fermenter and partly to near buildingsThe electricity is putted into the electric circuit
  • 7. The biogasplant in Schmiden• The biogas of this plant produces … … heat for the own fermentation process … heat for two school centres (in Schmiden and Oeffingen) ... heat for some gyms and two festival halls … electricity for the electric circuit• This is possible because of 3 new block heating stations
  • 8. The biogasplant in Schmiden
  • 9. Sources:http://www.stadtwerke-fellbach.de/umwelt/biogas/http://greenline- energy.de/fileadmin/bild/anlagenschema_01__800 x597.jpg