Ana Reguero - UrbanEnergy Management in Madrid

326 views
294 views

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
326
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
12
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Ana Reguero - UrbanEnergy Management in Madrid

  1. 1. UrbanEnergy Management CUD Global Conference, May 2009 CUD Global Conference, May 2009 Ana Reguero Head of Residential Department from Urbanism Area of Madrid City Council.
  2. 2. CUD Madrid project, a reminder.... “Transforming urban residential buildings and open spaces into a smart environment, allowing for sustainable energy generation, consumption and management in a carbon neutral community”
  3. 3. CUD Madrid project, a reminder.... Schools, Open Spaces Apartments and Offices Homes hospitals, etc. Blocks URBAN SERVICES PLATFORM Urban Broadband Network
  4. 4. CUD Madrid project, mayor goals - Cut down on energy consumption (water, gas, and electricity) in the city - Promote active involvement of the city’s inhabitants - Build awareness about the impact of citizens’ actions on energy consumption and climate change - Create a sense of community among citizens, fostering collaboration for achieving objectives - Establish a scalable, economically viable, intuitive, and nonintrusive model - Design a platform for supporting a global “Intelligent UrbanEnergy Grid” concept for the near future
  5. 5. Design Wireless architecture Home Energy Controller Building IP Home energy network Homecounters Homeenergy counters energy counters Urban Broadband Network Urban Energy Controller
  6. 6. Home Energy Controller -Very simple to use: “users” are very diversed citizens (young, elders) with different IT background (technical savy, afraid of tech) and learning (university, only basic studies) - Personal Trainer concept: main objective is to push citizens in their “energy savings” efforts
  7. 7. Urban Energy Controller
  8. 8. Pilot project: Margaritas 52
  9. 9. Pilot project: Margaritas 52
  10. 10. Project timeline and next steps: UrbanEnergy -21 May 2009 End of building´s construction; - 21 June 2009 Citizens enter the apartments; - June 2009 / August 2009 Maturity testing of the solution - August 2009 UrbanEnergy implemented in the apartments, as well as at building level - August 2009/Jan 2010 Collect information and audit results/benefits - Jan 2010: scale UrbanEnergy Geographical level (expand in Madrid) Functional level (utilities and govt integration)

×