HPC Midlands - Update for Bull eXtreme Computing User Group 2012 meeting
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

HPC Midlands - Update for Bull eXtreme Computing User Group 2012 meeting

on

  • 957 views

 

Statistics

Views

Total Views
957
Views on SlideShare
732
Embed Views
225

Actions

Likes
0
Downloads
4
Comments
0

5 Embeds 225

http://blog.martinh.net 218
http://3480704540309659677_ed172087176715f6bb22b9380d500d683f7a5cb5.blogspot.com 3
https://twitter.com 2
https://si0.twimg.com 1
http://translate.googleusercontent.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

CC Attribution-ShareAlike LicenseCC Attribution-ShareAlike License

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

HPC Midlands - Update for Bull eXtreme Computing User Group 2012 meeting Presentation Transcript

  • 1. HPC MidlandsBull User Group for eXtreme Computing, 2012Martin Hamilton, Centre Manager@martin_hamilton hpc-midlands.ac.uk
  • 2. Tildesley Report – see http://goo.gl/qw2DW
  • 3. e-Infrastructure funding – http://goo.gl/SKgdG
  • 4. What is HPC Midlands? New High Performance Computing facility for academia and industry Jointly operated by Loughborough University and University of Leicester £1m funding from EPSRC/BIS e-Infrastructure programme Building on relationships with existing industrial partners and software providers Opportunity to “operationalize” HPC spending
  • 5. About LoughboroughUniversity
  • 6. Number One forStudent Experience
  • 7. “Research That Matters”
  • 8. Hera: The HPC Midlands Cluster• £1m EPSRC investment + institutional contributions• 3,000 core Bull supercomputer (48 Teraflops)• 11 x chassis (18 blades per chassis)• 188 compute node blades, each with – 2 x 2.0GHz (8 core) Sandy Bridge CPUs• 15TB RAM – 140 blades with 64GB RAM (4GB/core) – 48 blades with 128GB RAM (8GB/core)• 60TB Lustre storage• QDR Infiniband interconnect
  • 9. The Delivery!
  • 10. HPC Midlands Timeline8th December e-Infrastructure call received5th January HPC Midlands proposal submitted19th January Funding awarded23rd January Tender issued against RM721 framework24th January Mechanical and Electrical work commissioned30th January Tenders received and scored, contract awarded to Bull9th February Work begins to prepare the HPC Midlands site24th February Work begins on the plumbing / chilled water supply1st March Space being prepared for new chiller unit9th March 63A circuits now mostly in place15th March Raised floor installed21st March Dedicated chiller unit arrives and craned into place26th March Delivery of HPC Midlands hardware
  • 11. Mechanical and Electrical Work (FM)
  • 12. Mechanical and Electrical Work (FM)
  • 13. Some Assembly Required…
  • 14. Inside a Sandy Bridge compute node
  • 15. HPC Midlands Partners: Intel• Cutting edge hardware innovations  Nehalem/Sandy Bridge/Ivy Bridge  Increase in cores/threads per socket, I/O bandwidth etc  >2bn transistors per CPU!  Many Integrated Core (MIC) Leading player in HPC compilers  Intel Cluster StudioIntel will contribute training on parallelprogramming and their HPC tools
  • 16. HPC Midlands Partners: ANSYSMarket leading HPC software (CFX, FLUENT etc)But significant capital investment required for licenses  Locks out SMEs and spinoffs  Inflexible in today’s challenging climateNew model: “Pay As You Go” access to the ANSYS suiteof products
  • 17. HPC Midlands Partners: E.ONE.ON New Build and Technology, Software & ModellingSample use cases:  Precipitator ductwork  Gas turbine blade lifetime  Gas turbine enclosure safety  Wind farm resource assessment  Steam flow in power plants
  • 18. HPC Midlands Partners – E.ON
  • 19. HPC Midlands Partners – E.ON
  • 20. HPC Midlands Partners – E.ON
  • 21. e-Infrastructure and JANET(UK)• JANET upgrades planned for e-Infrastructure  £26m capital investment  Potential for e.g. new primary connections / dedicated bandwidth for key research centres / instruments What would people like from JANET? Can we develop a model for JANET interconnects with industrial partners?  JANET as _peer_ not backhaul  Build on existing partnerships  Move beyond Sneakernet scenario
  • 22. HPC MidlandsBull User Group for eXtreme Computing, 2012Martin Hamilton, Centre Manager@martin_hamilton hpc-midlands.ac.uk