Iasi code camp 12 october 2013   an invitation to agile product management - iavi rotberg
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Iasi code camp 12 october 2013 an invitation to agile product management - iavi rotberg

on

  • 361 views

 

Statistics

Views

Total Views
361
Views on SlideShare
361
Embed Views
0

Actions

Likes
0
Downloads
6
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • # 1: Code that is not used by stakeholders is an inventory cost. Features shipped by year / features not used

Iasi code camp 12 october 2013 an invitation to agile product management - iavi rotberg Presentation Transcript

  • 1. Wonderla nd An invitation to Agile Product Management
  • 2. Down the rabbit hole!
  • 3.     Agile product manager Envision a product Deliver value Improve process
  • 4. Which way I go from her
  • 5. Envision a product
  • 6. Advice from a caterpill
  • 7. Big ideas      Never been done Customers smile Engineers curse Nobody except CTO thinks possible Word of mouth
  • 8. Minimum viable product    Time to market Reduce waste Mediocrity curse
  • 9. Viability ‡ Delightful    Completeness UI design Quality
  • 10. Completeness
  • 11. UI design
  • 12. Quality
  • 13. Envisioning anti patterns
  • 14. Features soup
  • 15. Analysis paralysis • If you don't agree will continue to develop requirements until you… give up!
  • 16. Too many requirement • Just to index the requirements required a pivot table
  • 17. No real customers
  • 18. Deliver value
  • 19. The pool of tears
  • 20. Don’t waste money!
  • 21. Maximize ROI
  • 22. A cat without a grin, but a grin without a cat!
  • 23. Innovation rate
  • 24. Split time
  • 25. Architectural runway
  • 26. In practice     Create opportunities Visibility, count everything Transparency, flag everything Small time boxes for improvement
  • 27. Usage index
  • 28. Are your features use 100% % of users 80% 60% 40% 20% 0% 0 2 4 6 Number of uses per period 8 10
  • 29. On product index
  • 30. Efficient vs. Effective
  • 31. Cost of context switch Percent Chart Title 100 90 80 70 60 50 40 30 20 10 0 Work time Waste 1 2 3 4 5 Number of simultaneous projects
  • 32. Improve process
  • 33. What is a caucus race?
  • 34. Your allies    Backlog Stories Release plan
  • 35. Definition of Ready     Backlog DEEP Sprint goal set Capacity known Velocity forecasted
  • 36. Definition of Done          Create technical documentation Unit testing Refactor design Bug fixing Create test cases System testing Regression testing Non-functional testing Automation testing
  • 37. A mad tea party
  • 38. Time flies Suppose it were nine o'clock, just time to begin lessons: whisper a hint to Time, and round goes the clock in a twinkling! Half-past one, time for dinner!
  • 39. In practice   Agile release train If fixed deadline, flexible requirements or vice-versa
  • 40. Before the end…