  1. 1. completed PROJECTS(July 2010-SEPTEMBER 2011)<br />By: AUREA M. PASCUAL, DM<br />City Engineer’s Office <br />September 20, 2011<br />
  2. 2. July-December 2010<br />
  3. 3. 1. Road Concreting at Nuñez Street Extension, <br />Brgy. San Isidro, G.S.C.<br /><ul><li>CONTRACTOR : SARANGANI ROCKMIXER
  4. 4. ORIGINAL CONTRACT AMOUNT : P 7,382,055.93
  5. 5. NEW CONTRACT AMOUNT : P 7,458,664.53
  6. 6. SOURCE OF FUND : AB 2008 & SB#2 2009
  7. 7. CONTRACT EFFECTIVITY : February 8, 2010
  8. 8. DURATION : 165 CD
  9. 9. EXPIRY DATE : June 7, 2010
  10. 10. NEW EXPIRY DATE : July 22, 2010
  11. 11. ACTUAL COMPLETION DATE : July 2, 1010
  12. 12. PROJECT DESCRIPTION: </li></ul> Road Concreting; works activities includes Clearing & Grubbing, Removal of structure & obstruction, Roadway excavation, Structure excavation, Embankment, Subgrade preparation, PCCP, Pipe culvert & storm drain, Manhole, Inlet, Survey Works, Billboard & Signages<br />
  13. 13. Before and after pouring of Item 311<br />
  14. 14. 2. Continuation of Road Concreting with Drainage at Mabuhay-Road, G.S.C.<br /><ul><li>CONTRACTOR : LANDROCK CONSTRUCTION
  15. 15. ORIGINAL CONTRACT AMOUNT : P 3,760,828.34
  16. 16. NEW CONTRACT AMOUNT : P 3,833,136.77
  17. 17. SOURCE OF FUND : CY 2009 AB
  18. 18. CONTRACT EFFECTIVITY : January 6, 2010
  19. 19. DURATION : 124 CD
  20. 20. EXPIRY DATE : April 5, 2010
  21. 21. NEW EXPIRY DATE : July 17, 2010
  22. 22. ACTUAL COMPLETION DATE : July 14, 2010
  23. 23. PROJECT DESCRIPTION:
  24. 24. Road concreting of 51.76 ln.m., 6.70m wide, pipes culverts & storm drain 298.05 ln.m. manhole riprap & gruted riprap 64.96 cu.m. curb & gutter 289.25 ln.m. concrete works 21.654 cu.m. </li></li></ul><li>PCCP (51.76 L.M.)<br />
  25. 25. Shoulder Protection, Curb & Gutter, Manhole & Inlet<br />
  26. 26. 3. Rehabilitation of Purok Guadalupe-Purok Nopol Farm to Market Road, Barangay Conel, G.S.C.<br /><ul><li>CONTRACTOR : LLM CONCRETE PRODUCTS
  27. 27. ORIGINAL CONTRACT AMOUNT : P 4,690,022.44
  28. 28. SOURCE OF FUND : DA SOCSKSARGEN FSP CY 2010 (80%) AND CITY OF GENERAL SANTOS (20%)
  29. 29. CONTRACT EFFECTIVITY : April 26, 2010
  30. 30. DURATION :120 CD
  31. 31. EXPIRY DATE : August 23, 2010
  32. 32. SUSPENSION ORDER : April 27, 2010
  33. 33. RESUME ORDER : June 15, 2010
  34. 34. NEW EXPIRY DATE : October 11, 2010
  35. 35. ACTUAL COMPLETION DATE : September 23, 2010
  36. 36. PROJECT DESCRIPTION: </li></ul> The work consist of Clearing & Grubbing, Cutting & Uprooting of Trees, Roadway Excavation, Structure Excavation, Embankment, Sub-Grade Preparation, Aggregate Base Course, PCSD w/ Headwall, and other Concrete Works (Wingwall, Flooring, Cut-Off Wall). <br />
  37. 37. ITEM 201<br />
  38. 38. 4. concreting of mangga street from bulaong avenue to city terminal, barangaydadiangas north, g.s.c.<br /><ul><li>CONTRACTOR : AB SALLOMAN CONSTRUCTION & SERVICES
  39. 39. ORIGINAL CONTRACT AMOUNT : P 967,260.04
  40. 40. SOURCE OF FUND : CY 2009 SB #2
  41. 41. CONTRACT EFFECTIVITY : September 17, 2010
  42. 42. DURATION : 45 CD
  43. 43. EXPIRY DATE : October 31, 2010
  44. 44. ACTUAL COMPLETION DATE : October 29, 2010
  45. 45. PROJECT DESCRIPTION:</li></ul>road concreting of 105.18ln.m. 6.7m wide.<br />
  46. 46. During concrete pouring at right lane <br />During concrete pouring at left lane<br />
  47. 47. After concrete pouring<br />
  48. 48. 5. Continuation of road concreting at purok san jose road, barangaybaluan, g.s.c.<br /><ul><li>CONTRACTOR : MJT BUILDERS
  49. 49. ORIGINAL CONTRACT AMOUNT : P 1,544,612.86
  50. 50. SOURCE OF FUND : Continuing Appropriation
  51. 51. CONTRACT EFFECTIVITY : September 17, 2010
  52. 52. DURATION : 84 CD
  53. 53. EXPIRY DATE : December 9, 2010
  54. 54. ACTUAL COMPLETION DATE : November 9, 2010
  55. 55. PROJECT DESCRIPTION:</li></ul>road concreting composed of 180ln.m. with 6.7m wide. It include roadway excavation, embankment, sub-grade preparation, aggregate base course, PCCP w/ chaplan<br />
  56. 56. AFTER POURING OF CONCRETE ON BOTH LANES & AFTER THE SHOULDERING<br />
  57. 57. 6. Construction of 1-unit Training Center at the back <br /> of City Hall, Government Center, G.S.C. <br /><ul><li>CONTRACTOR : VERGUZ Construction
  58. 58. ORIGINAL CONTRACT AMOUNT : P 290,750.00
  59. 59. NEW CONTRACT AMOUNT : P 287,487.06
  60. 60. SOURCE OF FUND : SB#2, 2009
  61. 61. CONTRACT EFFECTIVITY : March 4, 2010
  62. 62. DURATION : 45 CD
  63. 63. EXPIRY DATE : April 18, 2010
  64. 64. Suspension Order #1 : March 5, 2010
  65. 65. Resume Order # 1 : January 8, 2010
  66. 66. New Expiry Date : July 21, 2010
  67. 67. Actual Completion Date : July 21, 2010
  68. 68. PROJECT DESCRIPTION
  69. 69. consist of tile works, painting works, ramp & railings</li></li></ul><li>TILE WORKS<br />INTERIOR PAINT<br />
  70. 70. DISABLED<br />COMFORT ROOM<br />MALE<br />
  71. 71. RAMP & RAILINGS<br />
  72. 72. 7. PACKAGED PROJECT 02: Additional Railings at J. <br />Catolico Avenue, G.S.C. and Installation of Railings at <br /> Vicinity of the City Public Market, G.S.C.<br /><ul><li>CONTRACTOR : VERGUZ Construction
  73. 73. ORIGINAL CONTRACT AMOUNT : P 1,459,451.84
  74. 74. NEW CONTRACT AMOUNT : P 1,450,977.78
  75. 75. SOURCE OF FUND : CY 2009 SB#2</li></ul> : CY 2009 SB #2<br /><ul><li>CONTRACT EFFECTIVITY : March 19, 2010
  76. 76. DURATION : 120 CD
  77. 77. EXPIRY DATE : July 16, 2010
  78. 78. PARTIAL SUSPENSION : June 23, 2010
  79. 79. RESUME ORDER : July 23, 2010
  80. 80. NEW EXPIRY DATE : August 15, 2010
  81. 81. ACTUAL COMPLETION DATE : August 15, 2010
  82. 82. PROJECT DESCRIPTION :
  83. 83. Removal & existing structures 2.68 sq.m; concrete works 804 cu.m.; steel works 176.45 sq.m.; Painting works 107.64 sq.m.
  84. 84. Installation of railings @ public market and median island 110 span & other miscellaneous</li></li></ul><li>Railings at Median Island<br />
  85. 85. Railings at J. Catolico<br />
  86. 86. 8. Construction of Training Center, Government Center, G.S.C.<br /><ul><li>CONTRACTOR :FREDEN CONSTRUCTION
  87. 87. ORIGINAL CONTRACT AMOUNT : P 2,949,994.10
  88. 88. NEW CONTRACT AMOUNT : P2,950,202.11
  89. 89. SOURCE OF FUND : DA SOCKSARGENFSP CY 2009 (80%) GSC(20%)
  90. 90. CONTRACT EFFECTIVITY : December 14, 2009
  91. 91. DURATION : 130 Calendar Days
  92. 92. EXPIRY DATE : April 22, 2010
  93. 93. NEW EXPIRY DATE(due to SO #1) : May 10, 2010
  94. 94. TIME EXTENSION # 1 & 2 : 36 Calendar Days
  95. 95. NEW DURATION :166 Calendar Days
  96. 96. NEW EXPIRY DATE(due to TE #1 & 2) : June 14, 2010
  97. 97. Resume Order # 2 : July 13, 2010
  98. 98. Final Expiry Date : August 5, 2010
  99. 99. ACTUAL COMPLETION DATE : August 5, 2010
  100. 100. PROJECT DESCRIPTION:
  101. 101. Consist of clearing & grubbing, removal of existing structure, excavation , backfill, concrete works, doors & windows, ceiling works, electrical works & plumbing works. </li></li></ul><li>
  102. 102. EXTERIOR<br />DOOR & WINDOWS<br />
  103. 103. INTERIOR<br />WINDOWS<br />CR<br />
  104. 104. 9. Repair of roofing at central public <br /> market phase b, brgy. Dadiangas south, <br />g.s.c.<br /><ul><li>CONTRACTOR : KGD BUILDERS
  105. 105. ORIGINAL CONTRACT AMOUNT : P 4,863,388.98
  106. 106. NEW CONTRACT AMOUNT : P 4,870,261.56
  107. 107. SOURCE OF FUND : C7 2009 AB
  108. 108. CONTRACT EFFECTIVITY : February 5, 2010
  109. 109. DURATION : 60 CD
  110. 110. NEW DURATION : 105 CD
  111. 111. EXPIRY DATE : April 5, 2010
  112. 112. NEW EXPIRY DATE : July 6, 2010
  113. 113. ACTUAL COMPLETION DATE : September 2, 2010
  114. 114. PROJECT DESCRIPTION:
  115. 115. includes demolition works, roofing works & steel works</li></li></ul><li>AFTER REPLACEMENT OF NEW ROOFING AND NEW SKYLIGHT<br />
  116. 116. AFTER REPLACEMENT OF ROOFING AT BURNED PORTION<br />
  117. 117. AFTER REPLACEMENT OF BURNED ROOFING<br />
  118. 118. 10. Construction of Median Island along P. <br />Acharon Blvd., G.S.C. <br /><ul><li>CONTRACTOR : TRIPLE Z Merchandizing &</li></ul> Electrical Services<br /><ul><li>ORIGINAL CONTRACT AMOUNT : P 1,961,536.05
  119. 119. NEW CONTRACT AMOUNT : P 1,986,999.27
  120. 120. SOURCE OF FUND : CY 2009 SB#2
  121. 121. CONTRACT EFFECTIVITY : March 19, 2010
  122. 122. DURATION : 90 CD
  123. 123. EXPIRY DATE : June 16, 2010
  124. 124. NEW EXPIRY DATE : July 10, 2010
  125. 125. ACTUAL COMPLETION DATE : October 8, 2010
  126. 126. PROJECT DESCRIPTION :
  127. 127. Removal of structures, Excavation, Subgrade Prep., Concrete works, Masonry works,Plastering works, Painting works, Cons. Signages, Billboards</li></li></ul><li>DURING REPAINTING OF THE WALL OF MEDIAN ISLAND (WHITE PAINT)<br />
  128. 128. DURING REPAINTING THE CURB (YELLOW & BLACK)<br />AFTER<br />
  129. 129. 11. IMPROVEMENT/RENOVATION OF CITY HOSPITAL BUILDING @ GSC HOSPITAL COMPOUND GENERAL SANTOS CITY<br /><ul><li>CONTRACTOR : DAVAO CONTRACTOR’S </li></ul> DEVELOPMENT COOPERATIVE<br /><ul><li>ORIGINAL CONTRACT AMOUNT : P 13,427,457.67
  130. 130. NEW CONTRACT AMOUNT : P 14,637,110.78
  131. 131. SOURCE OF FUND : DOH Fund
  132. 132. CONTRACT EFFECTIVITY : August 15, 2009
  133. 133. DURATION : 210 CD
  134. 134. NEW DURATION : 402 CD
  135. 135. EXPIRY DATE : March 12, 2010
  136. 136. NEW EXPIRY DATE : October 20, 2010
  137. 137. ACTUAL COMPLETION DATE : December 30, 2010
  138. 138. PROJECT DESCRIPTION:</li></ul> Works consist of renovation of OPD, emergency room, x-ray room, ultra-sound room, computer room, pharmacy, observation room, doctors' rooms, and facade: includes demolition, excavation, backfill, concrete works, steel works, roofing, metal cladding, masonry works, tile works, drainage system, sub-grade preparation, aggregate base course, PCCP, curb & gutter, concrete & stamping works, steel railings, plastering, doors & windows, ceiling works, electrical works, plumbing works and septic tank <br />
  139. 139. AFTER INSTALLATION OF<br />POLYCARBONATE ROOFING<br />
  140. 140. AFTER PREPARATION OF ITEM 201<br />
  141. 141. AFTER CONCRETE <br />TOPPING @ FACADE<br />
  142. 142. EMERGENCY ROOM<br />
  143. 143. HALLWAY<br />O.P.D.<br />
  144. 144. 13. PACKAGED PROJECT 03: Completion of Covered Court, Prk. 1 Brgy. Batomelong & Completion of Covered Court (Additional Appropriation) Brgy. Batomelong, G.S.C. <br /><ul><li>CONTRACTOR : LW TEVES Construction
  145. 145. ORIGINAL CONTRACT AMOUNT : P 1,454,081.12
  146. 146. NEW CONTRACT AMOUNT : P 1,479,287.82
  147. 147. SOURCE OF FUND : Continuing Appropriation
  148. 148. CONTRACT EFFECTIVITY : September 24, 2010
  149. 149. DURATION : 103 CD
  150. 150. EXPIRY DATE : January 01, 2011
  151. 151. NEW EXPIRY DATE : January 04, 2011
  152. 152. ACTUAL COMPLETION DATE : December 30, 2010
  153. 153. PROJECT DESCRIPTION :
  154. 154. excavation works, concrete works, roofing works, electrical works & billboard
  155. 155. steel works & roofing works</li></li></ul><li> AFTER POURING<br />
  156. 156. DURING PLASTERING<br />DURING FABRICATION OF RAILING<br />INSTALLATION OF RAILINGS<br />
  157. 157. INSTALLATION OF CANOPY, PURLINS AND ROOFING<br />
  158. 158. 14. PROPOSED drainage AT NUñEZ STREET, BRGY. SAN ISIDRO, G.S.C<br /><ul><li>CONTRACTOR : RSP ENTERPRISES INC.
  159. 159. ORIGINAL CONTRACT AMOUNT : P 1,745,493.88
  160. 160. NEW CONTRACT AMOUNT : P 1,741,481.36
  161. 161. SOURCE OF FUND : SB #2 CY 2009
  162. 162. CONTRACT EFFECTIVITY : SEPT. 3, 2010
  163. 163. DURATION : 90 CD
  164. 164. EXPIRY DATE : DEC. 1, 2010
  165. 165. ACTUAL COMPLETION DATE : November 30, 2010
  166. 166. BRIEF DESCRIPTION:</li></ul>It includes clearing & grubbing, removal of structures & obstruction (concrete pav’t & chaplan ) structure excavation, embankment, aggregate base course, inst. of 600mmØRCCP(300 ln.m.), 10 units manhole, curb & gutter and other misc. items affected by the project.<br />
  167. 167. START OF PROJECT <br /> STA. 0 + 000<br />AFTER<br />END OF PROJECT <br /> STA. 0 + 300<br />
  168. 168. AFTER<br />
  169. 169. AFTER<br />
  170. 170. AFTER<br />
  171. 171. January-September 2011<br />
  172. 172. 1. PROPOSED SIDEWALK WITH STREETLIGHTS AT <br /> GOVERNMENT CENTER, G.S.C.<br /><ul><li>CONTRACTOR : T-Square Builders
  173. 173. ORIGINAL CONTRACT AMOUNT : P 7,971,226.00
  174. 174. NEW CONTRACT AMOUNT : P 7,518,219.31
  175. 175. SOURCE OF FUND : SB # 4 CY 2009
  176. 176. CONTRACT EFFECTIVITY : June 29, 2010
  177. 177. DURATION :180 CD
  178. 178. EXPIRY DATE : September 26, 2010
  179. 179. NEW EXPIRY DATE : December 25, 2010
  180. 180. ACTUAL COMPLETION DATE : January 31, 2011
  181. 181. PROJECT DESCRIPTION: </li></ul> Proposed Sidewalk with Streetlights at Gov’t Center, it includes removal of existing conc. structures, replacement of conc. Sidewalk into paver bricks, curb & gutter, planters, lamp posts, electrical fixtures and other misc. item affected by the project<br />
  182. 182. Along Pendatun Ave.<br />Along City Hall Drive<br />Along DatuMatalam Road<br />Along Roxas Ave<br />
  183. 183. Infront of City Hall<br />Metering Pole/Control Cabinet<br />PNP Landmark<br />
  184. 184. 2. CONTINUATION OF ROAD CONCRETING (Partial) <br /> CABUAY TO SINAWAL PROPER, BRGY. Sinawal, G.S.C.<br /><ul><li>CONTRACTOR : KGD BUILDERS
  185. 185. ORIGINAL CONTRACT AMOUNT : P 1,329588.44
  186. 186. SOURCE OF FUND : AB 2007
  187. 187. CONTRACT EFFECTIVITY : November 4, 2010
  188. 188. DURATION : 97 CD
  189. 189. EXPIRY DATE : January 17, 2011
  190. 190. NEW EXPIRY DATE : February 8, 2011
  191. 191. ACTUAL COMPLETION DATE : February 8, 2011
  192. 192. PROJECT DESCRIPTION:</li></ul>Road Concreting composed of 206.10 ln.m. with 5.0 meter wide. It include roadway excavation, embankment, subgrade preparation, item 201 & item 311.<br />
  193. 193. Before<br />After<br />
  194. 194. 3. Concreting of narangita street from <br />quirino street to seÑoradelapaz, g.s.c.<br /><ul><li>CONTRACTOR : RSP ENTERPRISES, Inc.
  195. 195. ORIGINAL CONTRACT AMOUNT : P 1,733,635.68
  196. 196. NEW CONTRACT AMOUNT : P 1,727,815.55
  197. 197. SOURCE OF FUND : CY 2010 AB
  198. 198. CONTRACT EFFECTIVITY : January 10, 2011
  199. 199. DURATION : 57 CD
  200. 200. EXPIRY DATE : March 7, 2011
  201. 201. ACTUAL COMPLETION DATE : March 7, 2011
  202. 202. PROJECT DESCRIPTION:</li></ul>Road concreting of 217.10 ln.m, Roadway Excavation 754.13 cu.m<br />Sub-grade Preparation 1,876.39 sq.m, Aggregate Base Course 550.00 <br />Cu.m, Portland Cement Concrete Pavement 1,447.69 sq.m<br />
  203. 203. START OF PROJECT <br />Sta. 0 + 000<br />END OF PROJECT <br />Sta. 0 + 217.10<br />AFTER<br />
  204. 204. 4. Road Concreting at Purok 1, Carmona Street, <br />BarangayTinagacan, G.S.C.<br /><ul><li>CONTRACTOR : SALLOMAN Eng’g. Services
  205. 205. ORIGINAL CONTRACT AMOUNT : P 483,139.82
  206. 206. SOURCE OF FUND : CY 2010 AB
  207. 207. CONTRACT EFFECTIVITY : February 14, 2011
  208. 208. DURATION : 32 CD
  209. 209. EXPIRY DATE : March 17, 2011
  210. 210. ACTUAL COMPLETION DATE : April 26, 2011
  211. 211. PROJECT DESCRIPTION:</li></ul> consist of 68ln.m. PCCP, 5.00m wide<br />
  212. 212. DURING POURING OF 311<br />AFTER POURING OF 311<br />
  213. 213. 5. REHABILITATION/WIDENING OF GOLDEN PLAINS – <br /> PUROK BLEL FARM TO MARKET ROAD, BRGY. <br /> SINAWAL, GENERAL SANTOS CITY<br /><ul><li>CONTRACTOR : FREDEN CONSTRUCTION
  214. 214. ORIGINAL CONTRACT AMOUNT : P 5,957,897.49
  215. 215. NEW CONTRACT AMOUNT : P 6,553,210.11
  216. 216. SOURCE OF FUND :DA SOCSKSARGEN FSP CY 2010 </li></ul>(80%) and City of General Santos<br /> (20%)<br /><ul><li>CONTRACT EFFECTIVITY : August 31, 2010
  217. 217. DURATION : 180 CD
  218. 218. NEW DURATION : 210 CD
  219. 219. EXPIRY DATE : February 26, 2011
  220. 220. SUSPENSION ORDER : September 2, 2010
  221. 221. RESUME ORDER : November 22, 2010
  222. 222. NEW EXPIRY DATE : June 18, 2011
  223. 223. ACTUAL COMPLETION DATE : May 26, 2011
  224. 224. PROJECT DESCRIPTION:</li></ul>Road Rehabilitation/Widening of Farm to Market Road with 8 meter width and 5,620 meter length, and Final Grade consist of <br /> Aggregate Base Course. Additional Works consists of Triple Barrel Culvert with PCCP, Concrete Works, and Stone Masonry protection.<br />
  225. 225. ITEM 201<br />HUMP<br />HUMP<br />
  226. 226. TRIPLE BARREL OVERFLOW <br />CULVERT STRUCTURE<br />
  227. 227. 6. CONTINUATION OF ROAD Concreting along <br />lagao-conel road, G.S.C.<br /><ul><li>CONTRACTOR : SARANGANI ROCKMIXER
  228. 228. ORIGINAL CONTRACT AMOUNT : P 4,829,166.82
  229. 229. NEW CONTRACT AMOUNT : P 4,854,597.18
  230. 230. NEW CONTRACT AMOUNT : P 4,854,597.18
  231. 231. CONTRACT EFFECTIVITY : January 10, 2011
  232. 232. DURATION : 140 CD
  233. 233. EXPIRY DATE : May 29, 2011
  234. 234. ACTUAL COMPLETION DATE : May 29, 2011
  235. 235. PROJECT DESCRIPTION:</li></ul>composed of 400 ln.m., 6.70m wide with slope protection<br />
  236. 236. AFTER<br />
  237. 237. AFTER<br />
  238. 238. 7. CONTINUATION OF ROAD Concreting WITH <br /> DRAINAGE ALONG FERNANDEZ STREET, LAGAO, <br /> g.s.c.<br /><ul><li>CONTRACTOR : N. CONGSON CONSTRUCTION </li></ul> & SUPPLY<br /><ul><li>ORIGINAL CONTRACT AMOUNT : P4,793,348.41
  239. 239. SOURCE OF FUND : CY 2010 AB
  240. 240. CONTRACT EFFECTIVITY : January 10, 2011
  241. 241. DURATION : 100 CD
  242. 242. EXPIRY DATE : April 19, 2011
  243. 243. ACTUAL COMPLETION DATE : May 23, 2011
  244. 244. PROJECT DESCRIPTION:</li></ul> Road concreting of 279.25 ln.m., Drainage Construction of 209 ln.m. with 2 units Crossdrains consisting of 20 ln.m., and 4 units Manhole.<br />
  245. 245. PCCP COMPLETED FROM <br />STA. 0+700.00 TO STA. 0+979.25<br />
  246. 246. MANHOLE INLET & CATCH BASIN<br />HEADWALL<br />
  247. 247. 8. Construction of Additional Lane along Quezon <br /> Avenue (additional appropriation), Brgy. <br /> Dadiangas West & Brgy. Dadiangas North, G.S.C.<br /><ul><li>CONTRACTOR : MJT Builders
  248. 248. ORIGINAL CONTRACT AMOUNT : P 7,819,937.56
  249. 249. NEW CONTRACT AMOUNT : P 7,844,366.84
  250. 250. SOURCE OF FUND : CY 2010 AB
  251. 251. CONTRACT EFFECTIVITY : February 14, 2011
  252. 252. DURATION : 103 CD
  253. 253. NEW DURATION : 113 CD
  254. 254. EXPIRY DATE : May 29, 2011
  255. 255. NEW EXPIRY DATE : June 6, 2011
  256. 256. ACTUAL COMPLETION DATE : May 24, 2011
  257. 257. PROJECT DESCRIPTION:</li></ul> consist of 715.8 ln.m PCCP includes Roadway Excavation,StructureExcavation,Embankment,Overhaul,Sub-grade Preparation,Aggregate Base Course,Pipe Culvert & Storm Drains,Manhole-Inlets & Catch Basin,RetrofittingWorks,Billboards and Construction Signages<br />
  258. 258. AFTER<br />
  259. 259. AFTER<br />
  260. 260. 9. Road Concreting of Cahilsot St. (fronting <br />Cahilsot E/S and RomanaAcharon E/S), Brgy. <br />Calumpang, G.S.C.<br /><ul><li>CONTRACTOR : J.G. ORANZA Construction
  261. 261. ORIGINAL CONTRACT AMOUNT : P 3,169,076.96
  262. 262. NEW CONTRACT AMOUNT : P 3,299,967.00
  263. 263. SOURCE OF FUND : CY 2010 AB
  264. 264. CONTRACT EFFECTIVITY : February 14, 2011
  265. 265. DURATION : 60 CD
  266. 266. EXPIRY DATE : April 14, 2011
  267. 267. NEW EXPIRY DATE : May 11, 2011
  268. 268. ACTUAL COMPLETION DATE : May 3, 2011
  269. 269. PROJECT DESCRIPTION:</li></ul>consist of 360 ln.m. PCCP (6.7m wide) 9 ln.m. - 24"Ø RCCP <br /> (cross drain)<br />
  270. 270. AFTER POURING OF PCCP<br />
  271. 271. AFTER RIPRAP & <br />GROUTED RIPRAP<br />
  272. 272. 10. Completion of Road Concreting at Darimco<br /> Street, Dadiangas West, G.S.C.<br /><ul><li>CONTRACTOR : MJT Builders
  273. 273. ORIGINAL CONTRACT AMOUNT : P 568,931.80
  274. 274. NEW CONTRACT AMOUNT : P 625,646.88
  275. 275. SOURCE OF FUND : CY 2010 AB
  276. 276. CONTRACT EFFECTIVITY : April 25, 2011
  277. 277. DURATION : 40 CD
  278. 278. NEW DURATION : 45 CD
  279. 279. EXPIRY DATE : June 3, 2011
  280. 280. NEW EXPIRY DATE : June 8, 2011
  281. 281. ACTUAL COMPLETION DATE : May 27, 2011
  282. 282. PROJECT DESCRIPTION: </li></ul> 53ln.m., 3.35m wide pccp<br />
  283. 283. AFTER<br />
  284. 284. 11. Extension of the rehabilitation/widening of <br /> golden plains-prk. Blel, fmr, brgy. sinawal<br /> G.S.C.<br /><ul><li>CONTRACTOR : FREDEN Construction
  285. 285. ORIGINAL CONTRACT AMOUNT : P 833,263.23
  286. 286. NEW CONTRACT AMOUNT : P 823,767.73
  287. 287. SOURCE OF FUND : DA SOCSKSARGEN FSP CY </li></ul> 2010 (80%) and City of General<br /> Santos (20%)<br /><ul><li>CONTRACT EFFECTIVITY : May 13, 2011
  288. 288. DURATION : 120 CD
  289. 289. EXPIRY DATE : September 9, 2011
  290. 290. ACTUAL COMPLETION DATE : July 20, 2011
  291. 291. PROJECT DESCRIPTION:
  292. 292. Rehabilitation of 840 ln.m. FMR with Item 201 as Final Grade.</li></li></ul><li>Item 105 ( After )<br />Item 105 ( Before )<br />
  293. 293. Item 201 (During Preparation)<br />
  294. 294. Item 201 <br />(Placing of Humps)<br />
  295. 295. Item 201 <br />(After)<br />
  296. 296. 12. Continuation of Road Concreting at <br />Dadiangas-Mabuhay Road, Brgy. San Isidro, <br /> G.S.C.<br /><ul><li>CONTRACTOR : KGD Builders
  297. 297. ORIGINAL CONTRACT AMOUNT : P 4,802,446.20
  298. 298. NEW CONTRACT AMOUNT : P 4,998,500.84
  299. 299. SOURCE OF FUND : CY 2010 AB
  300. 300. CONTRACT EFFECTIVITY : February 14, 2011
  301. 301. DURATION : 164 CD
  302. 302. EXPIRY DATE : June 8, 2011
  303. 303. SUSPENSION ORDER #01 : February 24, 2011
  304. 304. RESUME ORDER #01 : March 06, 2011
  305. 305. SUSPENSION ORDER #2 : May 26, 2011
  306. 306. RESUME ORDER #2 : May 31, 2011
  307. 307. SUSPENSION ORDER #3 : disapproved
  308. 308. SUSPENSION ORDER #4 : June 4, 2011
  309. 309. RESUME ORDER #4 : June 7, 2011
  310. 310. SUSPENSION ORDER #5 : June 11, 2011
  311. 311. RESUME ORDER #5 : June 14, 2011
  312. 312. TIME EXTENSION #1 :19 Calendar days
  313. 313. Time Extension #2 : 12 Calendar days
  314. 314. Time Extension #3 : 8 Calendar days
  315. 315. NEW EXPIRY DATE : August 17, 2011
  316. 316. ACTUAL COMPLETION DATE : August 17, 2011
  317. 317. PROJECT DESCRIPTION:</li></ul>consist of 389.00 ln.m. PCCP, 6.70m wide.<br />
  318. 318. DURING POURING OF ITEM 311<br />LEFT LANE<br />
  319. 319. 13. INSTALLATION OF TRAFFIC SIGNAL SYSTEM WITH <br /> INTERSECTION RECONFIGURATION AT JUNCTION <br /> NATIONAL HIGHWAY-LABANGAL ROAD AND <br /> NATIONAL HIGHway-g. misast.-bula-lagao<br /> road, g.s.c.<br /><ul><li>CONTRACTOR : GOSSET BUILDERS, Inc.
  320. 320. ORIGINAL CONTRACT AMOUNT : P21,261,962.28
  321. 321. NEW CONTRACT AMOUNT : P21,330,382.94 (subject to approval)
  322. 322. SOURCE OF FUND : CY 2009 AB & SB#2
  323. 323. CONTRACT EFFECTIVITY : January 10, 2011
  324. 324. DURATION : 120 Calendar Days
  325. 325. EXPIRY DATE : May 9, 2011
  326. 326. AFTER SEVERAL SUSPENSION ORDERS, RESUME ORDERS, TIME EXTENSIONS, AND VARIATION ORDERS,
  327. 327. NEW EXPIRY DATE : August 28, 2011
  328. 328. ACTUAL COMPLETION DATE : September 13, 2011
  329. 329. PROJECT DESCRIPTION:</li></ul>2 intersections Traffic Signals, RCCP, Curb & Gutter, Manholes, Sidewalk, Sub-grade preparation, Item 201 & Item 311, Road Signs & Thermoplastic<br />
  330. 330. MAKAR<br />
  331. 331. ROBINSON<br />
  332. 332. ROBINSON<br />
  333. 333. 14. CONSTRUCTION OF ADDITIONAL LANES AT QUIRINO<br /> AVENUE,DADIANGAS EAST AND DADIANGAS SOUTH<br /> (ADDITIONAL APPROPRIATION), GENERAL SANTOS CITY<br /><ul><li>CONTRACTOR : PASE Construction
  334. 334. ORIGINAL CONTRACT AMOUNT : P 4,322,951.39
  335. 335. SOURCE OF FUND : AB 2009
  336. 336. CONTRACT EFFECTIVITY : July 15, 2011
  337. 337. DURATION : 150 CD
  338. 338. NEW DURATION : 155 cd
  339. 339. EXPIRY DATE : December 11, 2011
  340. 340. NEW EXPIRY DATE : December 16, 2011
  341. 341. ACTUAL COMPLETION DATE : September 12, 2011
  342. 342. PROJECT DESCRIPTION:
  343. 343. Road Concreting composed of 414.65 ln.m, 6.7m wide, with concreting of shoulder composed of 158.075 ln.m, 1.5m wide</li></ul> both sides.<br />
  344. 344. Corner Narangita St.<br />
  345. 345. Corner Lapu-lapu St.<br />
  346. 346. Corner Laurel Avenue<br />
  347. 347. 15. RENOVATION OF BIR OFFICE BUILDING, BARANGAY <br /> DADIANGAS EAST, G.S.C. <br /><ul><li>CONTRACTOR : MJT BUILDERS
  348. 348. ORIGINAL CONTRACT AMOUNT : P 353,681.60
  349. 349. NEW CONTRACT AMOUNT : P 389,031.74
  350. 350. SOURCE OF FUND : LDF SB#1, 2009
  351. 351. CONTRACT EFFECTIVITY : March 25, 2010
  352. 352. DURATION : 45 CD
  353. 353. EXPIRY DATE : May 8, 2010
  354. 354. SUSPENSION ORDER #1 : March 26, 2010
  355. 355. RESUME ORDER #1 : November 8, 2010
  356. 356. NEW EXPIRY DATE : January 10, 2011
  357. 357. ACTUAL COMPLETION DATE : January 10, 2011
  358. 358. PROJECT DESCRIPTION :
  359. 359. Renovation of BIR Office Building which includes Demolition Works, Masonry Works, Plastering (Smooth Plastered Finish), Concrete Works (Overlay), Pebble Washout Finish, Doors and Windows, Carpentry Works, Painting Works, Electrical Works, and Billboard.</li></li></ul><li>SHELVES AT ROOM A<br />
  360. 360. SHELVES AT ROOM B<br />
  361. 361. SHELVES AT ROOM C<br />
  362. 362. 16. RENOVATION OF BARANGAY HEALTH CENTER, LAUREL <br /> AVENUE, DADIANGAS NORTH, G.S.C.<br /><ul><li>CONTRACTOR : HANNA VIA Design and</li></ul> Construction<br /><ul><li>ORIGINAL CONTRACT AMOUNT : P 487,882.81
  363. 363. NEW CONTRACT AMOUNT : P 495,577.81
  364. 364. SOURCE OF FUND : CY 2010 AB
  365. 365. CONTRACT EFFECTIVITY : January 10, 2011
  366. 366. DURATION : 50 CD
  367. 367. EXPIRY DATE : February 28, 2011
  368. 368. NEW EXPIRY DATE : March 5, 2011
  369. 369. ACTUAL COMPLETION DATE : March 2, 2011
  370. 370. PROJECT DESCRIPTION : </li></ul> consist of demolition works, excavation/backfill, concrete works, plastering, ceiling works, doors & windows, tile works, electrical & plumbing.<br />
  371. 371. Before<br />After<br />
  372. 372. Breastfeeding and playing room<br />Dental room<br />
  373. 373. Pre-natal/family planning room<br />
  374. 374. 17. CONCRETING AND LANDSCAPING INFRONT OF <br /> BARANGAY HALL, BARANGAY BAWING, G.S.C.<br /><ul><li>CONTRACTOR : A.L. ACHARON Construction </li></ul> and Supply<br /><ul><li>ORIGINAL CONTRACT AMOUNT : P 474,473.42
  375. 375. NEW CONTRACT AMOUNT : P 499,711.87
  376. 376. SOURCE OF FUND : CY 2009 AB
  377. 377. CONTRACT EFFECTIVITY : January 10, 2011
  378. 378. DURATION : 60 CD
  379. 379. EXPIRY DATE : March 10, 2011
  380. 380. NEW DURATION : 71 CD
  381. 381. NEW EXPIRY DATE : March 21, 2011
  382. 382. ACTUAL COMPLETION DATE : March 21, 2011
  383. 383. PROJECT DESCRIPTION : </li></ul> consist of clearing and grubbing, sub-grade preparation, aggregate base course, manholes, inlets & catch basin, excavation, backfill, concrete stamping, masonry & plastering works.<br />
  384. 384. A F T E R<br />
  385. 385. 18. Construction of Day care center (additional <br /> appropriation) Brgy. Dadiangas east, g.s.c.<br /><ul><li>CONTRACTOR : MJT Builders
  386. 386. ORIGINAL CONTRACT AMOUNT : P 481,200.00
  387. 387. NEW CONTRACT AMOUNT : P 488,516.30
  388. 388. SOURCE OF FUND : CY 2010 AB
  389. 389. CONTRACT EFFECTIVITY : February 14, 2010
  390. 390. DURATION : 30 CD
  391. 391. EXPIRY DATE : March 15, 2011
  392. 392. NEW EXPIRY DATE : March 20, 2011
  393. 393. ACTUAL COMPLETION DATE : March 20, 2011
  394. 394. PROJECT DESCRIPTION :</li></ul> Include tile works, painting works, roofing works, steel works & electrical works.<br />
  395. 395. BEFORE<br />
  396. 396. AFTER<br />
  397. 397. 19. Improvement of Oval Covered Court, General <br /> Santos City<br /><ul><li>CONTRACTOR : VERGUZ Construction
  398. 398. ORIGINAL CONTRACT AMOUNT : P 1,113,700.63
  399. 399. NEW CONTRACT AMOUNT : P 1,199,219.28
  400. 400. SOURCE OF FUND : Trust Fund Account of PDAF </li></ul> (SARO# 09-05310) <br /><ul><li>CONTRACT EFFECTIVITY : February 4, 2010
  401. 401. DURATION : 50 CD
  402. 402. EXPIRY DATE : March 25, 2011
  403. 403. NEW EXPIRY DATE : April 4, 2011
  404. 404. ACTUAL COMPLETION DATE : April 26, 2011
  405. 405. PROJECT DESCRIPTION :</li></ul> the work consists of improvement of Covered Court approx. 45% of the total building which includes steel works, concrete, masonry and painting<br />
  406. 406. After<br />
  407. 407.
  408. 408. 20. Proposed Post Harvest Facility at Purok 14, <br /> Brgy. Katangawan, G.S.C.<br /><ul><li>CONTRACTOR : LAWRENCE ERIC Construction </li></ul> & Engineering Services<br /><ul><li>ORIGINAL CONTRACT AMOUNT : P 1,929,839.33
  409. 409. NEW CONTRACT AMOUNT : P 1,985,052.37
  410. 410. SOURCE OF FUND : CY 2009 SB#2
  411. 411. CONTRACT EFFECTIVITY : February 10, 2010
  412. 412. DURATION : 90 CD
  413. 413. EXPIRY DATE : May 10, 2011
  414. 414. NEW EXPIRY DATE : May 31, 2011
  415. 415. ACTUAL COMPLETION DATE : May 31, 2011
  416. 416. PROJECT DESCRIPTION :</li></ul> removal of structure & obstruction, excavation works, backfill works, <br /> concrete works, truss works, masonry works, roofing works, steel works, electrical works and billboards.<br />
  417. 417. After<br />
  418. 418. After<br />
  419. 419. 21. Proposed Repair/Improvement and <br /> Rehabilitation of Public Phase A & B, G.S.C.<br /><ul><li>CONTRACTOR : HANNA VIA DESIGN & </li></ul> CONSTRUCTION<br /><ul><li>ORIGINAL CONTRACT AMOUNT : P 243,836.07
  420. 420. SOURCE OF FUND : CY 2008 SB#3
  421. 421. CONTRACT EFFECTIVITY : April 27, 2011
  422. 422. DURATION : 25 CD
  423. 423. EXPIRY DATE : May 21, 2011
  424. 424. ACTUAL COMPLETION DATE : May 21, 2011
  425. 425. PROJECT DESCRIPTION :</li></ul> consist of painting works, carpentry works, tileworks, scaffolding, masonry works, plumbing & electrical works.<br />
  426. 426. After<br />
  427. 427. After<br />
  428. 428. After<br />
  429. 429. After<br />
  430. 430. 22. DEVELOPMENT OF PUBLIC CEMETERY PUBLIC <br /> BARANGAY FATIMA, G.S.C.<br /><ul><li>CONTRACTOR : FREDEN Construction
  431. 431. ORIGINAL CONTRACT AMOUNT : P 4,333,879.20
  432. 432. NEW CONTRACT AMOUNT : P 4,471,221.84
  433. 433. SOURCE OF FUND : CY 2009 SB#2
  434. 434. CONTRACT EFFECTIVITY : September 30, 2010
  435. 435. EXPIRY DATE : January 2, 2011
  436. 436. DURATION : 95 CD
  437. 437. NEW DURATION : 141 CD
  438. 438. SUSPENSION ORDER #1 : September 30, 2010
  439. 439. RESUME ORDER #1 : January 25, 2011
  440. 440. NEW EXPIRY DATE : June 14, 2011
  441. 441. ACTUAL COMPLETION DATE : June 14, 2011
  442. 442. PROJECT DESCRIPTION : </li></ul>works consist of excavation, earthfill, embankment, concrete <br />works, masonry works, plastering works and steel works.<br />
  443. 443. Existing Billboard<br />
  444. 444. Common Bone Chamber<br />5-Layer Bone Chamber<br />
  445. 445. 23. Construction of Covered Court (Additional <br /> Appropriation), BarangayTambler, G.S.C.<br /><ul><li>CONTRACTOR : VERGUZ CONSTRUCTION
  446. 446. ORIGINAL CONTRACT AMOUNT : P 479,391.84
  447. 447. SOURCE OF FUND : CY 2010 AB
  448. 448. CONTRACT EFFECTIVITY : April 27, 2011
  449. 449. EXPIRY DATE : June 10, 2011
  450. 450. DURATION : 45 CD
  451. 451. SUSPENDED : May 4, 2011
  452. 452. RESUME ORDER : May 10, 2011
  453. 453. NEW EXPIRY DATE : June 16, 2011
  454. 454. ACTUAL COMPLETION DATE : June 16, 2011
  455. 455. PROJECT DESCRIPTION :</li></ul> composed of demolition, excavation,Backfill/ earthfill, concrete works, Steel works and Roofing works.<br />
  456. 456. Steel Works<br />After<br />Before<br />Installation of Steel Post <br />Truss , Purlins and Roofing Works<br />
  457. 457. Steel Works<br />After<br />Before<br />Installation of Steel Post <br />
  458. 458. 24. PACKAGED PROJECT: Land improvement (Restoration of Fence) Brgy. Baluan, g.s.c. and renovation of health center @ Brgy. Hall compound & prk. Sarifmucsinbrgy. Baluan, g.s.c.<br /><ul><li>CONTRACTOR : HANNA VIA DESIGN & </li></ul> CONSTRUCTION<br /><ul><li>ORIGINAL CONTRACT AMOUNT : P 647,562.97
  459. 459. NEW CONTRACT AMOUNT : P 687,546.62
  460. 460. SOURCE OF FUND : CY 2009 SB#3 & CY 2010 AB
  461. 461. CONTRACT EFFECTIVITY : April 27, 2011
  462. 462. DURATION : 90 CD
  463. 463. EXPIRY DATE : July 15, 2011
  464. 464. NEW EXPIRY DATE : July 25, 2011
  465. 465. ACTUAL COMPLETION DATE : July 25, 2011
  466. 466. PROJECT DESCRIPTION :</li></ul> work consist of concrete masonry works & steel works. Works consist of concrete work, masonry works, roofing works, steel works & electrical works.<br />
  467. 467. AFTER TILEWORKS @ HEALTH CENTER<br />
  468. 468. HEALTH CENTER<br />DURING INSTALLATION OF FLASHING, JALOUSIE WINDOW AND STEEL WINDOW GRILLS<br />WOODEN PARTITION<br />
  469. 469. 25. Renovation of office building (city admin <br /> office) city hall, g.s.c.<br /><ul><li>CONTRACTOR : HANNA VIA DESIGN & </li></ul> CONSTRUCTION<br /><ul><li>ORIGINAL CONTRACT AMOUNT : P 1,463,541.31
  470. 470. NEW CONTRACT AMOUNT : P 1,499,372.03
  471. 471. SOURCE OF FUND : SB#2 2010, SB#4 2010 & </li></ul> SB#5 2010<br /><ul><li>CONTRACT EFFECTIVITY : April 27, 2011
  472. 472. DURATION : 82 CD
  473. 473. EXPIRY DATE : June 7, 2011
  474. 474. NEW EXPIRY DATE : July 17, 2011
  475. 475. ACTUAL COMPLETION DATE : July 17, 2011
  476. 476. PROJECT DESCRIPTION :</li></ul> composed of demolition, earth works, concrete works, masonry works, plastering, ceiling works, painting works, doors & windows, tile works, steel works & electrical works.<br />
  477. 477. After<br />After<br />
  478. 478. After<br />After<br />
  479. 479. 26. Office Building (Renovation of City Accountant Office), G.S.C. <br /><ul><li>CONTRACTOR : AB VISION Engineering Const
  480. 480. ORIGINAL CONTRACT AMOUNT : P 4,709,558.29
  481. 481. NEW CONTRACT AMOUNT : P 4,799,948.83
  482. 482. SOURCE OF FUND : Continuing Approp. CY 2010 AB
  483. 483. CONTRACT EFFECTIVITY : February 28, 2011
  484. 484. DURATION : 90 CD
  485. 485. NEW DURATION : 133 CD
  486. 486. EXPIRY DATE : April 28, 2011
  487. 487. SUSPENSION ORDER #1 : March 14, 2011
  488. 488. RESUME ORDER #1 : April 18, 2011
  489. 489. TIME EXTENSION #1 : 4 CD
  490. 490. TIME EXTENSION #2 : 14 CD
  491. 491. TIME EXTENSION #3 : 10 CD
  492. 492. VARIATION ORDER #1 : 0 CD
  493. 493. VARIATION ORDER #2 : 15 CD
  494. 494. NEW EXPIRY DATE : August 14, 2011
  495. 495. ACTUAL COMPLETION DATE : August 31, 2011
  496. 496. PROJECT DESCRIPTION :</li></ul>Includes replacement of wall partitions and floor tiles, repair of ceiling, glass works, Office Furnitures such as tables, Painting works, Electrical lightings and Fixtures, computer/airconditioned outlets & other miscellaneous items affected by the project<br />
  497. 497. CITY ACCOUNTANT OFFICE<br />
  498. 498. CITY HOUSING & LAND MANAGEMENT OFFICE<br />
  499. 499. 27. Construction of drainage AT BULAONG AVE. <br /> EXT. TO SARANGANI BAY OUTFALL, BRGY. WEST, G.S.C<br /><ul><li>CONTRACTOR : JARGON CONSTRUCTION
  500. 500. ORIGINAL CONTRACT AMOUNT : P 2,999,058.50
  501. 501. NEW CONTRACT AMOUNT : P 2,959,608.53
  502. 502. SOURCE OF FUND : SB #1 CY 2007
  503. 503. CONTRACT EFFECTIVITY : December 9, 2008
  504. 504. DURATION : 90 CD
  505. 505. NEW DURATION : 213 CD
  506. 506. EXPIRY DATE : March 8, 2009
  507. 507. Suspension Order#01 : January 26, 2009
  508. 508. Completion of Items of Work not affected by Abejaron’s claim: August 7, 2009
  509. 509. Resume Order #01 : February 4, 2011
  510. 510. NEW EXPIRY DATE : March 10, 2011
  511. 511. ACTUAL COMPLETION DATE : March 4, 2011
  512. 512. BRIEF DESCRIPTION:</li></ul> It includes clearing & grubbing, removal of structures & obstruction (concrete pav’t & riprap, existing manholes & RCCP, chip-off of manholes) structure excavation, embankment, agg. base course, struct. conc., masonry & plastering works, inst. of 1200mmØ RCCP (108 ln.m), 900mm Ø RCCP (45 ln.m), 300mmØRCCP (12 ln.m), 6 units manhole, stone masonry, curb & gutter and other misc. items affected by the project.<br />
  513. 513. AFTER<br />

×