Lean Product Development at Discovery Communications: Methodology, Practices, Terminology

777

Published on

Select material used during product development orientation.

Select material used during product development orientation.

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
777
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Lean/Agile Product DevelopmentMethodology, Practices, Terminology 1
  • 2. Session Goals• Raise awareness within the team of Lean-Agile Product Development methodology fundamentals, practices, and terminology.• Provide a common starting point for discussion of how we will work day to day: Processes, Practices, and Tools.• Encourage further learning by individuals and their teams. 2
  • 3. Methodology Fundamentals 3
  • 4. What is Agile Development?Agile development is a group of software development methodologies,including Lean-Agile, based on adaptive planning, and iterative and incrementaldevelopment, where requirements and solutions evolve concurrently throughcollaboration between self-organizing, cross-functional teams.Core Agile Values: • Individuals and interactions over processes and tools • Working software over comprehensive documentation • Customer collaboration over contract negotiation • Responding to change over following a plan While there is value in the items on the right, we value the items on the left more. 4
  • 5. Introducing Lean-Agile Product DevelopmentA disciplined end-to-end Product Development methodology, with Agile valuesand practices infused with “Lean Thinking”, that helps an organization achieverapid and reliable delivery of value, with an emphasis on continuous learningand improvement.Principles: Eliminate Waste: spend time only on what adds real customer value; remove demands on capacity that do not add value. Amplify Learning: build knowledge; when you have tough problems or uncertainty, increase feedback to improve. “Fail fast, fail cheap”. Defer Commitment: keep your options open as long as practical, but no longer. Deliver as Fast as Possible: deliver value to customers as soon as they ask for it; automate or remove impediments to rapid delivery. 5
  • 6. Lean-Agile Principles (cont.) Trust and Empower the Team: let the people who add value use their full potential to meet the business challenges. Build Quality In: don’t try to tack on quality after the fact; More testing, less debugging. Systems-Thinking to “See the Whole”: resist the temptation to optimize parts at the expense of the whole. Look at entire system’s value flow. Technical Excellence: an adaptive low-dependency architecture and quality code through test driven development are mandatory to sustain rapid and reliable delivery. 6
  • 7. Lean-Agile is AdaptiveTraditional Approach is Prescriptive: a plan is acommitment• Beak project into identifiable work products that are defined and built to meet specific fixed goals.• Carefully plan and then controlled to meet that plan.Lean-Agile is Adaptive: planning is indispensablebut plans are useless• Look at the whole system’s ability to deliver value rather than focusing on optimizing and delivering individual parts.• Value learning effectively through feedback and testing and empower the people who do the work. 7
  • 8. Lean-Agile is ConcurrentTraditional Approach: deliverables are "tossed over the wall" from department todepartment which results in lost information, defects, delays, and lower valueoutcomes.Lean-Agile Approach: tasks are integrated to reduce the elapsed time required tobring a new product to the market by minimizes the inefficiency and defects thatarise from hand-offs. 8
  • 9. Lean-Agile is Hard to Do• There is no easy way, no "free lunch” – you must do the hard parts.• Need to have strong engineering practices, high-bandwidth communication, concurrent product development, continuous process improvement, motivated cross-functional teams, and engaged Product Owner.• Backsliding into old ways is easy: success requires sustained commitment from all levels of the organization.• Worth the effort - build great products and services rapidly and reliably that delight customers and compete to win in the marketplace. 9
  • 10. Practices and Terminology 10
  • 11. How does a Product Request get Prioritized?Portfolio Management• Priorities are set at the portfolio level and informs the individual team priorities• Central oversight of budget, risk management, strategic alignment of investments, demand and • Portfolio investment management along with Portfolio standardization of investment procedure, rules Priorities Priorities and plans. • Portfolio successProduct Backlog metrics• A prioritized list of things needed to be done: Themes, Epics, Products, Features, and Stories. Team Product • Team priorities• Final requirement details are figured out during implementation. • Team success Backlogs• New items can be added to the Product Backlog metrics at any time (unlike Scrum where items can only be added during Sprint planning).• “Backlog Grooming” is performed by the team on a regular basis.• The GM and Product Manager regularly make priority and sequencing decisions based on expected value of items in the Backlog
  • 12. Three Variables Product Considers When Weighing Priorities• Business Score – What is the business value of the initiative (ROI, PV’s, etc.)? • Project brief• Level of Effort – How many resources will it take to realize the business value? • Step one: “t-shirt” sizing (S,M,L) • Step two: Grooming meetings• Team Capacity – What else are people working on and what would need to be de-prioritized to work on this initiative • Working on standard measure to communicate this at the Portfolio and Team levels
  • 13. Themes, Epics and Stories• Theme or “tent-pole”: a top-level objective or vision.• Epic: a group of related Stories that describes a particular higher level capability or functionality.• Story*: an Independent, Negotiable, Valuable, Estimatable, Small, Testable candidate requirement (“INVEST”).• Task: Stories will often be broken down into specific work sub-tasks. The Product Manager is responsible for making sure that work is broken down appropriately at each stage. For example, Themes and even Epics are okay during Portfolio reviews but all Epics should be broken down to the Story level once Grooming meetings are complete. 13
  • 14. MVP: Minimum Viable Product (or Feature)• Has just those user stories that allow the product/feature to be deployed that still achieves the desired business goal, and no more.• Avoid building products that customers do not want, maximize the information learned about user preferences per dollar spent.• The process is iterated until a desirable product- market fit is obtained, or until the product is deemed to be non-viable. “Over 70 years, this (Silicon) Valley has developed a culture that does not personalize failure,” said Mr. Komisar, of Kleiner Perkins. “If you’re not corrupt, stupid or lazy, we see failure as learning — learn from it, and reapply it.” NY Times 14
  • 15. Kanban• Kanban is a method for developing and releasing products with an emphasis on moving small batches of work through the product development system with a more continuous, even flow.• Analysts, developers & testers pull from a queue of tasks that are ready for work.• People only work on one or two tasks at a time (limit WIP).• The work in progress is displayed for participants to see on a physical or virtual wall-board – making it easy to see status and for bottlenecks to be identified and fixed. 15
  • 16. Kanban Wallboard Example 16
  • 17. Types of Testing Used in Agile Processes• Test Driven Development (TDD): Developers create automated or manual unit tests that define code specification (immediately) before writing the code itself.• Integration Testing: A phase in software testing in which individual software modules are combined and tested as a group. It occurs after unit testing and before acceptance testing.• Acceptance Testing: Requirements written as tests by Product Manager before development starts, used by developers in unit tests, and by QA for testing Stories in QA environments. Acceptance tests are how you know when you are “done”.• User Acceptance Testing (UAT): Performed by actual product manager or users during QA, or earlier to get feedback as early as possible.• Regression Testing (end to end): Continuous automated regression tests give rapid feedback during development, also performed by QA before release. 17
  • 18. Agile Meetings: Feedback & Learning• Daily Stand-up – Mandatory for all team members – Keep to 15 min or less – What you did yesterday, doing today, and blocking issues – Take technical discussions offline• Demo – Alpha/beta/feedback• Retrospective – What worked well last iteration that we should continue doing? – What didn’t work well last iteration that we should stop doing? – What should we start doing? 18
  • 19. Deployment On Demand• “Deployment on Demand” is the ability to choose when a particular product, feature, or bug fix should be deployed into an integration environment, into a QA environment, or into production.• As each Story is completed and release ready, the goal is to move that Story to production in order to begin gaining the value (and learning) expected from it.• If a Story is part of an MVP/MVF, then the completed Story may be held until the other Stories are completed. 19
  • 20. Documentation in the Agile World• Where should Product documentation exist? – Discovery Wiki: product docs, architecture docs, etc – JIRA ticket: story specific acceptance criteria, notes, etc.• When to document? – Project stakeholders require it – To define a visual model (design comps) – To define a contract model (external interfaces) – To support communication with an external group – To support organizational memory – To think something through 20
  • 21. Process Improvement Basics• Start with what you do now.• Initially, respect current roles, job titles and responsibilities.• Make Process Explicit.• Improve Collaboratively. 21
  • 22. Agile Estimation – “t-shirt sizing”• In Lean-Agile process, we assign work to the team, not the individual• In the Grooming Meetings, the team sits down to estimate its effort for the Epics and Stories in the backlog• T-shirt sizes (XS, S, M, L, XL, XXL) are common estimating methods for story items• The Product Manager needs these estimates, so that he can effectively prioritize items in the backlog and, as a result, forecast releases based on the teams throughput 22
  • 23. New Process Vertical/Central Services teams Monitoring/ Analysis Vertical MVP Acceptance Request Development Production Vertical Process Review TeamRequest Central Vertical support support Central Service Portfolio MVP Central Acceptance Production Review Process Dev Monitoring/ Analysis
  • 24. Intake/Review• Route new requests to Product Managers*• Project Brief• Scoring – Business value – Level of effort (t-shirt size: S, M, L, XL) – Capacity• Green lighting• Backlog prioritization*Maintenance/bugs – continue to do what you are doing.
  • 25. Minimum Viable Product• Epics/User Stories• Team review• Initial estimates (story points)• Team negotiation• MVP defined• User Stories refined w/ acceptance tests
  • 26. Request ChecklistProject Manager creates a Checklist for each request: Theme, Epic,and large User Story. Input is solicited from team members.  Does this require a Technical Approach Document (TAP) to capture high-level architectural approach.  If a VAP project, does this need Central architectural review or input?  How much requirements documentation is needed? This is usually based on risk and stakeholder needs.  User/Tech Stories with Acceptance Test Criteria (required)  Wireframes?  Design Comps?  Full functional specification?  API or interface specification?  Do other stakeholders need to be included in the requirement analysis, demos, reviews, etc.  AdOps  Ad Sales  Analytics  Publishing 26
  • 27. Development/Acceptance - very simplified…• Developers pick up User Stories that are “ready for development” (i.e. refined with acceptance criteria and estimate) as they have capacity.• Developer codes & unit tests components, then integrates and tests User Story end-to-end.• Developer frequently demos results to Product Manager before and after integration testing to get feedback.• QA tester picks up and verifies “integrated” stories against Acceptance Tests, then UAT by any external stakeholder (e.g. AdOps) is performed.• When all User Stories for MVP have been passed Acceptance Testing, and regression testing has been completed, the software is “ready for deployment”.• Software is deployed and verified in production by QA.
  • 28. Standard Daily Meetings• Daily Stand-up (All Teams: VAT, Central, Mobile, etc) – Daily check-in with team members – Mandatory for core team members: Product, Dev, QA, PM, Design/UX – Each team to pick a non-overlapping 15 minute slot between 9:30 and 11:30. PMs to coordinate• Daily Change Control – Every morning at 9:15-9:30 – PMs, Product Managers, Central tech reps. – Determine what do with new/timely issues – particularly from VATs. Cancel if no items for change control. 28
  • 29. Other Weekly or Ad-Hoc Meetings• Grooming Meetings (Each Team) – Product Manager/Owner collaboratively reviews Backlog, discuss and refine Stories, etc. with the team. Usually done in the context of a particular MVP/MVF – Story point estimates provided by team – Most, if not all, team members should participate as this is a critical information sharing session• Prioritization Meetings (Each Team) – Product Managers and Product Owners will meet on an as-needed basis to review priorities. – Program Manager will coordinate any portfolio prioritization meetings on an as- needed basis.• Retrospectives “Lessons learned” (Each Team) – Organized by PM after an iteration or every few weeks 29
  • 30. Theme, Epic, User Story Examples 30
  • 31. Recap: Themes, Epics and Stories• Theme or “tent-pole”: a top-level objective or vision.• Epic: a group of related Stories that describes a particular higher level capability or functionality, or more generally an epic is a high level story used as a placeholder.• Story: an Independent, Negotiable, Valuable, Estimatable, Small, Testable candidate requirement (“INVEST”). User stories are written from a user point of view.• Acceptance Test: Specific user scenarios, provided by Product Manager, that are used to determine when a user story has been correctly implemented.• Sub-Task: Stories will often be broken down into specific work sub-tasks.• MVP/MVF: Has just those user stories that allow the product/feature to achieve the desired business goal, and no more. Iterate and learn until a desirable product-market fit is obtained, or until the product is deemed to be non-viable.Note: this “user story” based process is very deliberately intended to minimize the use ofbig requirements documents and focus more on verbal conversation to achieve mutualunderstanding between customer/user representative and the developer. 31
  • 32. Example: Website RedesignTheme: Website Redesign 2011• Relaunch XYZ website as a destination for men between age of 18-45, double audience in 18 months.Sample Epics:• New Blog oriented verticals for Adventure, Gear & Gadgets, Cars & Bikes• Producers can publish and feature News blog content• Visitors can easily navigate to featured videos, topics, sub-topics, ad sales packages, and Commerce promotions within a streamlined top navigation• Producers can feature new content within an updated Homepage designSample “Homepage” Stories:• As a Producer I want to select the featured content so visitors can easily find curated content.• As a Visitor I want to view the Facebook like count and Twitter follower number so I can easy like or follow if I want to.• As AdOps user I want to be able serve Pushdown, Tile, and Entitlement ads on the homepage so we can monetize the content.• As a Visitor I want to see the most recent articles 32
  • 33. Example: MVPHomepage MVP1. As a Producer I want to select the featured content so visitors can easily find curated content2. As a Visitor I want to view the Facebook like count and Twitter follower number so I can easy like or follow if I want to.3. As AdOps user I want to be able serve Pushdown, Tile, and Entitlement ads on the homepage so we can monetize the content.4. Etc…Deferred – non-MVP1. As a Visitor I want to see the most recent articles2. As a Commerce Producer I want to promote a list featured products in the Right Rail in order for Visitors to see different kinds of products.3. Etc… 33
  • 34. Example: Acceptance Test CriteriaUser Story: As a Producer I want to select the featured content so visitors can easily findcurated content.Acceptance Test Criteria• Featured content consists of a minimum of 6 items and a maximum of 10 items.• Content in the featured stream can come from all articles and blog posts.• Producers control what appears in the featured stream and the position in which it appears.• Featured Content Displays [title], [image], [topic], [description], [read more link].• [title], [image] and [read more link] link to the individual asset.• [topic] rules are as follows: 1. Display [topic] which the asset belongs to 2. IF [topic] is "Show News", THEN display show tag instead. (e.g. Mythbusters or Shark Week) 3. IF [topic] is not "Show News" and the asset has a Supertag, THEN display the Supertag instead. 4. [topic] links to topic page, showsite or tag listing page accordingly. 34
  • 35. JIRA Request Tracking 35
  • 36. Backlog vs. Work In Progress• Backlog – ___BCK-### – Backlog is upcoming work, may be some early discussions – Has not been fully prioritized/sequenced – The items to be worked on next should be more refined• Work In Progress – ___WIP-### – Prioritized – Meets “Ready For Development” criteria – In the hands of engineering• All teams have both types of queues
  • 37. JIRA Queues or “Projects”• Lessons learned – Jira only allows a certain level of granularity because of hierarchy restrictions in the software – We need the granularity to provide vertical specific reporting – We need the granularity to view backlog (new stuff) separately from work in progress• Separate queues provides better granularity
  • 38. Simplified Ticket Types• Backlog Ticket Types • Subtask Ticket Types – Theme/Epic – Design / Development – User Story – Documentation – Tech Story – Deployment / SysAdmin – Production Defect – QA Defect – Research/Prototype • Support Ticket Types• WIP Ticket Types – Production Support – User Story – Publishing Support – Tech Story – Production Support – Production Defect – Research/Prototype
  • 39. Customized Workflows Based on Ticket Type• New Jira feature for the team• Tickets follow a particular path and change status by clicking a “workflow button”• Software Limited choices – Simplifies moving ticket from one status to another• Business Criteria / Rules to change status – Clarifies what a particular status really means
  • 40. Lean/Agile Principles – More Info 41
  • 41. Eliminate WasteLook for policies, processes, or practices that take time, energy, and resourcesthat do not add value and streamline, automate, or stop doing them.• Work in Progress• Extra Processes• Extra Documentation• Extra Features• Task Switching• Design Loop-backs• Significant support burden• Waiting• Hand-offs• Defects• Management Activities 42
  • 42. Technical ExcellenceAbility to respond to change and rapid delivery requires strong engineeringpractices• More testing, less debugging• Low-dependency architectures• Continuous integration• Evolutionary design and development• Refactoring• Good coding practices• Code reviewsSee wiki for more details:https://wiki.discovery.com:8443/display/DMS/Technical+Discipline+and+Tools 43
  • 43. Amplify Learning• “Fail Fast, Fail Cheap”• Use set based decision making to identify and evaluate several options.• Share requirements, designs, and code (demos) early and often.• Use feedback loops: demos, reviews, postmortems, metrics, prototypes, etc.• “Information Radiators” that are quick ways to get info to the team.• Relentless improvement: seeing and solving problems, sharing the knowledge. 44
  • 44. Defer Commitment• Leave options open and accommodate evolving requirements.• Let the solution emerge: do not wait to get all of the details worked out before starting design and development.• Define scope at a high level, the details are negotiable.• Do not waste time developing detailed requirements for work to be done in the future.• Multiple options of good+safe, better+risky, optimal+high-risk approach.• Delaying decisions until they need to be made reduces rework. 45
  • 45. Deliver as Fast as Possible• Deliver value early rather than wait longer for a “complete” product.• Short iterations with continuous delivery encourage a “Try-it, test-it, fix-it” approach instead of “Do it right the first time”.• Use the “pull-system” principle of Kanban and "Just in Time“ – no large batches that cause bottlenecks and delays.• Releases to Production in small increments when ready.• The goal is reliable and repeatable results, not a repeatable process. 46
  • 46. Build Trust and Empower the Team• Excellent, focused, disciplined, and empowered people are key to success.• Trust and respect between team members and between managers and employees is essential.• Find and grow professionals with purpose, passion, persistence, and pride.• Keep teams as small and focused as possible.• Build cross-functional teams that mixes domain expertise with technical expertise.• Ensure there is a clear and compelling purpose for the work.• Give the technical team access to the customers, users, and decision makers.• Let the team make its own commitments and be accountable for outcomes.• Analysts are not be a substitute for developer-customer communication but should facilitate understanding on both sides. 47
  • 47. Build Quality In• Quality must be built-in, not tested for after the fact.• Technical Excellence and solid engineering practices are mandatory for Agile development to be successful.• Quality means realization of purpose or fitness for use rather than conformance to requirements or a set plan.• There are two kinds of Quality:  Perceived or External Quality-- the beauty, elegance, and delight of the product to the end user.  Conceptual or Internal Quality-- the integrity of the product’s architecture as an integrated whole as it balances between flexibility, maintainability, efficiency, and responsiveness.• Model driven design – based on end user view of the system. This will help ensure that we "build the right thing".• Everyone is responsible for quality. The developer in particular has a very active role in ensuring quality - this must not be thought of as "QAs job". 48
  • 48. Systems-Thinking: “See the Whole”• Look at customer outcomes (increased audience and engagement for example) rather than internal measures such as productivity, features developed, or sticking to a plan.• Value output: quality of output is more important than quantity of output when measuring productivity of knowledge workers. Delivering fast without quality is wasteful.• Look for ways to bring predictability to value demand, by eliminating “failure demand” and filtering value demand in a more disciplined way to match up with capacity.• Instead of optimizing parts the system or organization to increase growth such as productivity, or speed, look for and remove what is a constraint to growth, productivity, or speed.• Beware of optimizing a part, such as ensuring high utilization, at the expense of the whole. Trying to maximize utilization invariably leads to delays and other adverse results.• Look for and fix root causes, rather than symptoms. 49

×