Mike Holder Division 12  April 8 th , 2011 2011 Charlotte Chamber Transportation Summit
<ul><li>Highways: </li></ul><ul><li>Total identified needs (2015 – 2020) = $45 billion </li></ul><ul><li>About $9 billion ...
Strategic Prioritization Process <ul><li>Data-driven system created that evaluates all proposed TIP projects based  </li><...
STIP Schedule <ul><ul><li>Sept. – Oct.2010   MPO/RPO review Draft STIP </li></ul></ul><ul><ul><li>Department requests feed...
State Transportation Improvement Program Division 12: STIP 12-18 $ 479 Million 6.27% Equity Share Division 12 Ten Year Wor...
<ul><li>R-2206 – NC 16 Bypass </li></ul><ul><li>Lincoln and Catawba Counties </li></ul><ul><li>Roadway is open to St James...
<ul><li>R-3833 – Brawley School Road </li></ul><ul><li>Iredell County </li></ul><ul><li>Widen to multi-lanes with new inte...
<ul><li>I-3819 – Interchange Modifications  </li></ul><ul><li>Iredell County </li></ul><ul><li>Geometric improvements, wid...
<ul><li>I-2707 – US 74 Bypass </li></ul><ul><li>Cleveland County </li></ul><ul><li>Right of Way purchase, Environmental Mi...
<ul><li>I-5000 – I-85/US 321 Interchange </li></ul><ul><li>Gaston County </li></ul><ul><li>Geometric Safety Improvements t...
<ul><li>I-4750 – I-77 Widening </li></ul><ul><li>Iredell and Mecklenburg Counties </li></ul><ul><li>Widen and reconstruct ...
<ul><li>R-3100 – NC 16 Widening </li></ul><ul><li>Catawba County </li></ul><ul><li>Widening of Existing NC 16 from Tower R...
<ul><li>R-2307 – NC 150 Widening </li></ul><ul><li>Iredell, Catawba, and Lincoln Counties </li></ul><ul><li>Widening NC 15...
    <ul><li>Questions? </li></ul>
Upcoming SlideShare
Loading in …5
×

State and Local Road Project Updates: Part 3

776
-1

Published on

Mike Holder from the North Carolina Department of Transportation (NCDOT) Division 12 reports at the Charlotte Chamber 2011 Transportation Summit.

Published in: News & Politics, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
776
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

State and Local Road Project Updates: Part 3

  1. 1. Mike Holder Division 12 April 8 th , 2011 2011 Charlotte Chamber Transportation Summit
  2. 2. <ul><li>Highways: </li></ul><ul><li>Total identified needs (2015 – 2020) = $45 billion </li></ul><ul><li>About $9 billion in anticipated revenues for this timeframe </li></ul><ul><li>Non-highways: </li></ul><ul><li>Total identified needs (2015 – 2020) = $9 billion </li></ul><ul><li>About $1.5 billion in available revenue for this timeframe </li></ul><ul><li>Summary: </li></ul><ul><li>$54 billion in total identified transportation needs (2015 – 2020) </li></ul><ul><li>Estimated $10.5 billion in available revenue for this timeframe </li></ul>Funding Snapshot
  3. 3. Strategic Prioritization Process <ul><li>Data-driven system created that evaluates all proposed TIP projects based </li></ul><ul><li>on a list of quantitative data; </li></ul><ul><ul><li>Traffic counts </li></ul></ul><ul><ul><li>Congestion/capacity </li></ul></ul><ul><ul><li>Local support </li></ul></ul><ul><ul><li>Regional support </li></ul></ul><ul><ul><li>Safety </li></ul></ul><ul><li>Projects are scored individually and then ranked. </li></ul><ul><li>Public meetings, aggressive community outreach </li></ul><ul><li>Actively engaged local governments, MPO/RPOs and stakeholders </li></ul>
  4. 4. STIP Schedule <ul><ul><li>Sept. – Oct.2010 MPO/RPO review Draft STIP </li></ul></ul><ul><ul><li>Department requests feedback on initial process </li></ul></ul><ul><ul><li>March 2011 Public Meetings on Draft STIP </li></ul></ul><ul><ul><li>July 2011 BOT adopts Final STIP </li></ul></ul><ul><ul><li>Sept. 2011 NCDOT submits revised STIP to FHWA </li></ul></ul><ul><ul><li>December 2011 Draft NCSTP released </li></ul></ul><ul><ul><li>December 2011 Investment Strategy Process </li></ul></ul><ul><ul><li>May 2012 Draft Policy to Projects document released </li></ul></ul>
  5. 5. State Transportation Improvement Program Division 12: STIP 12-18 $ 479 Million 6.27% Equity Share Division 12 Ten Year Work Plan $864 Million Maintain 13712 Lane Miles of Roadway 5,827,646 Square Feet of Bridge Deck
  6. 6. <ul><li>R-2206 – NC 16 Bypass </li></ul><ul><li>Lincoln and Catawba Counties </li></ul><ul><li>Roadway is open to St James Church Road in Lincoln County </li></ul><ul><li>Project scheduled for completion to NC 150 in Catawba County in Summer of 2011 </li></ul><ul><li>Turnkey $161 Million </li></ul>
  7. 7. <ul><li>R-3833 – Brawley School Road </li></ul><ul><li>Iredell County </li></ul><ul><li>Widen to multi-lanes with new interchange at I-77 </li></ul><ul><li>Section from Chuckwood Road at “The Point” to I-77 under construction with completion fall 2012 </li></ul><ul><li>$124 million </li></ul>
  8. 8. <ul><li>I-3819 – Interchange Modifications </li></ul><ul><li>Iredell County </li></ul><ul><li>Geometric improvements, widening and safety modifications to I-40/I-77 interchange and to US 21/I-40 interchange in Statesville </li></ul><ul><li>Right of Way in progress </li></ul><ul><li>Construction 2012 – 2015 </li></ul><ul><li>$100 million </li></ul>
  9. 9. <ul><li>I-2707 – US 74 Bypass </li></ul><ul><li>Cleveland County </li></ul><ul><li>Right of Way purchase, Environmental Mitigation and Construction from 2011 to 2015 </li></ul><ul><li>$326 million </li></ul>
  10. 10. <ul><li>I-5000 – I-85/US 321 Interchange </li></ul><ul><li>Gaston County </li></ul><ul><li>Geometric Safety Improvements to the existing interchange </li></ul><ul><li>Right of Way in 2014 </li></ul><ul><li>Construction 2015 </li></ul><ul><li>$36 million </li></ul>
  11. 11. <ul><li>I-4750 – I-77 Widening </li></ul><ul><li>Iredell and Mecklenburg Counties </li></ul><ul><li>Widen and reconstruct I-77 from NC 73 to I-40 </li></ul><ul><li>Right of Way 2016 </li></ul><ul><li>Construction 2019 </li></ul><ul><li>$526 million </li></ul>
  12. 12. <ul><li>R-3100 – NC 16 Widening </li></ul><ul><li>Catawba County </li></ul><ul><li>Widening of Existing NC 16 from Tower Road to Claremont Road </li></ul><ul><li>$52 million </li></ul>
  13. 13. <ul><li>R-2307 – NC 150 Widening </li></ul><ul><li>Iredell, Catawba, and Lincoln Counties </li></ul><ul><li>Widening NC 150 from I-77 to Harvel Road in Catawba County </li></ul><ul><li>Right of Way in 2017 </li></ul><ul><li>Construction in 2020 </li></ul><ul><li>$97 million </li></ul>
  14. 14. <ul><li>Questions? </li></ul>

×