    Snow Mountain Tunnel ChungHwa University Level 3 Grp 4 - Presentation Transcript

    1. The Snow Mountain Tunnel Construction Miracle Member List: B09315111 Stefanie B09315105 Evan B09315107 Kelly B09315113 Wade B09315117 Amanda B09315119 Lalia
    2. 1.Introduction
      • The Hsuehshan Tunnel or "Snow Mountain" tunnel, is the longest tunnel in Taiwan, located on the Taipei-Ilan Expressway ( Taiwan National Highway No. 5 ). The road connects the city of Taipei to the northeastern county of I-lan, cutting down the journey time from two hours to just half an hour. One of the key aims of constructing the tunnel was to connect the western coast of Taiwan, where 95% of the population live, to the eastern coast of the island and in doing so tackle the unbalanced development on the island.
    3. 2.History and Information
      • *History
      • 1) Engineers encountered geological problems which caused several delays.
      • 2) Fractured rock and massive inflows of water.
      • 3) One of the two TBMs( Tunnel Boring Machine; It costs one billion NT dollars for each machine) was buried by a ground collapse.
      • 4) Six major faults, numerous fracture zones, and high-pressure groundwater.
      • 5) 25 lives were lost during 15 years of construction
      • *Information
      • 1)Tunnel length
      • Main Tunnel-> E:12917m W: 12942m
      • Pilot Tunnel-> 12941m
      • 2)Design speed- > 70km/h
      • 3)Location -> Pinglin, Taipei County and Toucheng, Ilan County
      • 4)Total cost- > NT$ 18.5 billion
      • 5)Date of starting construction- > Pilot Tunnel: July 1991
      • Main Tunnels: July 23, 1993
      • 6)Date of breakthrough- > Eastbound tunnel: September 2004
      • Westbound tunnel: April 2004
      • Pilot tunnel: October 2003
      • 7)Date of opening- > June 16, 2006
    4. The traffic light in the Snow Mountain Tunnel. A bird’s-eye view of the main TBMs, which used to bore the main tunnels.
    5. One of the small TBMs. It used to bore the pilot tunnel.
    6. The safety devices in the tunnel . A bird’s-eye view of the entrance.
    7. Cars in the tunnel. Actually, it’s a traffic jam! Another traffic jam~
    8. 3.Effects and Significance
      • 1) The 31km Taipei-ilan Freeway will link the nation's prosperous western half with the less developed eastern half.
      • 2) The Taipei-Ilan Freeway will balance regional developments and furnish people with a convenient and fast means of transportation.
      • 3) More than 30,000 cars a day are expected to use the tunnel, with the figure expected to rise sharply on weekends.
    9. 4.Reflection
      • As a local resident of I-lan, what’s your thought about the Snow Mountain Tunnel?
    10. 5.Video of the tunnel: Discovery Show Time

    + Hsinchu/ToufenHsinchu/Toufen, 3 years ago

    custom

    1661 views, 0 favs, 0 embeds more stats

    October 2006 Conversation Students Presentation
    Te more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 1661
      • 1661 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 10
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories