SlideShare is now on Android. 15 million presentations at your fingertips.  Get the app

×
  • Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
 

Proyecto De Investigacion De La Empresa De Transportes Angel Divino

by on Oct 08, 2009

  • 14,962 views

AVANCE HASTA LA FASE TRES

AVANCE HASTA LA FASE TRES

Statistics

Views

Total Views
14,962
Views on SlideShare
14,956
Embed Views
6

Actions

Likes
1
Downloads
105
Comments
1

2 Embeds 6

http://www.docseek.net 5
http://www.slashdocs.com 1

Accessibility

Categories

Upload Details

Uploaded via SlideShare as Microsoft Word

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel

11 of 1 previous next

  • martinjaramillo Martin Jaramillo Los teleféricos, metros, buses articulados y telesillas, por sus altos costos, no son rentables y están siendo remplazados por sistemas aerosuspendidos que equivalen a las verdaderas carreteras ecológicas, que son elevadas, para cualquier topografía y para cualquier distancia y capacidad, no necesitan deforestar, ni remover tierras, ni siquiera retirar la corteza vegetal, son para vehículos eléctricos aerosuspendidos, inteligentes y silenciosos que desarrollan velocidades hasta de 250 Km/h., con cero accidentalidad y reciclando la energía del frenado, no los afecta el clima...Y lo más increíble: son el sistema de transporte más económico que existe, desde US$ 150.000 dólares por kilómetro.
    tranxrail@gmail.com
    martinjaramilloperez@gmail.com
    Martín Jaramillo 314 873 17 95 Colombia.
    1 year ago
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Proyecto De Investigacion De La Empresa De Transportes Angel Divino Proyecto De Investigacion De La Empresa De Transportes Angel Divino Document Transcript