Sni pekbeton 2008
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
643
On Slideshare
643
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
10
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Standar Nasional IndonesiaSNI 7394:2008Tata cara perhitungan harga satuan pekerjaan betonuntuk konstruksi bangunan gedung dan perumahanICS 91.010.20 Badan Standardisasi Nasional“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 2. “HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 3. SNI 7394:2008Daftar isiDaftar isi..........................................................................................................................................iPrakata………………………………………………………………………………………………………iiiPendahuluan………………………………………………………………………………………………..iv1 Ruang lingkup.......................................................................................................................12 Acuan normatif......................................................................................................................13 Istilah dan definisi .................................................................................................................14 Singkatan istilah....................................................................................................................25 Persyaratan...........................................................................................................................26 Penetapan indeks harga satuan pekerjaan beton ................................................................36.1 Membuat 1 m3beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 ................36.2 Membuat 1 m3beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 ................36.3 Membuat 1 m3beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, ..............................36.4 Membuat 1 m3lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87...46.5 Membuat 1 m3beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, ..............................46.6 Membuat 1 m3beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, ..............................46.7 Membuat 1 m3beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, ..............................46.8 Membuat 1 m3beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56.............56.9 Membuat 1 m3beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, ..............................56.10 Membuat 1 m3beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, ..............................56.11 Membuat 1 m3beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, ..............................56.12 Membuat 1 m3beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, ..............................66.13 Membuat 1 m3beton kedap air dengan strorox – 100..........................................................66.14 Memasang 1 m’PVC Waterstop lebar 150 mm....................................................................66.15 Memasang 1 m’PVC Waterstop lebar 200 mm....................................................................66.16 Membuat 1 m’PVC Waterstop lebar 230 mm – 320 mm .....................................................66.17 Pembesian 10 kg dengan besi polos atau besi ulir .............................................................76.18 Memasang 10 kg kabel presstressed polos/strands...........................................................76.19 Memasang 10 kg jaring kawat baja/wire mesh....................................................................76.20 Memasang 1 m2bekisting untuk pondasi ...........................................................................76.21 Memasang 1 m2bekisting untuk sloof ................................................................................76.22 Memasang 1 m2bekisting untuk kolom ..............................................................................86.23 Memasang 1 m2bekisting untuk balok ...............................................................................86.24 Memasang 1 m2bekisting untuk lantai ...............................................................................86.25 Memasang 1 m2bekisting untuk dinding ............................................................................96.26 Memasang 1 m2bekisting untuk tangga.............................................................................96.27 Memasang 1 m2jembatan untuk pengecoran beton ..........................................................96.28 Membuat 1 m3pondasi beton bertulang (150 kg besi + bekisting).....................................106.29 Membuat 1 m3sloof beton bertulang (200 kg besi + bekisting).........................................106.30 Membuat 1 m3kolom beton bertulang (300 kg besi + bekisting) .....................................1216.31 Membuat 1 m3balok beton bertulang (200 kg besi + bekisting).......................................116.32 Membuat 1 m3plat beton bertulang (150 kg besi + bekisting)...........................................12“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 4. SNI 7394:2008ii6.33 Membuat 1 m3dinding beton bertulang (150 kg besi + bekisting) .....................................126.34 Membuat 1 m3dinding beton bertulang (200 kg besi + bekisting) .....................................136.35 Membuat 1 m’kolom praktis beton bertulang (11 x 11) cm ..............................................136.36 Membuat 1 m’ring balok beton bertulang (10 x 15) cm.....................................................14Lampiran A………………………………………………………………………………………………. 15Bibliografi………………………………………………………………………………………………… 16“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 5. SNI 7394:2008iiiPrakataRancangan Standar Nasional Indonesia (RSNI) tentang Tata cara perhitungan harga satuanpekerjaan beton untuk konstruksi bangunan dan perumahan adalah revisi RSNI T-13-2002,Tata cara perhitungan harga satuan pekerjaan beton, dengan perubahan pada indeks hargabahan dan indeks harga tenaga kerja.Standar ini disusun oleh Panitia Teknis Bahan Konstruksi Bangunan dan Rekayasa Sipilmelalui Gugus Kerja Struktur dan Konstruksi Bangunan pada Subpanitia Teknik Bahan,Sains, Struktur, dan Konstruksi Bangunan.Tata cara penulisan disusun mengikuti Pedoman Standardisasi Nasional 08:2007 dandibahas pada rapat konsensus pada tanggal 7 Desember 2006 di Pusat Penelitian danPengembangan Permukiman Bandung dengan melibatkan para nara sumber, pakar danlembaga terkait.“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 6. SNI 7394:2008ivPendahuluanTata cara perhitungan harga satuan pekerjaan ini disusun berdasarkan pada hasil penelitianAnalisis Biaya Konstruksi di Pusat Litbang Permukiman 1988 – 1991. Penelitian ini dilakukandalam dua tahap. Tahap pertama dengan melakukan pengumpulan data sekunder analisisbiaya yang diperoleh dari beberapa BUMN, Kontraktor dan data yang berasal dari analisisyang telah ada sebelumnya yaitu BOW. Dari data sekunder yang terkumpul dipilih datadengan modus terbanyak. Tahap kedua adalah penelitian lapangan untuk memperoleh dataprimer sebagai cross check terhadap data sekunder terpilih pada penelitian tahap pertama.Penelitian lapangan berupa penelitian produktifitas tenaga kerja lapangan pada beberapaproyek pembangunan gedung dan perumahan serta penelitian laboratorium bahanbangunan untuk komposisi bahan yang digunakan pada setiap jenis pekerjaan denganpendekatan kinerja/performance dari jenis pekerjaan terkait.DATA LAPANGANWAKTU DASAR INDIVIDUWAKTU NORMAL INDIVIDUTABULASI DATATES KESERAGAMAN DATATES KECUKUPAN DATAWAKTU NORMALWAKTU STANDARBAHAN ANALISIS BIAYAKONSTRUKSI/ BARUWaktu produktifRating keterampilan,mutu kerja, kondisikerja, cuaca, dllTingkat ketelitian 10%dan tingkat keyakinam95%Kelonggaranwaktu/allowanceTidak Cukup Cukup“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 7. SNI 7394:20081 dari 16Tata cara perhitungan harga satuan pekerjaan betonuntuk konstruksi bangunan gedung dan perumahan1 Ruang lingkupStandar ini menetapkan indeks bahan bangunan dan indeks tenaga kerja yang dibutuhkanuntuk tiap satuan pekerjaan beton yang dapat dijadikan acuan dasar yang seragam bagipara pelaksana pembangunan gedung dan perumahan dalam menghitung besarnya hargasatuan pekerjaan beton untuk bangunan gedung dan perumahan.Jenis pekerjaan beton yang ditetapkan meliputi :a) Pekerjaan pembuatan beton f’c = 7,4 MPa (K 100) sampai dengan f’c = 31,2 MPa (K 350)untuk pekerjaan beton bertulang;b) Pekerjaan pemasangan water stop dan bekisting berbagai komponen struktur bangunan;c) Pekerjaan pembuatan pondasi, sloof, kolom, balok, dinding beton bertulang, kolompraktis dan ring balok.2 Acuan normatifStandar ini disusun mengacu kepada hasil pengkajian dari beberapa analisa pekerjaan yangtelah diaplikasikan oleh beberapa kontraktor dengan pembanding adalah analisa BOW 1921dan penelitian analisa biaya konstruksi.3 Istilah dan definisi3.1bangunan gedung dan perumahanbangunan yang berfungsi untuk menampung kegiatan kehidupan bermasyarakat3.2harga satuan bahanharga yang sesuai dengan satuan jenis bahan bangunan3.3harga satuan pekerjaanharga yang dihitung berdasarkan analisis harga satuan bahan dan upah3.4indeksfaktor pengali atau koefisien sebagai dasar penghitungan biaya bahan dan upah kerja3.5indeks bahanindeks kuantum yang menunjukkan kebutuhan bahan bangunan untuk setiap satuan jenispekerjaan3.6indeks tenaga kerjaindeks kuantum yang menunjukkan kebutuhan waktu untuk mengerjakan setiap satuan jenispekerjaan“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 8. SNI 7394:20082 dari 163.7pelaksana pembangunan gedung dan perumahanpihak-pihak yang terkait dalam pembangunan gedung dan perumahan yaitu para perencana,konsultan, kontraktor maupun perseorangan dalam memperkirakan biaya bangunan.3.8perhitungan harga satuan pekerjaan konstruksisuatu cara perhitungan harga satuan pekerjaan konstruksi, yang dijabarkan dalam perkalianindeks bahan bangunan dan upah kerja dengan harga bahan bangunan dan standarpengupahan pekerja, untuk menyelesaikan persatuan pekerjaan konstruksi3.9satuan pekerjaansatuan jenis kegiatan konstruksi bangunan yang dinyatakan dalam satuan panjang, luas,volume dan unit3.10semen portland tipe Isemen portland yang umum digunakan tanpa persyaratan khusus4 Singkatan istilahSingkatan Kepanjangan Istilahcm centimeter Satuan panjangkg kilogram Satuan beratm’ meter panjang Satuan panjangm2meter persegi Satuan luasm3meter kubik Satuan volumeOH Orang Hari Satuan tenaga kerja perhariPC Portland Cement Semen PortlandPB Pasir beton Agregat halus ukuran < 5 mmKR Kerikil Agregat kasar ukuran 5 mm – 40 mm5 Persyaratan5.1 Persyaratan umumPersyaratan umum dalam perhitungan harga satuan:a) Perhitungan harga satuan pekerjaan berlaku untuk seluruh wilayah Indonesia,berdasarkan harga bahan dan upah kerja sesuai dengan kondisi setempat;b) Spesifikasi dan cara pengerjaan setiap jenis pekerjaan disesuaikan dengan standarspesifikasi teknis pekerjaan yang telah dibakukan.5.2 Persyaratan teknisPersyaratan teknis dalam perhitungan harga satuan pekerjaan:a) Pelaksanaan perhitungan satuan pekerjaan harus didasarkan pada gambar teknis danrencana kerja serta syarat-syarat (RKS);b) Perhitungan indeks bahan telah ditambahkan toleransi sebesar 5%-20%, dimana didalamnya termasuk angka susut, yang besarnya tergantung dari jenis bahan dankomposisi adukan;c) Jam kerja efektif untuk tenaga kerja diperhitungkan 5 jam perhari.“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 9. SNI 7394:20083 dari 16d) Analisa ini sebagai rancangan perhitungan harga satuan beton, dalam pelaksanaanpekerjaan komposisi campuran berdasarkan mix design yang dibuat dari hasil test bahandilaboratorium.e) Analisa (6.1 s/d 6.27) digunakan untuk gambar rencana yang sudah detail dan Analisa(6.28 s/d 6.36) untuk gambar rencana yang belum mempunyai gambar detail.6 Penetapan indeks harga satuan pekerjaan beton6.1 Membuat 1 m3beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87Kebutuhan Satuan IndeksPC kg 247,000PB kg 869KR (maksimum 30 mm) kg 999BahanAir Liter 215Pekerja OH 1,650Tukang batu OH 0,275Kepala tukang OH 0,028Tenaga kerjaMandor OH 0,0836.2 Membuat 1 m3beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78Kebutuhan Satuan IndeksPC kg 276,000PB kg 828KR (maksimum 30 mm) kg 1012BahanAir Liter 215Pekerja OH 1,650Tukang batu OH 0,275Kepala tukang OH 0,028Tenaga kerjaMandor OH 0,0836.3 Membuat 1 m3beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72Kebutuhan Satuan IndeksPC kg 299,000PB kg 799KR (maksimum 30 mm) kg 1017BahanAir Liter 215Pekerja OH 1,650Tukang batu OH 0,275Kepala tukang OH 0,028Tenaga kerjaMandor OH 0,083CATATANBobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 10. SNI 7394:20084 dari 166.4 Membuat 1 m3lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c= 0,87Kebutuhan Satuan IndeksPC kg 230,000PB kg 893KR (maksimum 30 mm) kg 1027BahanAir Liter 200Pekerja OH 1,200Tukang batu OH 0,200Kepala tukang OH 0,020Tenaga kerjaMandor OH 0,0606.5 Membuat 1 m3beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66Kebutuhan Satuan IndeksPC kg 326,000PB kg 760KR (maksimum 30 mm) kg 1029BahanAir Liter 215Pekerja OH 1,650Tukang batu OH 0,275Kepala tukang OH 0,028Tenaga kerjaMandor OH 0,0836.6 Membuat 1 m3beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61Kebutuhan Satuan IndeksPC kg 352,000PB kg 731KR (maksimum 30 mm) kg 1031BahanAir Liter 215Pekerja OH 1,650Tukang batu OH 0,275Kepala tukang OH 0,028Tenaga kerjaMandor OH 0,0836.7 Membuat 1 m3beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58Kebutuhan Satuan IndeksPC kg 371,000PB kg 698KR (maksimum 30 mm) kg 1047BahanAir Liter 215Pekerja OH 1,650Tukang batu OH 0,275Kepala tukang OH 0,028Tenaga kerjaMandor OH 0,083“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 11. SNI 7394:20085 dari 166.8 Membuat 1 m3beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56Kebutuhan Satuan IndeksPC kg 384,000PB kg 692KR (maksimum 30 mm) kg 1039BahanAir Liter 215Pekerja OH 1,650Tukang batu OH 0,275Kepala tukang OH 0,028Tenaga kerjaMandor OH 0,0836.9 Membuat 1 m3beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53Kebutuhan Satuan IndeksPC kg 406,000PB kg 684KR (maksimum 30 mm) kg 1026BahanAir Liter 215Pekerja OH 1,650Tukang batu OH 0,275Kepala tukang OH 0,028Tenaga kerjaMandor OH 0,0836.10 Membuat 1 m3beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52Kebutuhan Satuan IndeksPC kg 413,000PB m3681KR (maksimum 30 mm) m31021BahanAir Liter 215Pekerja OH 1,650Tukang batu OH 0,275Kepala tukang OH 0,028Tenaga kerjaMandor OH 0,0836.11 Membuat 1 m3beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49Kebutuhan Satuan IndeksPC kg 439,000PB kg 670KR (maksimum 30 mm) kg 1006BahanAir Liter 215Pekerja OH 2,100Tukang batu OH 0,350Kepala tukang OH 0,035Tenaga kerjaMandor OH 0,105“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 12. SNI 7394:20086 dari 166.12 Membuat 1 m3beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48Kebutuhan Satuan IndeksPC kg 448,000PB kg 667KR (maksimum 30 mm) kg 1000BahanAir Liter 215Pekerja OH 2,100Tukang batu OH 0,350Kepala tukang OH 0,035Tenaga kerjaMandor OH 0,1056.13 Membuat 1 m3beton kedap air dengan strorox – 100Kebutuhan Satuan IndeksPC kg 400,000PB m30,480KR (Kerikil 2cm/3cm) m30,800Strorox – 100 kg 1,200BahanAir Liter 210Pekerja OH 2,100Tukang batu OH 0,350Kepala tukang OH 0,035Tenaga kerjaMandor OH 0,1056.14 Memasang 1 m’PVC Waterstop lebar 150 mmKebutuhan Satuan IndeksBahan Waterstop lebar 150 mm m’1,050Pekerja OH 0,060Tukang batu OH 0,030Kepala tukang OH 0,003Tenaga kerjaMandor OH 0,0036.15 Memasang 1 m’PVC Waterstop lebar 200 mmKebutuhan Satuan IndeksBahan Waterstop lebar 200 mm m’1,050Pekerja OH 0,070Tukang batu OH 0,035Kepala tukang OH 0,004Tenaga kerjaMandor OH 0,0046.16 Membuat 1 m’PVC Waterstop lebar 230 mm – 320 mmKebutuhan Satuan IndeksBahanWaterstoplebar 230 mm - 320 mmm’1,050Pekerja OH 0,080Tukang batu OH 0,040Kepala tukang OH 0,004Tenaga kerjaMandor OH 0,004“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 13. SNI 7394:20087 dari 166.17 Pembesian 10 kg dengan besi polos atau besi ulirKebutuhan Satuan IndeksBesi beton (polos/ulir) kg 10,500BahanKawat beton kg 0,150Pekerja OH 0,070Tukang besi OH 0,070Kepala tukang OH 0,007Tenaga kerjaMandor OH 0,0046.18 Memasang 10 kg kabel presstressed polos/strandsKebutuhan Satuan IndeksBesi beton (polos/ulir) kg 10,500BahanKawat beton kg 0,100Pekerja OH 0,050Tukang besi OH 0,050Kepala tukang OH 0,005Tenaga kerjaMandor OH 0,0036.19 Memasang 1 Kg jaring kawat baja/wire meshKebutuhan Satuan IndeksJaring kawat baja dilas kg 1,020BahanKawat beton kg 0,050Pekerja OH 0,025Tukang besi OH 0,025Kepala tukang OH 0,002Tenaga kerjaMandor OH 0,0016.20 Memasang 1 m2bekisting untuk pondasiKebutuhan Satuan IndeksKayu kelas III m30,040Paku 5 cm – 10 cm kg 0,300BahanMinyak bekisting Liter 0,100Pekerja OH 0,520Tukang kayu OH 0,260Kepala tukang OH 0,026Tenaga kerjaMandor OH 0,0266.21 Memasang 1 m2bekisting untuk sloofKebutuhan Satuan IndeksKayu kelas III m30,045Paku 5 cm – 10 cm kg 0,300BahanMinyak bekisting Liter 0,100Pekerja OH 0,520Tukang kayu OH 0,260Kepala tukang OH 0,026Tenaga kerjaMandor OH 0,026“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 14. SNI 7394:20088 dari 166.22 Memasang 1 m2bekisting untuk kolomKebutuhan Satuan IndeksKayu kelas III m30,040Paku 5 cm – 12 cm kg 0,400Minyak bekisting Liter 0,200Balok kayu kelas II m30,015Plywood tebal 9 mm Lbr 0,350BahanDolken kayu galam,φ (8–10) cm, panjang 4mBatang 2,000Pekerja OH 0,660Tukang kayu OH 0,330Kepala tukang OH 0,033Tenaga kerjaMandor OH 0,0336.23 Memasang 1 m2bekisting untuk balokKebutuhan Satuan IndeksKayu kelas III m30,040Paku 5 cm – 12 cm kg 0,400Minyak bekisting Liter 0,200Balok kayu kelas II m30,018Plywood tebal 9 mm Lbr 0,350BahanDolken kayu galam,φ (8-10) cm, panjang 4mBatang 2,000Pekerja OH 0,660Tukang kayu OH 0,330Kepala tukang OH 0,033Tenaga kerjaMandor OH 0,0336.24 Memasang 1 m2bekisting untuk plat lantaiKebutuhan Satuan IndeksKayu kelas III m30,040Paku 5 cm – 12 cm kg 0,400Minyak bekisting Liter 0,200Balok kayu kelas II m30,015Plywood tebal 9 mm Lbr 0,350BahanDolken kayu galam,φ (8-10) cm, panjang 4 m Batang 6,000Pekerja OH 0,660Tukang kayu OH 0,330Kepala tukang OH 0,033Tenaga kerjaMandor OH 0,033“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 15. SNI 7394:20089 dari 166.25 Memasang 1 m2bekisting untuk dindingKebutuhan Satuan IndeksKayu kelas III m30,030Paku 5 cm – 12 cm kg 0,400Minyak bekisting Liter 0,200Balok kayu kelas II m30,020Plywood tebal 9 mm Lbr 0,350Dolken kayu galam,φ (8-10) cm, panjang 4 m Batang 3,000BahanFormite/penjaga jarakbekisting/spacerBuah 4,000Pekerja OH 0,660Tukang kayu OH 0,330Kepala tukang OH 0,033Tenaga kerjaMandor OH 0,0336.26 Memasang 1 m2bekisting untuk tanggaKebutuhan Satuan IndeksKayu kelas III m30,030Paku 5 cm – 12 cm kg 0,400Minyak bekisting Liter 0,150Balok kayu kelas II m30,015Plywood tebal 9 mm Lbr 0,350BahanDolken kayu galam,φ (8-10) cm, panjang 4 m Batang 2,000Pekerja OH 0,660Tukang kayu OH 0,330Kepala tukang OH 0,033Tenaga kerjaMandor OH 0,0336.27 Memasang 1 m2jembatan untuk pengecoran betonKebutuhan Satuan IndeksKayu kelas III (papan) m30,0264Paku 5 cm – 12 cm kg 0,600Bahan Dolken kayu galam(kaso),φ (8-10) cm, panjang 4 mBatang 0,500Pekerja OH 0,150Tukang kayu OH 0,050Kepala tukang OH 0,005Tenaga kerjaMandor OH 0,008“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 16. SNI 7394:200810 dari 166.28 Membuat 1 m3pondasi beton bertulang (150 kg besi + bekisting)Kebutuhan Satuan IndeksKayu kelas III m30,200Paku 5 cm – 12 cm kg 1,500Minyak bekisting Liter 0,400Besi beton polos kg 157,500Kawat beton kg 2,250PC kg 336,000PB m30,540BahanKR m30,810Pekerja OH 5,300Tukang batu OH 0,275Tukang kayu OH 1,300Tukang besi OH 1,050Kepala tukang OH 0,262Tenaga kerjaMandor OH 0,2656.29 Membuat 1 m3sloof beton bertulang (200 kg besi + bekisting)Kebutuhan Satuan IndeksKayu kelas III m30,270Paku 5 cm-12cm kg 2,000Minyak bekisting Liter 0,600Besi beton polos kg 210,000Kawat beton kg 3,000PC kg 336,000PB m30,540BahanKR m30,810Pekerja OH 5,650Tukang batu OH 0,275Tukang kayu OH 1,560Tukang besi OH 1,400Kepala tukang OH 0,323Tenaga kerjaMandor OH 0,283“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 17. SNI 7394:200811 dari 166.30 Membuat 1 m3kolom beton bertulang (300 kg besi + bekisting)Kebutuhan Satuan IndeksKayu kelas III m30,400Paku 5 cm – 12 cm kg 4,000Minyak bekisting Liter 2,000Besi beton polos kg 315,000Kawat beton kg 4,500PC kg 336,000PB m30,540KR m30,810Kayu kelas II balok m30,150Plywood 9 mm Lembar 3,500BahanDolken kayu galam,φ (8-10) cm, panjang 4 m Batang 20,000Pekerja OH 7,050Tukang batu OH 0,275Tukang kayu OH 1,650Tukang besi OH 2,100Kepala tukang OH 0,403Tenaga kerjaMandor OH 0,3536.31 Membuat 1 m3balok beton bertulang (200 kg besi + bekisting)Kebutuhan Satuan IndeksKayu kelas III m30,320Paku 5 cm – 12 cm kg 3,200Minyak bekisting Liter 1,600Besi beton polos kg 210,000Kawat beton kg 3,000PC kg 336,000PB m30,540KR m30,810Kayu kelas II balok m30,140Plywood 9 mm Lembar 2,800BahanDolken kayu galam,φ (8-10) cm, panjang 4 m Batang 16,000Pekerja OH 6,350Tukang batu OH 0,275Tukang kayu OH 1,650Tukang besi OH 1,400Kepala tukang OH 0,333Tenaga kerjaMandor OH 0,318“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 18. SNI 7394:200812 dari 166.32 Membuat 1 m3plat beton bertulang (150 kg besi + bekisting)Kebutuhan Satuan IndeksKayu kelas III m30,320Paku 5 cm – 12 cm kg 3,200Minyak bekisting Liter 1,600Besi beton polos kg 157,500Kawat beton kg 2,250PC kg 336,000PB m30,540KR m30,810Kayu kelas II balok m30,120Plywood 9 mm Lembar 2,800BahanDolken kayu galam,φ (8-10) cm, panjang 4 m Batang 32,000Pekerja OH 5,300Tukang batu OH 0,275Tukang kayu OH 1,300Tukang besi OH 1,050Kepala tukang OH 0,265Tenaga kerjaMandor OH 0,2656.33 Membuat 1 m3dinding beton bertulang (150 kg besi + bekisting)Kebutuhan Satuan IndeksKayu kelas III m30,240Paku 5 cm – 12 cm kg 3,200Minyak bekisting Liter 1,600Besi beton polos kg 157,500Kawat beton kg 2,250PC kg 336,000PB m30,540KR m30,810Kayu kelas II balok m30,160Plywood 9 mm Lembar 2,800BahanDolken kayu galam,φ (8-10) cm, panjang 4 m Batang 24,000Pekerja OH 5,300Tukang batu OH 0,275Tukang kayu OH 1,300Tukang besi OH 1,050Kepala tukang OH 0,262Tenaga kerjaMandor OH 0,265“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 19. SNI 7394:200813 dari 166.34 Membuat 1 m3dinding beton bertulang (200 kg besi + bekisting)Kebutuhan Satuan IndeksKayu kelas III m30,250Paku 5 cm – 12 cm kg 3,000Minyak bekisting Liter 1,200Besi beton polos kg 210,000Kawat beton kg 3,000PC kg 336,000PB m30,540KR m30,810Kayu kelas II balok m30,105Plywood 9 mm Lembar 2,500BahanDolken kayu galam,φ (8-10) cm, panjang 4 m Batang 14,000Pekerja OH 5,650Tukang batu OH 0,275Tukang kayu OH 1,560Tukang besi OH 1,400Kepala tukang OH 0,323Tenaga kerjaMandor OH 0,2836.35 Membuat 1 m’kolom praktis beton bertulang (11 x 11) cmKebutuhan Satuan IndeksKayu kelas III m30,002Paku 5 cm – 12 cm kg 0,010Besi beton polos kg 3,000Kawat beton kg 0,045PC kg 4,000PB m30,006BahanKR m30,009Pekerja OH 0,180Tukang batu OH 0,020Tukang kayu OH 0,020Tukang besi OH 0,020Kepala tukang OH 0,006Tenaga kerjaMandor OH 0,009“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 20. SNI 7394:200814 dari 166.36 Membuat 1 m’ring balok beton bertulang (10 x 15) cmKebutuhan Satuan IndeksKayu kelas III m30,003Paku 5 cm – 12 cm kg 0,020Besi beton polos kg 3,600Kawat beton kg 0,050PC kg 5,500PB m30,009BahanKR m30,015Pekerja OH 0,297Tukang batu OH 0,033Tukang kayu OH 0,033Tukang besi OH 0,033Kepala tukang OH 0,010Tenaga kerjaMandor OH 0,015“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 21. SNI 7394:200815 dari 16Lampiran A(Informatif)Contoh penggunaan standar untuk menghitung satuan pekerjaanA.1 Membuat 1 m3beton f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87Kebutuhan Satuan IndeksHarga SatuanBahan/Upah(Rp.)Jumlah(Rp.)PC kg 247.000 400 98.800PB kg 869 63 54.747KR maks. 30 mm kg 999 57 56.943BahanAir liter 215 5 1.075Pekerja OH 1.650 30.000 49.500Tukang batu OH 0.275 40.000 11.000Kepala tukang OH 0.028 50.000 1.400TenagakerjaMandor OH 0,083 60.000 4.980Jumlah harga per satuan pekerjaan 278.445“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”
  • 22. SNI 7394:200816 dari 16BibliografiSNI 03-2834-2000, Tata cara pembuatan rencana campuran beton normalSNI 03-3976-1995, Tata cara pengadukan pengecoran betonSNI 03-2847-1992, Tata cara penghitungan struktur beton untuk bangunan gedungSNI 03-2445-1991, Spesifikasi ukuran kayu untuk bangunan rumah dan gedungSNI 03-2495-1991, Spesifikasi bahan tambahan untuk betonSNI 03-6861.1-2002, Spesifikasi bahan bangunan bagian A (Bahan bangunan bukan logam)SNI 03-6861.2-2002, Spesifikasi bahan bangunan bagian B (Bahan bangunan dari besi/baja)SNI 03-6861.3-2002, Spesifikasi bahan bangunan bagian C (Bahan bangunan dari logambukan besi)Pusat Penelitian dan Pengembangan Permukiman, Analisa Biaya Konstruksi (hasilpenelitian), tahun 1988–1991.“HakCiptaBadanStandardisasiNasional,Copystandarinidibuatuntukpenayangandiwebsitedantidakuntukdikomersialkan”