Your SlideShare is downloading. ×
Kbe parking structures
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Kbe parking structures

158

Published on

This is our new parking brochure.

This is our new parking brochure.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
158
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. parking structuresCora Harkins, Manager of Business DevelopmentP: 860.284.7622E: charkins@kbebuilding.com
  • 2. DESIGN-BUILDER | CONSTRUCTION MANAGER | GENERAL CONTRACTOR For clients in Municipal, Retail, Education, Senior Living, Hospitality, Corporate, and Federal marketsCONNECTICUT | NORTHEAST REGION & MARYLAND | MID-ATLANTIC REGION
  • 3. about kbe :: capabilitiesa trusted partnerThrough our diverse experience, KBE Building Corporation can support the many construction needs of parking structures. Ourpreconstruction and construction experience includes work in municipal, university, retail, and senior living facilities.KBE is committed to being a trusted construction partner for our clients and design teams. That trust is built on the integrityand experience of our people, and our many years of proven performance for hundreds of clients throughout Connecticut, theNortheast, and the Mid-Atlantic US.a successful construction firm with integrity � KBE is a 54-year-old construction services firm with projects throughout New England and Mid Atlantic, and more than $2.3 billion in construction volume over the last decade. � Highly experienced Design-Builder, CM at Risk, CM as Advisor, and General Contractor. � Committed to putting communities to work and exceeding our client’s SBE/MBE/WBE goals. � One of the region’s largest merit shop construction firms. KBE offers our clients access to an extensive pool of qualified trade contracting firms, regardless of union or non-union affiliation, providing our clients with the most competitive pricing from the best qualified firms.expert in-house staff � Staff of 120+ experienced construction professionals and support staff. � Preconstruction and Estimating Groups with Certified Professional Estimators and Specialists in BIM, Site, and Mechanical/ Electrical. � 16 LEED Accredited Professionals, including Preconstruction and Construction staff.experienced in... � Design|Build, Construction Management and General Contracting, with in-depth Preconstruction Planning Services. � Partnering, LEED/Sustainable Design, Building Information Modeling, and Quality Control.proven management processesWe initiate expansive communication throughout the Preconstruction and Construction process utilizing: � Leading-edge web-based communication subcontractor and online plan room portals providing access to all project team members. � Technology focus - we support our clients, staff and projects utilizing multiple software resources.safety � Award winning safety program and performance. � Experience Modification Rate significantly better then industry average of 1.0. � All field staff are OSHA 30-Hour Certified for Construction Safety.
  • 4. science park Parking garage New Haven, CT Winstanley Construction Management, LLC owner New Haven, CT BL Companies architect Meriden, CT services Design-Build Constructor cost $37.3 million 1,186 car structured parking; 5-story size/scope 22,700 sf retail space schedule Aug 2008 to Oct 2009 The precast garage provides parking for 1,186 cars and supports the parking needs of tenants at the nearby 25 Science Park office building and surrounding area. Thedescription facility includes an additional 22,700 sf of street-level retail space for stores and restaurants. Science Park Parking Garage is set on an 80+ acre setting of industrial reuse land and buildings located near Yale’ University’s Science Hill.
  • 5. summer place parking garage Stamford, CT City of Stamford owner Stamford, CT BL Companies architect Meridan, CT services Design-Builder cost $13 million 158,004 sf size/scope 498-car, 5-story schedule May 2005 to Mar 2006 Set on a challenging site, adjacent and abutting an existing retail center. Thedescription elevator core was separated from the garage proper and enclosed by a decorative multi-colored curtain wall along its front.
  • 6. Stamford Courthouse garage Stamford, CT State of Connecticut, Department of Construction Services owner Hartford, CT BL Companies architect Meriden, CT services Design-Builder and Constructor cost $9.2 million 167,525 sf size/scope 509 parking spaces, 6-levels schedule Feb 2005 to Sep 2005 The precast concrete superstructure is set on cast-in-place concrete foundations, with precast concrete shear walls for lateral force resistance. Openings have been provided in interior shear walls for passive security. One and a half levels of the new garage are set below grade, incorporating the required fire protectiondescription and ventilation measures. In the southeast corner, the new garage ties in at two levels of the existing underground parking facility. At the area of tie-in, the new facility spans the existing structure to avoid applying additional loads to the existing parking structure. Landscaping for the site has been designed for minimal maintenance and to preserve the open green space.
  • 7. whitney center, parking garage and continuing care retirement community Hamden, CT Whitney Center, owner Handen, CT SFCS, Inc. architect Roanoke, VA services Construction Manager at Risk cost $50.6 million size/scope 195,000 sf 7- story addition, and 2-level parking garage schedule Jan 2010 to Aug 2011 2-level parking garage, new maintance garage and shop, renovation of multiple floors and areas of existing senior living facility, including kitchen/dining facilities, community center, and administrative offices. New addition of bistro, bank, library,description salon, and restrooms. Upgrade of all related MEP and building systems. New addition provides 87 one- and two- bedroom living units, including all interior fit- out.
  • 8. danbury police headquarters with parking garage Danbury, CT City of Danbury owner Danbury, CT architect Jacunksi Humes Architects, LLC services General Contractor cost $26.3 million size/scope 74,839 sf schedule Aug 2007 Apr 2009 The new high-tech facility, with its graceful, 3-story Victorian-style aesthetic, provides both an engaging visual appeal and a high-visibility icon of public safety and security. Interior features include a shooting range, 26-cell detention facility, bulletdescription resistant sheathing, separate public areas, operational areas, high-density storage systems, central 911 dispatch for both fire and police, integrated security system. Exterior features include 5 vehicle bays, 2 bay sally port, CID lab, 3,000 sf precast parking deck with parking for 73 vehicles, and dual fuel mechanical systems, and landscaped plaza.
  • 9. western connecticut state university centennial hall parking garage and residence hall Danbury, CT State of Connecticut, Department of Construction Services owner Hartford, CT Newman Architects architect New Haven, CT services Design-Builder and Constructor cost $27 million 450-car parking garage size/scope 128,000 sf residence hall schedule Oct 2003 to Oct 2004noteworthy LEED-NC-v2 Certification Design-Builder and Constructor for the 450-car, five-story, precast parking garage with adjacent 128,000 sf residence hall . Responsibilities included all related sitework, pre-cast wall-and-plank with traditional masonry, glass curtain walls,description cold formed metal roof trusses, attic window freezes and all interiors. The parking structure is an open pre-cast spandrel system with a concrete frame. 11-month construction schedule.
  • 10. sheraton hotel and parking garage Windsor Locks, CT R K Bradley Associates owner West Hartford, CT Steven S. Cohen Architects architect Princeton, NJ services Construction Manager cost $28 million size/scope 300-car garage, 240 hotel rooms 300-car, two-level, below-grade precast parking garage and 240-room precast hotel. The garage houses the main electrical room for the garage and hotel as well as a large holding tank for the hotel sprinkler system. The first garage level is set on grade, and the second level precast double tee. The foundations for the garage perimeter is conventional spread footings. The central garage area supports the hotel with a six-foot thick concrete mat, which was constructed in a single continuous pour. The garage features open air ventilation and is fully sprinklered. The double-tees below the occupied hotel floors were sprayed with insulatingdescription material The Sheraton Hotel is set between Terminals A and B of Bradley International Airport. Clear communication and intricate coordination among team members, as well as with the contractor for Terminal A, the FAA and the Aeronautics Division of the Connecticut DOT, was crucial to ensure the success of these concurrent construction projects.
  • 11. bishop corner Parking garage West Hartford, CT E A Northeast Limited Partners owner Columbia, SC Hoffman Architects architect North Haven, CT services General Contractor cost $2.5 million size/scope 450 car, 110,000 sf garage schedule Dec 1998 to Mar 1999 Renovation of a 110,000 sf, 2-story parking garage. Scope of work included removal of the composite concrete slabs over metal deck, and replacement with newdescription G-90 galvanized metal decking and concrete slabs that included admixtures to strengthen and enhance durability. Existing steel was cleaned and blasted, and repainted with special Tnemac coating.
  • 12. www.kbebuilding.comBusiness Offices: 30 Batterson Park Road 7150 Columbia Gateway Drive, Suite A Farmington, CT 06032 Columbia, MD 21046 P: 860.284.7110 P: 410.910.1028

×