SlideShare a Scribd company logo
1 of 14

Anti-Termite Treatment

Anti-Termite Treatment
1. Scope
2. Health Hazards and Safety Measures
3. Codes and Standards
4. General requirements
5. Site Preparation
6. Materials
7. Mode of Application and Rate of Application
8. Treatment for Masonry Foundations & Basement
9. Treatment for RCC Foundation & Basement
10.Junction of Walls and Floors
11.Precautions During and After Treatment
12.Mode of Measurement
List of Contents
1. All chemical used for anti-termite treatment are poisonous and hazardous
to health.
2. Keep the containers closed and secured.
3. Wear protective clothing while handling the chemicals.
4. Avoid flames in the vicinity during mixing.
5. Never allow treatment chemicals to contaminate sources of drinking water.
6. Follow instructions provided by the manufacturer in the MSDS ( Material
Safety Data Sheet ).
7. In case of poisoning take remedial measures according to the MSDS
provided by the manufacturer and as per IS 4015.
2. Health Hazards and Safety Measures
Anti-Termite Treatment
1. Scope
How to Carry out of Pre-Constructional Anti-Termite
Chemical Treatment for the Building.

3. IS 6313 Part 3 – Treatment for Existing Buildings
2. IS 6313 Part 2 – Pre-Constructional Anti-Termite Measures in Buildings
1. IS 6313 Part 1 – Constructional Measures
IS 6313 - Code of practice for anti-termite measures in buildings.
3. Codes & Standards
Anti-Termite Treatment
This Presentation is Specific to IS 6313 Part 2

4. Submit Material Specification and MSDS to EIC before start of work
3. Follow Indian Standard Safety Code and Site Specific Safety rules
2. Anti-termite treatment should be carried out in the early stages of
construction of buildings:- Start from substructure and up to plinth
level.
1. Anti-termite treatment is a specialist job: Use only specialized
agencies for carrying out anti-termite treatment preferably a member
of Indian Pest Control Association.
4. General Requirements
Anti-Termite Treatment
1. Remove all organic matter, construction debris, rubbish etc.
2. Water logged foundations shall be treated after drying when the soil is
absorbent.
3. For low penetration and slopping sites, surface to be scarified 75mm
depth.
4. Complete all cutting, excavation, leveling & grading before starting
treatment .
5. Site Preparation
Anti-Termite Treatment
1. Chloropyriphos 20% EC bearing ISI certification .
2. Dilute 1 part of Chloropyriphos 20% EC with 19 part of water to get 1%
emulsion.
3. Indian pest control association approved chemical shall be used.
4. Contractor shall submit purchase vouchers to EIC for verification.
6. Materials
Anti-Termite Treatment
1. Chemical emulsion should be applied uniformly by sprayers.
2. Specified rates should be applied at each stages of treatment.
3. Pressure pumps and sprayers of adequate capacity shall be used for proper
penetration of chemical.
7. Mode of Application and Rate of Application
Anti-Termite Treatment

1. Foundations shall be completely
enveloped with chemical barrier.
2. Treatment shall be from sub
structure to plinth surface
3. Apply emulsion @ 5 Ltrs/ Sqm
for normal load bearing
structures
4. Vertical surfaces @ 7.50
Ltrs/Sqm.
Legend
A - Bottom and sides of trench
B - Backfill in immediate contact
with foundation wall
C - Junction of wall and floor
D- External perimeter of building
8. Treatment for Masonry Foundations & Basement
Anti-Termite Treatment
7.50
Ltrs/Sqm
5
Ltrs/Sqm

Treatment in Foundation Trenches:
 In case of normal wall load bearing structures, columns
pits, wall trenches and basement, the treatment shall be at 5
litres/sqm. or surface area of the bottom and sides to a
height of at least 300mm.
 After the foundation work, the sides shall be treated at 7.5
litres/sqm. of vertical surface of substructure on each side.
 After the earth filling is done, treatment shall be done by
rodding the earth at 150mm centres close to wall surface
and spraying the chemical with the above dose i.e. 7.5
litres/sqm.
 In case of framed structure, the treatment shall start at a
depth of 500mm below ground level. From this depth the
backfill around the columns, beams and R.C.C. basement
walls shall be treated at 7.5 litres / sqm. of the vertical and
at 5 litres / sqm. for the horizontal surface at the bottom in
the trenches / pits.

9. Treatment for RCC Foundations & Basement
1. Treatment shall start at a depth of 500
mm below the ground level/FML.
2. Apply emulsion for vertical surfaces @
7.50 Ltrs/Sqm.
Legend
A - Min 500 mm below ground level/FML
B - Plinth Filling
D- FML to Grade Beam top
E - FFL to Plinth beam top
NGL - Natural Ground Level
FML - Formation Level
500 mm
below
NGL/FML
7.50
Ltrs/Sqm
Anti-Termite Treatment

11. Junction of the Wall and Floors
Anti-Termite Treatment
1. Continuity of vertical chemical barrier on inner wall surface from ground level
to finished floor level is required.
2. Treatment shall be carried out by
i. Placing a channel of 30x30 mm at all junctions of wall and columns with
floor before sub grade is laid.
ii. Make holes using 12 mm dia rod@ 150mm c/c and breakup the earth up
to ground level.
iii. Pour chemical emulsion into the holes @ 7.5 Lit/Sqm.
iv. Tamp back the soil into the channel and consolidate the earth.

1. Care to ensure that the chemical barrier is
complete and continuous.
2. The treatment shall not be carried out
when it is raining or when the soil is wet.
3. Treated soil surface shall not be
disturbed.
4. Take immediate steps to restore the
continuity and completeness of the barrier
system if treated soil gets disturbed.
18. Precautions During and After Treatment
Anti-Termite Treatment
SPRAYING EQUIPMENT
•A pressure pump shall be used to carry out spraying operations to facilitate proper
penetration of chemical into the earth.
The chemicals, concentration and dosage for horizontal and vertical surfaces are based
on the IS code of practice for Anti-termite measures in Buildings. IS 6313 (Part-II).
PRECAUTIONS DURING MONSOON
•No spraying shall be carried out when it rains. Treatment should be repeated in plinth
areas if it rains immediately after a spraying operation and before the emulsion has
soaked into the soil.

1. Measurement shall be made in Sq.mtr on the basis of plinth area of the
building.
20. Mode of Measurement
Anti-Termite Treatment
1. Rate includes the cost of materials, labour and all tools, plants, sprayers
and safety equipments required for complete operation.

More Related Content

What's hot

Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircasesKHUSHBU SHAH
 
Basement construction report
Basement construction reportBasement construction report
Basement construction reportANKITAARORA85
 
Classification of building based on occupancy and type of construction
Classification of building based on occupancy and type of constructionClassification of building based on occupancy and type of construction
Classification of building based on occupancy and type of constructionritubharti6
 
Functional Planning of a Building
 Functional Planning of a Building Functional Planning of a Building
Functional Planning of a BuildingMr. Ramesh Nayaka
 
How to install false ceiling
How to install false ceilingHow to install false ceiling
How to install false ceilingcristinadc112730
 
Dampness in buildings
Dampness in buildingsDampness in buildings
Dampness in buildingsAshar Gill
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildingsSimarpreet Singh
 
Precast construction
Precast constructionPrecast construction
Precast constructionDivya Vishnoi
 
Passive fire measures vs active fire measues
Passive fire measures vs active fire measuesPassive fire measures vs active fire measues
Passive fire measures vs active fire measuesKamran Hassan
 
Forms of aluminium
Forms of aluminiumForms of aluminium
Forms of aluminiumpam_21
 
Underpinning presentation chakamba
Underpinning presentation  chakambaUnderpinning presentation  chakamba
Underpinning presentation chakambaJohn Chakamba
 

What's hot (20)

Shoring
ShoringShoring
Shoring
 
Details of roofs and floors
Details of roofs and floorsDetails of roofs and floors
Details of roofs and floors
 
Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircases
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Roofs
RoofsRoofs
Roofs
 
Building finishes
Building finishesBuilding finishes
Building finishes
 
Classification of building based on occupancy and type of construction
Classification of building based on occupancy and type of constructionClassification of building based on occupancy and type of construction
Classification of building based on occupancy and type of construction
 
Functional Planning of a Building
 Functional Planning of a Building Functional Planning of a Building
Functional Planning of a Building
 
How to install false ceiling
How to install false ceilingHow to install false ceiling
How to install false ceiling
 
Dampness in buildings
Dampness in buildingsDampness in buildings
Dampness in buildings
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
 
Precast construction
Precast constructionPrecast construction
Precast construction
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 
Foundation ppt
Foundation pptFoundation ppt
Foundation ppt
 
R.C.C. STAIRS
R.C.C. STAIRSR.C.C. STAIRS
R.C.C. STAIRS
 
Passive fire measures vs active fire measues
Passive fire measures vs active fire measuesPassive fire measures vs active fire measues
Passive fire measures vs active fire measues
 
Forms of aluminium
Forms of aluminiumForms of aluminium
Forms of aluminium
 
Underpinning presentation chakamba
Underpinning presentation  chakambaUnderpinning presentation  chakamba
Underpinning presentation chakamba
 
Control on termites (white ants)in buildings
Control on termites (white ants)in buildingsControl on termites (white ants)in buildings
Control on termites (white ants)in buildings
 

Similar to Anti termite treatment

Special Treatments for Building construction
Special Treatments for Building construction Special Treatments for Building construction
Special Treatments for Building construction Er.Karan Chauhan
 
Special Treatments required for building construction
Special Treatments required for building constructionSpecial Treatments required for building construction
Special Treatments required for building constructionUjasPandya2
 
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...musadoto
 
Enlio Sports Flooring installation
Enlio Sports Flooring installationEnlio Sports Flooring installation
Enlio Sports Flooring installationFeng Jack
 
Pamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdfPamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdfpanchalt755
 
A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingIRJET Journal
 
RIW Cementflex Datasheet
RIW Cementflex DatasheetRIW Cementflex Datasheet
RIW Cementflex DatasheetRIW Ltd
 
Epoxy Flooring Procedure
Epoxy Flooring ProcedureEpoxy Flooring Procedure
Epoxy Flooring ProcedureKalpesh Satpute
 
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...Kiran Shinde
 
Method statement honycomb repairing
Method statement  honycomb repairingMethod statement  honycomb repairing
Method statement honycomb repairingBharatha Rathnayke
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxHirenThakkar31
 

Similar to Anti termite treatment (20)

03 anti-termite treatment
03 anti-termite treatment03 anti-termite treatment
03 anti-termite treatment
 
Anti termite
Anti termiteAnti termite
Anti termite
 
TERMITES CONTROL SERVICES IN KENYA
TERMITES CONTROL SERVICES IN KENYATERMITES CONTROL SERVICES IN KENYA
TERMITES CONTROL SERVICES IN KENYA
 
Special Treatments for Building construction
Special Treatments for Building construction Special Treatments for Building construction
Special Treatments for Building construction
 
Special Treatments required for building construction
Special Treatments required for building constructionSpecial Treatments required for building construction
Special Treatments required for building construction
 
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
 
Enlio Sports Flooring installation
Enlio Sports Flooring installationEnlio Sports Flooring installation
Enlio Sports Flooring installation
 
ioc_2
ioc_2ioc_2
ioc_2
 
Pamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdfPamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdf
 
A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment Building
 
Introduction to linings
Introduction to liningsIntroduction to linings
Introduction to linings
 
RIW Cementflex Datasheet
RIW Cementflex DatasheetRIW Cementflex Datasheet
RIW Cementflex Datasheet
 
Column & beam
Column & beamColumn & beam
Column & beam
 
Epoxy Flooring Procedure
Epoxy Flooring ProcedureEpoxy Flooring Procedure
Epoxy Flooring Procedure
 
Epoxy Flooring
Epoxy FlooringEpoxy Flooring
Epoxy Flooring
 
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
 
sample.pptx
sample.pptxsample.pptx
sample.pptx
 
Method statement honycomb repairing
Method statement  honycomb repairingMethod statement  honycomb repairing
Method statement honycomb repairing
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptx
 
Godown management
Godown managementGodown management
Godown management
 

Recently uploaded

Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectGayathriM270621
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 

Recently uploaded (20)

Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subject
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 

Anti termite treatment

  • 2.  Anti-Termite Treatment 1. Scope 2. Health Hazards and Safety Measures 3. Codes and Standards 4. General requirements 5. Site Preparation 6. Materials 7. Mode of Application and Rate of Application 8. Treatment for Masonry Foundations & Basement 9. Treatment for RCC Foundation & Basement 10.Junction of Walls and Floors 11.Precautions During and After Treatment 12.Mode of Measurement List of Contents
  • 3. 1. All chemical used for anti-termite treatment are poisonous and hazardous to health. 2. Keep the containers closed and secured. 3. Wear protective clothing while handling the chemicals. 4. Avoid flames in the vicinity during mixing. 5. Never allow treatment chemicals to contaminate sources of drinking water. 6. Follow instructions provided by the manufacturer in the MSDS ( Material Safety Data Sheet ). 7. In case of poisoning take remedial measures according to the MSDS provided by the manufacturer and as per IS 4015. 2. Health Hazards and Safety Measures Anti-Termite Treatment 1. Scope How to Carry out of Pre-Constructional Anti-Termite Chemical Treatment for the Building.
  • 4.  3. IS 6313 Part 3 – Treatment for Existing Buildings 2. IS 6313 Part 2 – Pre-Constructional Anti-Termite Measures in Buildings 1. IS 6313 Part 1 – Constructional Measures IS 6313 - Code of practice for anti-termite measures in buildings. 3. Codes & Standards Anti-Termite Treatment This Presentation is Specific to IS 6313 Part 2
  • 5.  4. Submit Material Specification and MSDS to EIC before start of work 3. Follow Indian Standard Safety Code and Site Specific Safety rules 2. Anti-termite treatment should be carried out in the early stages of construction of buildings:- Start from substructure and up to plinth level. 1. Anti-termite treatment is a specialist job: Use only specialized agencies for carrying out anti-termite treatment preferably a member of Indian Pest Control Association. 4. General Requirements Anti-Termite Treatment
  • 6. 1. Remove all organic matter, construction debris, rubbish etc. 2. Water logged foundations shall be treated after drying when the soil is absorbent. 3. For low penetration and slopping sites, surface to be scarified 75mm depth. 4. Complete all cutting, excavation, leveling & grading before starting treatment . 5. Site Preparation Anti-Termite Treatment
  • 7. 1. Chloropyriphos 20% EC bearing ISI certification . 2. Dilute 1 part of Chloropyriphos 20% EC with 19 part of water to get 1% emulsion. 3. Indian pest control association approved chemical shall be used. 4. Contractor shall submit purchase vouchers to EIC for verification. 6. Materials Anti-Termite Treatment
  • 8. 1. Chemical emulsion should be applied uniformly by sprayers. 2. Specified rates should be applied at each stages of treatment. 3. Pressure pumps and sprayers of adequate capacity shall be used for proper penetration of chemical. 7. Mode of Application and Rate of Application Anti-Termite Treatment
  • 9.  1. Foundations shall be completely enveloped with chemical barrier. 2. Treatment shall be from sub structure to plinth surface 3. Apply emulsion @ 5 Ltrs/ Sqm for normal load bearing structures 4. Vertical surfaces @ 7.50 Ltrs/Sqm. Legend A - Bottom and sides of trench B - Backfill in immediate contact with foundation wall C - Junction of wall and floor D- External perimeter of building 8. Treatment for Masonry Foundations & Basement Anti-Termite Treatment 7.50 Ltrs/Sqm 5 Ltrs/Sqm
  • 10.  Treatment in Foundation Trenches:  In case of normal wall load bearing structures, columns pits, wall trenches and basement, the treatment shall be at 5 litres/sqm. or surface area of the bottom and sides to a height of at least 300mm.  After the foundation work, the sides shall be treated at 7.5 litres/sqm. of vertical surface of substructure on each side.  After the earth filling is done, treatment shall be done by rodding the earth at 150mm centres close to wall surface and spraying the chemical with the above dose i.e. 7.5 litres/sqm.  In case of framed structure, the treatment shall start at a depth of 500mm below ground level. From this depth the backfill around the columns, beams and R.C.C. basement walls shall be treated at 7.5 litres / sqm. of the vertical and at 5 litres / sqm. for the horizontal surface at the bottom in the trenches / pits.
  • 11.  9. Treatment for RCC Foundations & Basement 1. Treatment shall start at a depth of 500 mm below the ground level/FML. 2. Apply emulsion for vertical surfaces @ 7.50 Ltrs/Sqm. Legend A - Min 500 mm below ground level/FML B - Plinth Filling D- FML to Grade Beam top E - FFL to Plinth beam top NGL - Natural Ground Level FML - Formation Level 500 mm below NGL/FML 7.50 Ltrs/Sqm Anti-Termite Treatment
  • 12.  11. Junction of the Wall and Floors Anti-Termite Treatment 1. Continuity of vertical chemical barrier on inner wall surface from ground level to finished floor level is required. 2. Treatment shall be carried out by i. Placing a channel of 30x30 mm at all junctions of wall and columns with floor before sub grade is laid. ii. Make holes using 12 mm dia rod@ 150mm c/c and breakup the earth up to ground level. iii. Pour chemical emulsion into the holes @ 7.5 Lit/Sqm. iv. Tamp back the soil into the channel and consolidate the earth.
  • 13.  1. Care to ensure that the chemical barrier is complete and continuous. 2. The treatment shall not be carried out when it is raining or when the soil is wet. 3. Treated soil surface shall not be disturbed. 4. Take immediate steps to restore the continuity and completeness of the barrier system if treated soil gets disturbed. 18. Precautions During and After Treatment Anti-Termite Treatment SPRAYING EQUIPMENT •A pressure pump shall be used to carry out spraying operations to facilitate proper penetration of chemical into the earth. The chemicals, concentration and dosage for horizontal and vertical surfaces are based on the IS code of practice for Anti-termite measures in Buildings. IS 6313 (Part-II). PRECAUTIONS DURING MONSOON •No spraying shall be carried out when it rains. Treatment should be repeated in plinth areas if it rains immediately after a spraying operation and before the emulsion has soaked into the soil.
  • 14.  1. Measurement shall be made in Sq.mtr on the basis of plinth area of the building. 20. Mode of Measurement Anti-Termite Treatment 1. Rate includes the cost of materials, labour and all tools, plants, sprayers and safety equipments required for complete operation.