Ceezali
Upcoming SlideShare
Loading in...5
×
 

Ceezali

on

  • 1,423 views

 

Statistics

Views

Total Views
1,423
Views on SlideShare
1,423
Embed Views
0

Actions

Likes
0
Downloads
15
Comments
0

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Ceezali Ceezali Presentation Transcript

  • PRESENTED BY :ARC. A. A. OSEZAY (M.D) CEEZALI
  • •  Name: Arc. A. Aliyu Osezay (CEO Ceezali Ltd, Abuja-Nigeria)•  Project: Masaka-Mpape, Abuja Road (and Adjoining Districts)•  PROJECT NEEDS: Equipment: Dozers, Graders, Loaders, Batching Plant, Asphalt Plant and Pavers. Financing: Ceezali Ltd, First Bank Plc, FCT, and Investors. Partners: Ceezali Ltd, First Bank Plc and FCT.
  • Summary:•  The proposed Masaka-Mpape, Abuja Ring Road is to serve as a connecting route from Masaka in Nasarawa State via Mpape to Abuja. The total length of the road is approximately 26 km; and the duration of the road project is 2 years. d   c   b a
  • road    layout  
  • Objective:•  To decongest Abuja-Keffi Road which is causing a colossal loss of lives as a result of incessant traffic accidents; loss of man-hour in productivity; and stress, arising from locked-up traffic. The traffic logjam on this road deteriorates during the morning and evening rush hours.
  • •  The high density of the population along Abuja-Keffi road axis contributes significantly to the chaotic traffic situation.
  • •  The construction of the proposed Masaka-Mpape Ring Road will achieve the following. 1. Provide an alternative route for commuters and travelers. 2. Minimize security threats posed by the over-flow of heavy traffic around the Three Arms Zone, where the seat of government is located 3. Open up vast area for the development of additional Districts.
  • district  layout  
  • Name of Project:•  MASAKA-MPAPE, ABUJA RING ROAD(and Adjoining Districts)Location:•  The Road starts from Masaka, Nasarawa State via Mpape to Abuja, FCT d   a   a
  • satellite  map  
  • Project Implementation:•  The Federal Government of Nigeria is responsible for the Implementation of the Project.Total Project Cost:•  N24Billion ($150Million)Project Structure:•  DBT(Design Build and Transfer)Economic Benefit:•  The project will generate 500 employment during the construction period•  Open up new Districts to attract investors•  Generate more revenue to the Federal Capital Territory of Nigeria
  • If you have questions, comments or suggestion, please don’t hesitate to contact: Ceezali Limited, No 24, Thabatsaka, By Britsh Village, Wuse II, Abuja FCT, Nigeria Tel: +2348033325553, +2348078756968 www.ceezali.com ceo@ceezali.com