BIM-onomicsCeilidh Higgins & Rodd Perey
over 40,000m2of fitoutover 3,000hotel rooms
lone BIM
why BIM?
clients want it?
industrystandard?
efficiency?
why we BIM?
butwhatBIM?
1we use revit
23d modelling
3clash detection
4 model checking
5documentation
6specifications
74d scheduling
85d cost
9database
10shop detailing
11facilities
do youknowwhat BIMyou offer?
BIM = deliverables
BIM-onomics?
know your BIM
leverage information
and automationfinish plans – why use a colour fill? with a material its there in 3D
continuous improvement
project workflows
BIM impacts on1.resources2.program3.quality checking
resources
smaller smarter teams
knowledge mix
everyone ispart of“BIM team”
program
what information when
milestones change
quality checking
less manual checking
more final checking
drawings to check the BIM
BIM to check the BIM
project examples
Canberra Novotelproject 1 hotel
AutoCAD Revit$20M Project Value $30M89 Sheets 130695 hrs Concept Design 371 hrs371 hrs Schematic Design 447 hrs594 hrs Des...
AutoCAD Revit$20M Project Value $30M2.9% Billed 3.0%1.95% Labour Cost 1.39%67.2% Labour / Revenue 46.3%financial comparison
Modelling/drafting hours
efficiency gains on revit
project 2 fitout
labour comparisonDescriptionProject SizeSoftwareNo of DrawingsProject Director/QA 115 Project Team/Hours Project Director/...
hours per team member
fee proposals
define your BIM1
define third party inputs2
understand the impactson workflows3
$ / drawing nolonger apply
BIMwinswork
the BIG question
the answer
it depends BUT
to deliver thesame it shouldcostless
Questions?
Office (clipped) by JK5854 - http://www.flickr.com/photos/julishannon/2332995831/sizes/o/3 monkeys by KLW NFC (clipped) - ...
Water flow – istock 000009295243Alarm clock by kobiz7 (clipped) - http://www.flickr.com/photos/27369469@N08/2661018158/siz...
Upcoming SlideShare
Loading in …5
×

BIM-onomics slidedeck

1,734 views

Published on

“BIM-onomics: how will BIM change the business of design?” We all know that BIM takes design to the next level, but how does it change your business? We will look at how by embracing BIM not just as a design tool, but as a completely new way of working will change the way we operate as a business. In this presentation, we will look at potential business challenges, analyse project data, and suggest strategies to prepare your organisation for changes to your underlying business model in the face of a new BIM-driven industry. This presentation will use business examples and discuss the challenges from the perspective of different practices and project scales.

Published in: Business, Technology
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,734
On SlideShare
0
From Embeds
0
Number of Embeds
13
Actions
Shares
0
Downloads
81
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

BIM-onomics slidedeck

  1. 1. BIM-onomicsCeilidh Higgins & Rodd Perey
  2. 2. over 40,000m2of fitoutover 3,000hotel rooms
  3. 3. lone BIM
  4. 4. why BIM?
  5. 5. clients want it?
  6. 6. industrystandard?
  7. 7. efficiency?
  8. 8. why we BIM?
  9. 9. butwhatBIM?
  10. 10. 1we use revit
  11. 11. 23d modelling
  12. 12. 3clash detection
  13. 13. 4 model checking
  14. 14. 5documentation
  15. 15. 6specifications
  16. 16. 74d scheduling
  17. 17. 85d cost
  18. 18. 9database
  19. 19. 10shop detailing
  20. 20. 11facilities
  21. 21. do youknowwhat BIMyou offer?
  22. 22. BIM = deliverables
  23. 23. BIM-onomics?
  24. 24. know your BIM
  25. 25. leverage information
  26. 26. and automationfinish plans – why use a colour fill? with a material its there in 3D
  27. 27. continuous improvement
  28. 28. project workflows
  29. 29. BIM impacts on1.resources2.program3.quality checking
  30. 30. resources
  31. 31. smaller smarter teams
  32. 32. knowledge mix
  33. 33. everyone ispart of“BIM team”
  34. 34. program
  35. 35. what information when
  36. 36. milestones change
  37. 37. quality checking
  38. 38. less manual checking
  39. 39. more final checking
  40. 40. drawings to check the BIM
  41. 41. BIM to check the BIM
  42. 42. project examples
  43. 43. Canberra Novotelproject 1 hotel
  44. 44. AutoCAD Revit$20M Project Value $30M89 Sheets 130695 hrs Concept Design 371 hrs371 hrs Schematic Design 447 hrs594 hrs Design Development 604 hrs2726 hrs Construction Docs 1340 hrs104 hrs Variations 73 hrs4490 hrs TOTAL 2836 hrs50.4 Hours per Sheet 21.8-56.8%labour comparison
  45. 45. AutoCAD Revit$20M Project Value $30M2.9% Billed 3.0%1.95% Labour Cost 1.39%67.2% Labour / Revenue 46.3%financial comparison
  46. 46. Modelling/drafting hours
  47. 47. efficiency gains on revit
  48. 48. project 2 fitout
  49. 49. labour comparisonDescriptionProject SizeSoftwareNo of DrawingsProject Director/QA 115 Project Team/Hours Project Director/QA 135Snr Interior Arch 610 Snr Interior Arch 640Arch/ID 355 Arch/ID 410Grad Arch/IDx2 485 Grad Arch/ID 0Drafting 115 Drafting 250Student 260 Student 01940 Total Hours 1435Hours/sheet% Difference in hours/ sheet -60%28.771.93,600m227AutoCADProject No 1Office fitout forGovernment Department50Project No 2Office fitout forGovernment Department3,300m2Revit
  50. 50. hours per team member
  51. 51. fee proposals
  52. 52. define your BIM1
  53. 53. define third party inputs2
  54. 54. understand the impactson workflows3
  55. 55. $ / drawing nolonger apply
  56. 56. BIMwinswork
  57. 57. the BIG question
  58. 58. the answer
  59. 59. it depends BUT
  60. 60. to deliver thesame it shouldcostless
  61. 61. Questions?
  62. 62. Office (clipped) by JK5854 - http://www.flickr.com/photos/julishannon/2332995831/sizes/o/3 monkeys by KLW NFC (clipped) - http://www.flickr.com/photos/klwnfc/6884205838/Office Politics by Alex E Proimos - http://www.flickr.com/photos/proimos/4045973322/Drafting office by Mennonite Church USA Archives - http://www.flickr.com/photos/mennonitechurchusa-archives/7597713652/sizes/o/Time is Money by Tax Credits (clipped) - http://www.flickr.com/photos/76657755@N04/7214503978/Question mark by milos milosevic - http://www.flickr.com/photos/21496790@N06/5065834411/sizes/l/Building Information Models/ Revit logos/packaging from Autodesk websiteModel checking from Solibri websiteGantt chart by Drift Words (clipped) - http://www.flickr.com/photos/drift-words/10434156/sizes/l/Piggy Bank by 401K (clipped) - http://www.flickr.com/photos/68751915@N05/6736154311/in/photostreamLinkedin Maps at http://inmaps.linkedinlabs.com/Shop detailing screen shot from Tekla websiteHead graphic – istock 000003879802Illustra (colours modified)Roll of drawings by Cayusa - http://www.flickr.com/photos/cayusa/465151565/sizes/l/Money (being cut into pieces) by Tax Credits - http://www.flickr.com/photos/76657755@N04/7408506410/Data slide by Bionic teaching (colours modified) - http://www.flickr.com/photos/bionicteaching/2920562020/sizes/o/Ring of black holes by NASAs Marshall Space Flight Centre -http://www.flickr.com/photos/nasamarshall/5431801240/sizes/l/Water flow – istock 000009295243image credits
  63. 63. Water flow – istock 000009295243Alarm clock by kobiz7 (clipped) - http://www.flickr.com/photos/27369469@N08/2661018158/sizes/l/They are Coming by Ð olo - http://www.flickr.com/photos/donsolo/2886355241/sizes/l/Red Line Mark Up from BIM and Integrated Design by Randy DeutschCP3o vs Data by JD Hancock (clipped and recoloured) -http://www.flickr.com/photos/jdhancock/4617759902/sizes/l/Monkey in the Middle by Mark Dumont - http://www.flickr.com/photos/wcdumonts/8265151843/sizes/l/Time jumper by h.koppdelaney - http://www.flickr.com/photos/h-k-d/6171907581/sizes/l/Level of Detail – Thanks to PracticalBIM http://practicalbim.blogspot.com.au/One Down by Cayusa - http://www.flickr.com/photos/cayusa/3190757194/sizes/l/Tools by zzpza - http://www.flickr.com/photos/zzpza/3269784239/sizes/o/And 100 by Marcel Germain - http://www.flickr.com/photos/marcelgermain/2071204651/Calculator by Tax Credits - http://www.flickr.com/photos/68751915@N05/6736184859/sizes/l/in/photostream/BIM guides – Vetrans Affairs (USA), Natspec, Consult AustraliaColoured pencils (clipped) – istock 000019575299Runner by The Happy Rower - http://www.flickr.com/photos/thehappyrower/5821364319/sizes/l/The Thinker by 4johny5 (clipped) - http://www.flickr.com/photos/johnny4ever5/3226486640/sizes/l/Lottery Money by Lisa Brewster (recoloured) http://www.flickr.com/photos/sophistechate/3047006771/Jump by Hamad AL-Mohann - http://www.flickr.com/photos/al-mohanna/5436096181/Project shots, documentation etc – GHD and Architectusimage credits

×