IRRIGATION & FLOOD CONTROL DEPARTMENT (IFCD), MANIPUR Estd. in May, 1976 Assured Irrigation in the state with  Water  Reso...
COMPLETED SCHEMES/ PROJECTS UNDER MAJOR & MEDIUM IRRIGATION [email_address]
Completed Irrigation Projects of IFCD Sl. No. Name of the Projects District Source/ River 1 Loktak Lift Irrigation Bishnup...
1. Loktak Lift Irrigation Project Starting Year :- 1972  Completion Year :- 1989  Cost:- Rs. 28.79 Crore Ultimate Benefits...
PUMP HOUSE NO.1 OF L L I IN OPERATION
MAIN CANAL OF LOKTAK LIFT IRRIGATION IN OPERATION SINCE 1989
2. Imphal Barrage Project Starting Year :- 1975  Completion Year :- 1984  Cost:- Rs. 9.17 Crore <ul><ul><li>5 Bays of equa...
IMPHAL BARRAGE IN OPERATION SINCE 1984
3. Sekmai Barrage Project Starting Year :- 1976  Completion Year :- 1983  Cost:- Rs. 7.70 Crore Present Status:- <ul><ul><...
SEKMAI BARRAGE IN OPERATION SINCE 1983
4. Khoupum Dam Project Starting Year :- 1973  Completion Year :- 1980  Cost:- Rs. 3.05 Crore Ultimate Benefit:- <ul><ul><l...
KHOUPUM DAM IN OPERATION SINCE 1980
5. Singda Multipurpose Project Starting Year :- 1975  Completion Year :- 1995  Cost:- Rs. 68.14 Crore Ultimate Benefit:- <...
SINGDA DAM IN OPERATION SINCE 1995
By the end of VII th  5 year plan Irrigation potential of 59,000 Ha. was created with utilisation of 49200 Ha. By end of V...
<ul><ul><li>IFCD to take up Extension, Renovation and mordanisation (ERM) Projects of the Completed Projects for the resto...
<ul><ul><li>The Projects are completed with major contributions from the District Authorities at the time of Land Compensa...
Upcoming SlideShare
Loading in …5
×

IFCDcompleted

842 views

Published on

Published in: Business, Technology
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
842
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
18
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

IFCDcompleted

  1. 1. IRRIGATION & FLOOD CONTROL DEPARTMENT (IFCD), MANIPUR Estd. in May, 1976 Assured Irrigation in the state with Water Resource Projects Managing Flood Control Works Also creates Potential for: a. Raw Water for Water Supplies b . Hydel Power Committed for:
  2. 2. COMPLETED SCHEMES/ PROJECTS UNDER MAJOR & MEDIUM IRRIGATION [email_address]
  3. 3. Completed Irrigation Projects of IFCD Sl. No. Name of the Projects District Source/ River 1 Loktak Lift Irrigation Bishnupur District Loktak Lake 2 Khoupum Dam Tamenglong District Manchandui river 3 Sekmai Barrage Thoubal District Sekmai River 4 Imphal Barrage Imphal West Imphal River 5 Singda Multipurpose Senapati District Singda River
  4. 4. 1. Loktak Lift Irrigation Project Starting Year :- 1972 Completion Year :- 1989 Cost:- Rs. 28.79 Crore Ultimate Benefits:- Creation of Irrigation potential of 40,000 Ha in Bishnupur and Imphal west Districts by lifting 600 cusecs of water from the canal of Loktak Hydro Electric Project. Present Status :- In operation with irrigation potential of 2050ha in Bishnupur District.
  5. 5. PUMP HOUSE NO.1 OF L L I IN OPERATION
  6. 6. MAIN CANAL OF LOKTAK LIFT IRRIGATION IN OPERATION SINCE 1989
  7. 7. 2. Imphal Barrage Project Starting Year :- 1975 Completion Year :- 1984 Cost:- Rs. 9.17 Crore <ul><ul><li>5 Bays of equal span </li></ul></ul><ul><ul><li>Cross Regulator with 3 Bays </li></ul></ul><ul><ul><li>RMC = 15 Km with discharge of 70 cusecs </li></ul></ul><ul><ul><li>LMC = 4 Km with discharge of 30 cusecs </li></ul></ul>Components:- Ultimate Benefit:- Irrigation Potential of 6.400Ha. Over CCA of 4000Ha. In Imphal West and Thoubal District. Present Status:- In operation with Irrigation potential of 1480Ha . The Imphal Barrage also takes a significant role in the water supply of Imphal
  8. 8. IMPHAL BARRAGE IN OPERATION SINCE 1984
  9. 9. 3. Sekmai Barrage Project Starting Year :- 1976 Completion Year :- 1983 Cost:- Rs. 7.70 Crore Present Status:- <ul><ul><li>45m long with 4 Bays of equal span </li></ul></ul><ul><ul><li>RMC = 6.20 Km with discharge of 1.13 cumecs </li></ul></ul><ul><ul><li>LMC = 15 Km with discharge of 4.80 cumecs </li></ul></ul>Components:- Ultimate Benefit:- Irrigation Potential of 8094Ha. Over a CCA of 4858Ha in Thoubal District In operation with Irrigation Potential of 1850Ha.in Thoubal District
  10. 10. SEKMAI BARRAGE IN OPERATION SINCE 1983
  11. 11. 4. Khoupum Dam Project Starting Year :- 1973 Completion Year :- 1980 Cost:- Rs. 3.05 Crore Ultimate Benefit:- <ul><ul><li>Earthen Dam 530m long, 17.10m high. </li></ul></ul><ul><ul><li>RMC = 10 Km with discharge of 15 cusecs </li></ul></ul><ul><ul><li>LMC = 5 Km with discharge of 7.5 cusecs </li></ul></ul>Components:- Present Status :- Irrigation Potential of 1,000Ha. Over a CCA of 600Ha. In Khoupum Valley of Tamenglong District Irrigation Potential is Nil due to lack of maintenance
  12. 12. KHOUPUM DAM IN OPERATION SINCE 1980
  13. 13. 5. Singda Multipurpose Project Starting Year :- 1975 Completion Year :- 1995 Cost:- Rs. 68.14 Crore Ultimate Benefit:- <ul><ul><li>Earthen Dam 490m long, 60m high. </li></ul></ul><ul><ul><li>Canals:- </li></ul></ul><ul><li>i. 25 cusec canal, 7.04 Km </li></ul><ul><li>ii. 20 cusec canal, 7.02 Km </li></ul><ul><li>iii. 15 cusec canal, 3.85 Km </li></ul>Components:- <ul><ul><li>Irrigation potential of 4148Ha. Over CCA of 2428Ha. In Imphal West </li></ul></ul><ul><ul><li>Water Supply of 4MGD </li></ul></ul>Present Status:- In operation with an Irrigation Potential of 1200Ha. and with water supply of 7-8MGD for Imphal City
  14. 14. SINGDA DAM IN OPERATION SINCE 1995
  15. 15. By the end of VII th 5 year plan Irrigation potential of 59,000 Ha. was created with utilisation of 49200 Ha. By end of VIII th 5 year plan Irrigation potential sharply declined to 24,150 Ha with utilisation of 16,780 Ha for reasons mentioned below:- <ul><ul><li>Human encroachment, siltation of canal beds and damage of structures. </li></ul></ul><ul><ul><li>Restriction in command area for Loktak Lift irrigation, Sekmai Barrage, Imphal Barrage due to inundation of the periphery of Loktak lake </li></ul></ul>Present Irrigation Potentials: <ul><ul><li>Completed Projects:- 6,580 Ha </li></ul></ul><ul><ul><li>Ongoing Projects :- 24,861 Ha Total :- 31,441 Ha </li></ul></ul>
  16. 16. <ul><ul><li>IFCD to take up Extension, Renovation and mordanisation (ERM) Projects of the Completed Projects for the restoration of the ultimate Potentials </li></ul></ul><ul><ul><li>However, the schemes could not be taken up properly due to paucity of funds up to the end of the Xth Plan. </li></ul></ul><ul><ul><li>At present there is provision of Rs. 2 crore for maintenance of completed projects and proposal of Rs. 8 crore under the XIIIth Finance Commission for 3 completed projects viz., Imphal Barrage, Sekmai Barrage and Khoupum Dam Project. </li></ul></ul><ul><ul><li>ERM Schemes for Singda Dam and Loktak Lift Irrigation Project is under preparation with consultation with North Eastern Regional Institute of Water and Land Management (NERIWALM), Tezpur. </li></ul></ul>
  17. 17. <ul><ul><li>The Projects are completed with major contributions from the District Authorities at the time of Land Compensation, disputes and Law and Order Problem and other related significant contributions have been received from the respective District Authorities constantly as and when required. </li></ul></ul>

×