Lpr ppt sept2011
Upcoming SlideShare
Loading in...5
×
 

Lpr ppt sept2011

on

  • 542 views

Lions Park Residences — Presentation Transcript...

Lions Park Residences — Presentation Transcript

1.
2. Project Overview The community that nurtures nature in urban living, Lions Park Residences that offers low-rise condominium units, strategically located near commercial destinations, the Makati and Ortigas business districts as well as the new NAIA 3. The lush surroundings of this urban community boast of amenities such as a multi-purpose hall, a landscaped park, a resort-type swimming pool and a playground complete with a fish pond and a butterfly garden. It also has barbeque pits ideal for family picnics and commercial area for all your various personal needs. Everything you need is just a few steps away from this environment-friendly community, feel secured and at home as you choose from a 1-bedroom, 2-bedroom or 3 bedroom unit. Truly, Lions Park Residences is undoubtedly an excellent investment especially to OFW’s and retirees who are looking for a place to stay or a home to retire in Manila. To address the needs of the home owners, the Quadrillion Property Management (QPMI), the property management team of Lions Park, offers leasing and professional management . Realize your dream home today. Call us at (+632) 710 - 8681 today!* *hotline number during office hours Mike Pacheo - Project Director (+63917) 806 – 9537 mailto:mikepacheo@yahoo.com
3. Site Development Plan W S N E
4.
5. Amenities The Pavilion (actual pictures)
6. Amenities Lap Pool & Kiddie Pool (actual pictures)
7. Amenities (actual pictures) Central Park Koi Pond Children’s Play area Water Bubblers
8. How to get there: At Lions Park Residences, you will not have to worry for everything is just a few meters away. This lush community is strategically located at Sta. Ana Drive, Sun Valley, Parañaque City. It is also accessibly situated near business centers and transportation hubs, only 10-15 minutes to Makati CBD, 25-35 minutes to Ortigas CBD and 5 minutes to the NAIA 2.
9. Building Features Elevated water tanks 24/7 water supply Underground drainage & sewerage system 2.4 meter-wide corridors 2 meter-wide entrance 1 elevator per building Generator for the common areas
10. Affordability Reservation fee starting at P15,000 As low as P12,000 - 15,000 monthly amortization Flexible payment schemes (down payment – payable up to 16 months; balance – payable up to 30 years through Pag-IBIG) Financing through in-house, bank or PAG-IBIG.
11. Unit Features (GOLD) RESIDENTIAL AREA A. Floor Finishes Living, Dining & Kitchen Ceramic tiles with painted baseboard Bedroom Vinyl planks with painted baseboard Toilet Unglazed ceramic tiles B. Wall Finishes With ficemboard partitions Interior walls Painted Finish Toilet Painted paint cement finish above glazed tiles C. Ceiling Finishes Living, Dining & Kitchen Painted plain cement finish Bedrooms Painted plain cement finish Toilet Painted ficemboard finish D. Kitchen Modular Kitchen cabinet with stainless sink and stainless counter top No overhead cabinet. E. Door Entrance & Bedroom door Solid

Statistics

Views

Total Views
542
Slideshare-icon Views on SlideShare
542
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Lpr ppt sept2011 Lpr ppt sept2011 Presentation Transcript

    •  
    • Project Overview
      • The community that nurtures nature in urban living, Lions Park Residences that offers low-rise condominium units, strategically located near commercial destinations, the Makati and Ortigas business districts as well as the new NAIA 3. The lush surroundings of this urban community boast of amenities such as a multi-purpose hall, a landscaped park, a resort-type swimming pool and a playground complete with a fish pond and a butterfly garden. It also has barbeque pits ideal for family picnics and commercial area for all your various personal needs.
      • Everything you need is just a few steps away from this environment-friendly community, feel secured and at home as you choose from a Studio, 1-bedroom unit, 2-bedroom unit or 3 bedroom unit. Truly, Lions Park Residences is undoubtedly an excellent investment especially to OFWs and retirees who are looking for a place to stay or a home to retire in Manila.
      • To address the needs of the home owners, the Quadrillion Property Management (QPMI), the property management team of Lions Park, offers leasing and professional management . Realize your dream home today.
    • Site Development Plan W S N E
    •  
    • Amenities The Pavilion
    • Amenities Lap Pool & Kiddie Pool
    • Amenities Central Park Koi Pond Children’s Play area Water Bubblers
    • How to get there: At Lions Park Residences, you will not have to worry for everything is just a few meters away. This lush community is strategically located at Sta. Ana Drive, Sun Valley, Parañaque City. It is also accessibly situated near business centers and transportation hubs, only 10-15 minutes to Makati CBD, 25-35 minutes to Ortigas CBD and 5 minutes to the NAIA 2.
    • Building Features
      • Elevated water tanks 24/7 water supply
      • Underground drainage & sewerage system
      • 2.4 meter-wide corridors
      • 2 meter-wide entrance
      • Elevator
      • Generator for common areas
    • Affordability
      • Reservation fee starting at P15,000
      • As low as P10-15,000 monthly amortization
      • Flexible payment schemes
      • (down payment – payable up to 16 months; balance – payable up to 30 years through Pag-IBIG)
      • Financing through in-house, bank or PAG-IBIG.
    • Unit Features (GOLD) RESIDENTIAL AREA A. Floor Finishes Living, Dining & Kitchen Ceramic tiles with painted baseboard Bedroom Vinyl planks with painted baseboard Toilet Unglazed ceramic tiles B. Wall Finishes With ficemboard partitions Interior walls Painted Finish Toilet Painted paint cement finish above glazed tiles C. Ceiling Finishes Living, Dining & Kitchen Painted plain cement finish Bedrooms Painted plain cement finish Toilet Painted ficemboard finish D. Kitchen Modular Kitchen cabinet with stainless sink and stainless counter top No overhead cabinet. E. Door Entrance & Bedroom door Solid finger jointed wood with sheet laminated and solid wood core door jambs plus casing Balcony door (GF only) Aluminum framed sliding glass panel Toilet door PVC door F. Windows Aluminum windows G. Finishing Hardware Cylindrical lockset for main and bedroom Privacy lockset for T&B door H. Toilet Fixtures Water closet and Lavatory “American Classic Brand” or approved equivalent Shower Faucet Complete set of shower with faucet & fittings I. Electrical Complete outlet and lighting devices with circuit breaker
    • Alpaca Building Floor Plans
    • Alpaca Building Floor Plans
    • Floor Plans
    • Floor Plans
    • Elephant Building Floor Plans
    • Elephant Building Floor Plans
    • Floor Plans
    • ELEPHANT MODEL UNIT
    • Dove Building Floor Plans
    • Typical Floor Plan
    • OVERVIEW OF PAVILION & CENTRAL PARK
    • As of June 2011
    • As of June 2011
    • Construction Updates – Pool SWIMMING POOL BRIDGE OVER KOI POND
    • Construction Updates – Pavilion STAIRS GOING UP GROUND FLOOR 2 ND FLOOR
    • Construction Updates – Central Park ENTRY POINTS WATER FEATURES (BUBBLERS) KOI POND CHILDREN’S PLAY AREA
    • Construction Updates BUTTERFLY BLDG. CAMEL BLDG. BISON BLDG. CODFISH BLDG. ANTELOPE BLDG.
    • Construction Updates – Dolphin Building
    • Construction Updates – Dolphin Building
    • Construction Updates- Fox Parking Lot Covered walkway ongoing construction
    • Awarding of Alpaca to CE Construction
    • Alpaca Building - Topping Off Led by the ff: LPR Site Engineer Arnel Silvano, LPR Property Manager Ms. Nina Yamson, Marketing Supervisor Ms. Lei Macasaet-Pacheo, LPR Project Director Mr. Mike Pacheo, CDCH Architect Beth Vidal and CECON Engineer Robert Suggang
    • Construction Updates – Alpaca Building As of June 2011
    • Interior of Alpaca Building
    • TOILET AND BATH KITCHEN AREA
    • FIRE HOSE CABINET ELEVATOR HALLWAY CEILING
    • Sprinkler head Sprinkler pressure testing per floor
    • Exterior of Alpaca Building Landscaping works & repainting of trench grating Main Entrance
    • Completed construction of Pressurization Blower Room Water Tank & Fire pump Room Construction
    • LAUNDRY POSTS FIRE EXIT STAIRS ADDITIONAL SACP by HIMMAX Construction of Entrance Ramp
    •