Fmp schedule 20 02 2013

61
-1

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
61
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Fmp schedule 20 02 2013

  1. 1. Salford City CollegeEccles Sixth Form CentreBTec Level 3Extended Diploma in Creative Media ProductionGames DesignFinal Major ProjectScheduleReview date: 06.02.13 Monday Tuesday Wednesday Thursday Friday Saturday Sundayw/b 04.02.13 Task 1 - FMP Launch Meetingw/b 11.02.13 Half-Termw/b 18.02.13 Book meeting slot Have updated Have carried out Review Schedule and with project manager. production Log. research on jazz and Production Log blues and Ella Fitzgerald.w/b 25.02.13 Have sketched some Have researched Have updated Have decided on the Review Schedule and initial ideas and different types of Production Log. rough storyline for the Production Log drawings for comic art styles and novel. characters and the concepts styles. style and layout.w/b 04.03.13 Task 4: Pitch must Have decided on the Review Schedule and take place by this final storyboard idea. Production Log week.w/b 11.03.13 Task 5: Pre-production Have assessed how Review Schedule and must take place by much time I have to Production Log this week. complete the project and break it down into achievable goals.w/b 18.03.13 Review Schedule and Production Log25.03.13 Easter Review Schedule and Production Log01.04.13 Easter Try to carry out some Review Schedule and more background Production Log research on jazz and blues and visit stores comic book stores and art stores, music stores and book stores
  2. 2. w/b 08.04.13 Have started the Review Schedule and project work, rough Production Log sketching in pencil the storyboardw/b 15.04.13 Review Schedule and Production Logw/b 22.04.13 Review Schedule and Production Logw/b 29.04.13 Review Schedule and Production Logw/b 06.05.13 Have started inking Review Schedule and the drawn storyboard Production Log with fine liner and or indian inkw/b 13.05.13 Review Schedule and Production Logw/b 20.05.13 Task 8: Evaluation DEADLINE should take place no later than the beginning of this week.
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×