Imperial College London Refurbishment

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    Favorites, Groups & Events

    Imperial College London Refurbishment - Presentation Transcript

    1. The Central Library development – study spaces and more Angus S. Brown - Team Leader for Public Services a.brown@imperial.ac.uk May 2009
    2. Imperial College London Imperial College London: Established in 1907 World class research and teaching in science, engineering, medicine and management
    3. Our College staff 8,200 staff • 3,000 academic and research staff • 3,000 support staff • 1,700 honorary staff • 700 academic visitors and visiting researchers
    4. Our students 13,000 students • 8,300 undergraduates • 2,200 taught postgraduates • 2,500 research postgraduates Courses • 111 undergraduate courses • 124 postgraduate taught courses
    5. An international institution Students from 123 countries Top non-UK countries: • China • Singapore • Malaysia • Italy • Greece • Nigeria • France • Cyprus • Germany • India 75% increase in overseas students in 5 years 32% of staff non-UK nationals
    6. Our standing World University Rankings • 3rd in Europe 6th in World overall Times Good University Guide 2008 • 3rd in UK
    7. The library services • 13 libraries ( 8 in July 2009) • 126 fte Staff (c 150 people) • 440,871 Books • 1876 Reader spaces (1090 in Central Library)
    8. Introducing the project • Why, who and how much ? • Timescale • Design and planning • Highs and lows • Completion and celebrating success • Reflection and future aspirations
    9. Why ? Improve and renew the Central Library placing it at the heart of the campus by – • creating flexible study and learning space • Increasing study space numbers • extending IT access and provision • incorporating social interaction space • managed by a united public services team • Improving air handling and potential to extend scheme on upper floors What’s right for you institution ? What do your users need ? How do you find out ?
    10. Who ? • College Project Board • AEM – our architects • Library project team • FSS – library faculty support and services • Public Services team – issue , help and ILL • Core text staff • Library disability officer • Student survey Who needs to be involved ? Will they have an influence ? How do you communicate the planning process?
    11. How much ? Overall budget £11 Million : split equally between service tower and level 1 refurbishment Increase of 1800 square metres on the ground floor, offering - • 90 new PCs and wireless throughout • 150 group study spaces • 150 individual study spaces (including teaching space) • 110 café spaces Costs at the time – but remember future recurrent costs too – e.g. more cleaning
    12. Timescale • March 2006 – money confirmed • July 2006 – external building work starts on service tower • October 2006 – meetings with architects • January 2007 – internal work begins • May – August 2007 – detailed design work on staff areas • March – April 2008 – interior design work complete • June 2008 – level one handed over / furniture arrives • July 2008 – level 1 reopens Don’t wait – start thinking now – it isn’t too soon to dream, but it can be too late!
    13. Highs and lows •Fast design process – 3 months to sign off overall design •Building delays •Staff rise to challenge •Periods of planning quiet – staff anxiety •Periods of building noise – student anxiety •Working with the architects •Learning a new language Keep communicating, remember to keep records – before, during and after Build good relationships with your contractors !
    14. Design and planning Learn about scale ! Measure things out in real space.
    15. Entrance area
    16. Library Café - then Accept perfection won’t last
    17. Library café - now Success can be messy and untidy.
    18. Service points The most difficult bit of the design – work out your workflows first – and stick to them!
    19. Mobile zone Yes they will move the furniture – use some anchored tables to keep things in place.
    20. Think tanks 6 meeting cubes, each with a single PC and a large screen monitor
    21. Wolfson IT Learning suite 50 individual PCs, 3 bookable group study rooms, 3 library training rooms
    22. A year on – time to reflect • Reviewing the project hugely important • November 2008 paper survey • March 2009 student focus groups • Snagging and improvements ongoing • Air handling issues • Wire management • Main entrance Measuring success • Library activities up by 1/3 • Promotion, publicity and interest
    23. Thank you and any questions ?

    + Caroline RocheCaroline Roche, 5 months ago

    custom

    982 views, 0 favs, 1 embeds more stats

    A slideshow detailing all the stages of development more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 982
      • 970 on SlideShare
      • 12 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 3
    Most viewed embeds
    • 12 views on http://www.designinglibraries.org.uk

    more

    All embeds
    • 12 views on http://www.designinglibraries.org.uk

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories