Your SlideShare is downloading. ×
Validation and Verification using Rational DOORS for Aerospace
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Validation and Verification using Rational DOORS for Aerospace

954
views

Published on

This Presentation shows the implementation of Verification and Validation in aerospace using IBM Rational DOORS to provide compliance in requirements like DO-178C, ARP4754 etc.

This Presentation shows the implementation of Verification and Validation in aerospace using IBM Rational DOORS to provide compliance in requirements like DO-178C, ARP4754 etc.

Published in: Engineering, Technology, Design

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
954
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
32
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Validation and Verification using Rational DOORS for Aerospace Costas Aravidis, 9 October 2013
  • 2. Agenda • Before and After • Process And Tools • Application • Extra 9 October 2013 V&V Concept and Design 2
  • 3. Chapter 1 • Before and After • Process And Tools • Application • Extra 9 October 2013 Before and After V&V Concept and Design 3
  • 4. Before • We did not have a process • We did not have standards • We did not have control over the scripts • We did not have control over the documents • We did not have an overview of testing • We did not have an overview of changes • We did not know what to test, how and why • We could not measure progress 9 October 2013 V&V Concept and Design 4
  • 5. After • Identify and analyse the changes (regression) • Provide traceability and coverage of testing • Standardise procedure, script and results • Report pass/failed for each requirement • Measure progress in every stage to distribute work efficiently • Have a process that complies with ARP 4754, DO-178B and DO-254 • Produce Documentation • Increase productivity 9 October 2013 V&V Concept and Design 5
  • 6. Chapter 2 • Before and After • Process And Tools • Application • Extra 9 October 2013 Process And Tools V&V Concept and Design 6
  • 7. Process - Project Management Plan - Project Quality Plan - System Requirements Inputs - System Requirement - Change Summary / Tag IP - System Configuration Index Review System Requirement and changes Allocate Requirements Start 1. Work 2. Review 3. Rework 4. Approve VPS5 Record System Verification Evidence Perform Tests Create and maintain macro libraries analysis on changes Produce the Evidence of Review Report Analyse data and determine Results Create, Review and issue Verification Plan Issue Regression Test Analysis Report (Test IP) and Requirements Allocation Report 9 October 2013 Create or modify Tests (procedure and scripts) - System Verification Plan - Regression Test Analysis Report (Test IP) - Requirement Allocation Report V&V Concept and Design - Problem Log Reports - Acquired Allocation Results - Test Result VPS4 Perform System Verification Tests VPS3 Develop System Verification Test 1. Work 2. Review 3. Rework Perform Approve 4. Regression Agree Allocation and Regression with stakeholders Output - System Requirements - Regression Test Analysis Report (Test IP) VPS2 Allocate Requirements VPS1 Create System Verification Plan - Test Procedure - Tests Scripts - Rig Acceptance Report - HW Compliance Report - Rig Availability Plan Produce the Verification Summary Review Tests Issue Test Procedure - Test Procedure Report - Test Scripts Review Results Raise and investigate problems Issue Results Report - Problem Logs and Reports - Test Results - Test Data Produce the Configuration Index Document - Evidence of Review - Verification Summary - Configuration Index Document 7
  • 8. Tools • DOORS • Requirements (changes, regression) • Procedures (traceability, coverage) »Scripts • Results • Reviews • Documents • Python • Scripts • Export from DOORS • Execute the scripts on the Rig 9 October 2013 V&V Concept and Design 8
  • 9. Chapter 3 • Before and After • Process And Tools • Application • Extra 9 October 2013 Application V&V Concept and Design 9
  • 10. DOORS - APPLICATION • RCM • Requirements • Regression Analysis • Allocation • Procedures (TRACEABILITY) • Tests • Reviews • Results (TRACEABILITY) • Expected Results • Reviews • PR Tested • Testing Status • Requirements • Testing Status • Configuration • Management 9 October 2013 V&V Concept and Design 10
  • 11. What we have achieved Control Monitoring Progress DXL 9 October 2013 V&V Concept and Design Management Information Prediction Export 11
  • 12. Chapter 4 • Before and After • Process And Tools • Application • Extra 9 October 2013 What's Next V&V Concept and Design 12
  • 13. Extra – Achievements • Python Macro Libraries • Help documentation • Design documentation • Full Qualification 9 October 2013 V&V Concept and Design 13
  • 14. Screenshots from the tool 9 October 2013 V&V Concept and Design 14
  • 15. Screenshots from the tool 9 October 2013 V&V Concept and Design 15
  • 16. Screenshots from the tool 9 October 2013 V&V Concept and Design 16
  • 17. Screenshots from the tool 9 October 2013 V&V Concept and Design 17
  • 18. Screenshots from the tool 9 October 2013 V&V Concept and Design 18
  • 19. Screenshots from the tool 9 October 2013 V&V Concept and Design 19
  • 20. Screenshots from the tool 9 October 2013 V&V Concept and Design 20
  • 21. Screenshots from the tool 9 October 2013 V&V Concept and Design 21

×