Cambicci Associates Portfolio

940
views

Published on

Our work for 20 years

Our work for 20 years

Published in: Real Estate

0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
940
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
2
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Cambicci+Associates page 2 This page was intentionally left blank
  • 2. Company profile 2012 page 3 out of 129 CCCooonnnttteeennntttsss Short presentation Portfolio Organisation Qualifications Curriculum Vitae Contact Cambicci+associates consulting engineers co Mechanical Electrical Plumbing Energy & Industrial Studies; security; lighting design; photovoltaics; renewable energy; energy inspections; engineer & management services; supervisions; licensing; certifications
  • 3. Cambicci+Associates page 4 This page was intentionally left blank
  • 4. Company profile 2012 page 5 out of 129 SSShhhooorrrttt ppprrreeessseeennntttaaatttiiiooonnn The M.E.P. (mechanical, electrical and plumbing) studies office with the title Cambicci+Associates was founded in February 2007 by Gerasimos Kampitsis (Yerasimo Cambicci), Mechanical Engineer of the Aristotle University of Thessaloniki, following his work experience in electromechanical design and supervision since February 1992. Furthermore the office was manned with electrical and mechanical en- gineers aiming at the technologically sufficient and on time preparation of m.e.p. studies and supervisions. A consulting and engineering services company was legally constituted in 2012. The scope of our office in its current form is: • The elaboration of m.e.p. installations studies, for all types of projects (buildings, urban design and infrastructure). • Renewable energy systems design • Nearly zero energy buildings design • Energy feasibility inspections and evaluation of buildings • Obtaining permits and licences for buildings and installations • Lighting Studies • Supervision for all of the above subjects. • Consulting Services as a Project Manager
  • 5. Cambicci+Associates page 6 Our services are provided either by choice, or via competition in the premises of either the “Design & Construct System” or the Greek S.D.I.T. system(collaborations of the public and private sector). The engineering studies that are elaborated pertain to buildings to be constructed or renovations and extensions of existing ones. The mechanical electrical & plumbing studies, referred as mep studies (or building services or electrical mechanical studies) are an im- portant component of the whole of the technical studies necessary for the completion of all projects, and they can be divided into the fol- lowing categories: Mechanical Electrical & Plumbing Studies Buildings • Water Supply (pipe networks of potable water, hot-cold water supply networks and recirculation networks, production of hot water, solar panel systems(classical or of “void” type), storage tanks and pumping systems. • Irrigation (irrigation with pop-up sprinklers, underground irrigation) • Rainwater Draining (using typical gravity networks, siphonic systems, under ground pumping systems.) • Sewage (sewage pipe networks, sewage pumping systems, water-oil seperators, fat-collectors, gasoline-collectors) • Heating-Airconditioning (Typical heating systems with a boiler, single pipe systems, two-pipe and four-pipe systems, underfloor heating and floor cooling systems, central air-conditioning systems with air/water heatpumps or water/water cooling towers, air handling units, fan-coil networks, central and local split unit systems, VAV systems, geothermal systems, seawater het pumps, ex- haust and airing systems) • Expense allocation for a central heating system • Gas fueled systems (natural gas(low and high pressure)and LPG networks) • Lifting systems (lifts, elevators, rolling stairs, traffic studies) • Swimming pools (public and private, open or closed type) • Medium Voltage private substation (medium voltage panels, power transformers, γlow voltage panels, main and auxiliary input electrical generators, central and local U.P.S. systems, central safety lighting systems) • Heavy current electrical installation systems(lighting, plugging, in-rush current, electrical distribution in TN-C, TN-Sand IT systems) • Lightning Protection(Faraday cage and Franklin design systems, special grounding systems) • Light current electrical installation systems (phone-date networks, sound and pa installations, central R-TV-SAT, central clock sys- tems, conference systems, translation systems, real time transmittion systems, hotel management systems, building management systems, remote control systems, control rooms systems) • Antitheft protection (alarm, Access Control, C.C.T.V., vehicle stoppage systems, peripheral plot and building protection) • Fire safety (alarm, fire detection, security lighting ang signs, CO2, FM-200, Dry powder, Inergen, Argonite, water droplet automatic fire suppression systems, fire hose networks, sprinklers systems, foam systems, freezing systems, mobile fire stoppage devices)
  • 6. Company profile 2012 page 7 out of 129 • Pneumatic tube systems • Central vacuum Specifically for Greek Public Sector works (and for the private sector if required): • Elaboration of studies of all stages (preliminary, final, and construction) • Formulation of technical reports and specifications reports for the materials used in the study • Formulation of a general and specific obligations report for all parties involved in the project • Formulation of Cost analysis reports• • Furthermore, in shopping malls and retail markets: • Formulation of a report of the renter’s obligations • Monitoring the observance of the renter’s obligations • Optical sign systems • Sound systems • Video Wall systems• • Furthermore in Hotels: • Hotel room management systems • SPA, Jacuzzi, Sauna, Thalasotherapie systems• • Furthermore in Hospitals: • Medical Gas networks (Oxygen, Nitrogen Protoxide, Vacuum, High and Low pressure air, sleeping gas exhaust) • Special electrical installations for operating theaters and intensive care units (conductive floors, earthing systems, isolation moni- toring device for earthing systems, IT networks) • Medical equipment studies (Operating theaters, Intensive care units, Recovery units, Central Sterilization systems, linear accelera- tor studies, special medical examination devices studies) • Steam networks• • Furthermore in car parking buildings: • Exhaust networks for underground parking areas • Carbon monoxide detection systems • Management and electric signage systems for parking areas • Automatic management systems for parking areas (without a driver)
  • 7. Cambicci+Associates page 8 • Furthermore in industrial buildings: • Industrial machinery devices (soft starters, variable speed systems, medium voltage motors) • Piping Design Installations for gases & petroil sites • Antiexplosive installations • Industrial fluid and gases networks (pressurized air, petrol, oil, lubricants etc.) • Exhaust networks for spaces and machinery • Industrial equipment studies • Steam networks M.E.P. infrastructure studies Road Works • Highway and general road lighting works, overpass and intersection works • Electric signage • Special tunnel lighting of every form (drill, cut & cover) and underpass lighting • Lighting of all types of works • Tunnel exhaust installations • Electrical supply networks, of low medium and high voltage • Fire detection systems and tunnel fire safety • Tunnel monitoring networks (safety networks, height excess detection, emergency phones, safety lighting) • Tunnel servicing buildings • Central control stations for road works – control rooms • Sewage and garbage processing works • Primary, secondary and post secondary processing of liquid waste from sewage treatment facilities • Landfills and waste transportation centers • Solid waste processing units • Industrial machinery devices (soft starters, variable speed systems, medium voltage motors) • Central control installation networks • Pump stations • Hydraulic networks for the transportation of water from pumbing stations • Pumbstation electrical installations
  • 8. Company profile 2012 page 9 out of 129 Renewable resources studies • Solar panel systems for hot water production • Photovoltaic systems • Photovoltaic parks • Wind energy • Smal hydroelectric works • Systems integrating co-production of energy• Licencing • Of industrial buildings & Installations • Private parking areas • Private filling stations(liquid or gas fuel) • • Lighting design • Interior lighting • Lighting of public or private outdoor areas • Buildings beautification lighting • Monument lighting • Lighting of picturesque landscapes • Urban lighting plans • Safety studies • Risk analysis • Safety procedures and protocolls • Safety devices and measures • Passive safety devices and measures• Supervisions • Technical supervision (technical specifications and obligations observance monitoring, material inspection, monitoring of the con- struction, testing and adjustments) • Technical and fiscal supervision (technical supervision and auditing of accounts, validation of new prices, fiscal auditing of certifica- tions) • M.E.P. installations certification
  • 9. Cambicci+Associates page 10 Energy feasibility studies • Green building studies • Evaluation reconstruction and upgrade studies for existing buildings • Studies according to the Greek Regulation for the energetic evaluation of buildings • Evaluation of the energy requirements for heating systems • Thermography of buildings Management and consulting services • Licensing coordination and control • Organizing competitions for the assignment of studies • M.E.P. studies managment • Organizing competitions for foster constuctors • Screening of candidates, objection managment • Project construction control • Timetable observance • Management of the obligations that are not in the initial agreement • Temporary and final undertaking of a project
  • 10. Company profile 2012 page 11 out of 129 Our offices are in Pylaia, Thessaloniki and we undertake projects in the whole of Greece and the neighboring countries. Outside of Thes- saloniki we have offices-contact points in Athens, Thessalia & Thrace. The office is fully equipped in personnel and technological equipment for the elaboration of mep projects. In our organogram there is an administration division, an engineering studies division, a services division, a cost analysis division, a quality control division and a secre- tarial services division. The electronical equipment of our offices, regarding computer based devices and software, is based on the princi- ple of optimal available and reliable technology and includes a sufficient number of work spaces, computers, a network Server, and high quality software. There is software for the electromechanical design, software regarding Legislation and scientific literature (International and Greek) and software for the cost analysis of Public Sector Projects.
  • 11. Cambicci+Associates page 12 This page was intentionally left blank
  • 12. Company profile 2012 page 13 out of 129 PPPooorrrtttfffooollliiiooo
  • 13. Cambicci+Associates page 14 Our office associates and personell have successfully taken part in a sufficient number of projects in Greece and other countries and are notably experienced in the fields that our office specializes in. In this process all engineers in our office have been part of small or bigger groups for the elaboration of simple or complicated works in a variety of areas in Greece and abroad. For the completion of our projects we have the capacity to obtain all necessary Permits and certifications. Our customers can be multinationals or smaller companies, technical firms, investment groups, private entrepreneurs and the Greek Pub- lic sector in all its legal forms and ehelons. Hereupon, some typical projects our office and engineers have been part of, are cited: Category of projects pages Category of projects pages Services 15 to 24 Housing 77 to 84 Culture 25 to 30 Urban 85 to 90 Hotels 31 to 40 Industry, Oil & Gas Installations 91 to 98 Education 41 to 46 Infrastructure 99 to 104 Health 47 to 52 Energy 105 to 110 Shoping malls & retail stores 53 to 68 Security 111 to 114 Recreation 69 to 72 Project management 115 Sports 73 to 76
  • 14. Company profile 2012 page 15 out of 129 SSSeeerrrvvviiiccceeesss
  • 15. Cambicci+Associates page 16 B a n k o f G r e e c e B u i l d i n g i n T h e s s a l o n i k i , G r e e c e Project owner Bank of Greece SA Project design parties Construction manager Decathlon SA, D.Papazoglou Architectural study & construction supervision P.Nikiforidis–B.Cuomo ΤΥ ΤτΕ: BoG TD: E.Dalaklis-P.Panagakis Structural study and construction supervision Μ.Stefanouri–P.Zervas-G.Nikolaidis ΤΥ BoG TD: Ν.Vrontisis-G.Papadatos Mep study and construction supervision Y. Cambicci (*) BoG TD:Κ.Dimitrakopoulos-Κ.Grigoropoulos Study period: 2004-2006 Construction details General contractor: DOMOTECHNIKI SA Construction period: 2007-2009 Construction status: in operation Short description of project-services The project subject is the design and supervi- sion for the construction of the new building of Money Circulation and Vaults of the National Bank of Greece in Thessaloniki metrics Buildings surface: 5.500m2 Plot size: 35.000m2 Budget: 5.000.000 € (*) co-designer 33% for planning & construction supervision
  • 16. Company profile 2012 page 17 out of 129 O f f i c e B u i l d i n g R e n o v a t i o n i n A t h e n s , G r e e c e Project owner Henkel Hellas SA Project design parties Construction manager A.Drazinou-N.Prounias Architectural study Tsigarida Architects Structural study Mep study Cambicci+Associates Study period: 2008 Construction details General contractor: ΤΕΚΜΑ SA Construction period: 2009 Construction status: in operation Short description of project-services The project scope was the transformation of the existing office building into a modern mul- tinational corporation office building in Greece, with a hairdressing Academy, an auditorium and an underground closed parking. Google metrics Buildings surface: 8.500m2 Plot size: 4.100m2 Mep budget: 1.100.000 €
  • 17. Cambicci+Associates page 18 P o l i c e A d m i n i s t r a t i o n B u i l d i n g i n K o z a n i , G r e e c e Project owner MINISTRY OF INTERNAL AFFAIRS – HELLENIC POLICE DEPARTMENT Project design parties Project management KED SA Architectural study 406 Studies group, Vasileios Pappas Structural study I.Mavrakis and Associates SA Mep construction study Cambicci+Associates Study period: 2008-2009 Construction details General contractor: ANDREADIS ZISIADIS SA Construction period: 2009-2011 Construction status: in operation Short description of project-services The project scope was the construction study, for the auction of the new office building con- struction and underground parking area for the accommodation of the peripheral Police divi- sions of Western Macedonia prefecture, in Greece. Google metrics Buildings surface: 5.200m2 Plot size: 4.000m2 Mep budget: 2.000.000 €
  • 18. Company profile 2012 page 19 out of 129 M a n d a l i d e i o E n d o w m e n t a t N i k i s A v e n u e , T h e s s a l o n i k i , G r e e c e Project owner Company for the exploitation of AUTh real estate Project design parties Project management AUTh Technical Department Architectural study NIMAND Architects Structural study Ioannis Poulios Mep study Cambicci+Associates Study period: 2009 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope is the transformation of the existing building in Nikis Avenue in Thessaloni- ki into a Multiple Purpose Hall of the Aritoteleion Univercity of Thessaloniki (A.U.Th.) at Thessaloniki seafront. Google metrics Buildings surface: 1.600m2 Plot size: 260m2 Mep budget: 800.000 €
  • 19. Cambicci+Associates page 20 O f f i c e b u i l d i n g i n T h e s s a l o n i k i Project owner Grigorios Karidas limited Project design parties Project management Architectural study Panetsos Panagiotis Structural study G&G Penelis Consulting Engineers SA Mep study Cambicci+Associates Study period: 2007 Construction details General contractor: ARCON Constructions Construction period: 2008-2009 Construction status: in operation Short description of project-services The project scope is the transformation of the existing building in Dragoumi Street in Thes- saloniki into a modern office building. Google metrics Buildings surface: 1.100m2 Plot size: 300m2 Mep budget: 500.000 €
  • 20. Company profile 2012 page 21 out of 129 M A K E D O N I A I n t . A i r p o r t T e r m i n a l i n T h e s s a l o n i k i , G r e e c e Project owner OPPE Thessaloniki 97 – EYDE of Northern Greece Airports Project design parties Project management OPPE Thessaloniki 97 Architectural study Polis SA, G.Papakostas, J.Vlahos Structural study Concept Consultant-Engineers limited Mep study Y. Cambicci (*) Study period: 1997-2006 Construction details General contractor: ZINON ATHANASIADIS SA DOMOTECHNIKI SA – ANASTILOTIKI SA ANDREADIS ZISIADIS SA Construction period: 1997-2008 Construction status: in operation Short description of project-services Renovation of existing building and new ex- pansions for a new Makedonia Airport Terminal in Thessaloniki Greece Google metrics Buildings surface: 46.000m2 Plot size: 160.000m2 Mep budget: 40.000.000 € (*) co-designer 25-50% (depending of the phase)
  • 21. Cambicci+Associates page 22 N a t i o n a l B a n k a n d C u l t u r a l C e n t e r i n N o r t h e r n G r e e c e Project owner National Bank of Greece SA Project design parties Project management Andreadis-Zisiadis SA Architectural study Polis SA, G.Papakostas, J.Vlahos Structural study Concept Consultant-Engineers limited Mep study Cambicci+Associates Study period: 2006 Construction details General contractor: ANDREADIS ZISIADIS SA Construction period: 2007-2008 Construction status: in operation Short description of project-services Expansion of an existing building. Google metrics Buildings surface: 3.600m2 Plot size: 800m2 Mep budget: 800.000 €
  • 22. Company profile 2012 page 23 out of 129 T o w n H a l l o f P y l a i a Project owner Municipality of Pylaia Project design parties Architectural study K.Antoniou,E.Kastro,E.Disli,N.Barbari Structural study K.Anastasiadis, P.Panetsos Mep study Y. Cambicci (*) Mep study advisor Dr K.Pattas AUTh Proffessor Study period: 1994-1996 Construction details General contractor: Construction period: 1997-2000 Construction status: in operation Short description of project-services Office building with 2 underground parking levels in Pylaia, Thessaloniki. Google metrics Buildings surface: 2.700m2 Plot size: 900m2 Mep budget: 1.000.000 € (*) co-designer 33% for planning
  • 23. Cambicci+Associates page 24 O f f i c e b u i l d i n g i n T h e s s a l o n i k i Project owner Αsea Βrown Βoveri (ABB) ΑΕ Project design parties Architectural study N.Ktenas Structural study OMETE & ASSOCIATES SA Mep study Y. Cambicci (*) Mep construction supervisor Thomas Kolivopoulos Study period: 1998-2000 Construction details General contractor: ERGO3 Construction period: 2002-2004 Construction status: in operation Short description of project-services New ABB offices & whole sales building in North Greece Google metrics Buildings surface: 4.000m2 Plot size: 6.200m2 Mep budget: 1.100.000 € (*) co-designer 33% for planning
  • 24. Company profile 2012 page 25 out of 129 CCCuuullltttuuurrreee
  • 25. Cambicci+Associates page 26 P l o v d i v O p e r a R e n o v a t i o n i n B u l g a r i a Project owner Oblast Plovdiv Project design parties Project management ΑΚΤΟΡ BULGARIA SA Architectural study ΜΜΤ SΑ Structural study Concept Ltd Mep study Cambicci+Associates Study period: 2007 Construction details Gen. contr: AKTOR SA & AKTOP BULGARIA SA Construction period: 2008-ongoing Construction status: under construction Short description of project-services The project scope was the full renovation of the existing historical building and it’s trans- formation to a modern Opera House, the for- mation of a Cultural Centre, the addition of a commercial building and an automated under- ground car parking area. Google metrics Buildings surface: 14.000m2 Plot size: 8.000m2 Mep budget: 4.000.000 €
  • 26. Company profile 2012 page 27 out of 129 T h e r m i M u n i c i p a l A u d i t o r i u m , T h e s s a l o n i k i G r e e c e Project owner Municipality of Thermi Project design parties Project management Thermi Municipal TD Architectural study ΜΜΤ SA Structural study ΜΜΤ SA Mep study Cambicci+Associates Study period: 2009-2010 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services Project scope is the construction study and the formulation of auction documents for the con- struction of a new conservatoire in the munici- pality of Thermi, Thessaloniki. Google metrics Buildings surface: 1.600m2 Plot size: 1.700m2 Mep budget: 800.000 €
  • 27. Cambicci+Associates page 28 C u l t u r a l C e n t r e a t T a g a r a d e s , T h e s s a l o n i k i , G r e e c e Project owner Municipality of Thermi Project design parties Project management Thermi Municipal TD Architectural study ΜΜΤ SA Structural study ΜΜΤ SA Mep study Cambicci+Associates Study period: 2009-2010 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope is the Study of a new Cultur- al Center with Theatre in the municipality of Thermi, Thessaloniki. Google metrics Buildings surface: 4.800m2 Plot size: 4.600m2 Mep budget: 1.000.000 €
  • 28. Company profile 2012 page 29 out of 129 M i c h a n i o n a C u l t u r a l C e n t r e i n T h e s s a l o n i k i , G r e e c e Project owner Municipality of Michaniona Project design parties Architectural study E.Disli, X.Kiros, A.Xaritopoulos, Th.Theodoridis Structural study Concept Engineers Ltd Mep study Cambicci+Associates Mep study associate G. Klepkos Study period: 2010 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope is the construction study and the compilation of auction documents for the construction of the cultural center in the mu- nicipality of Michaniona, Thessaloniki. Google metrics Buildings surface: 1.200m2 Plot size: 4.000m2 Mep budget: 900.000 €
  • 29. Cambicci+Associates page 30 V y z a n t i n e M u s e u m o f V e r i a , G r e e c e Project owner Ministry of Culture Project design parties Project management ΑΡΧΙΤΕX SA Architectural study G.Anifantis-S.Anifantis, Κ.Asamopoulos,E.Skaltsa,D.Kontargiris, Α.Lampakis Structural study S.Kounadis, L.Kounadis, M.Zarkadoula & Associates Mep study Y. Cambicci (*) Study period: 1998-2000 Construction details General contractor: ARXITEX SA Construction period: 2001-2003 Construction status: in operation Short description of project-services Reconstruction and building expansion of an existing old factory building (mill) in Veria. Google metrics Buildings surface: 2.500m2 Plot size: 2.400m2 Mep budget: 1.300.000 € (*) co-designer 30% for planning
  • 30. Company profile 2012 page 31 out of 129 M a c e d o n i c M u s e u m o f M o d e r n A r t i n T h e s s a l o n i k i , G r e e c e Project owner Macedonian Museum of Contemporary Art Project design parties Project management ΑΡΧΙΤΕΤ ΑΤΕ Architectural study K.Antoniou-E.Kastro Structural study DELCO, N.Deligiannidis Mep study Y. Cambicci (*) Study period: 1998-2000 Construction details General contractor: ΑRΧΙΤΕΧ SΑ Construction period: 2001-2003 Construction status: in operation Short description of project-services Renovation and expansion of a museum for modern art in Thessaloniki. Google metrics Buildings surface: 4.400m2 Plot size: 4.150m2 Mep budget: 1.600.000 € (*) co-designer 33% for planning
  • 31. Cambicci+Associates page 32 C u l t u r a l C e n t r e o f t h e L a b o u r C e n t r e o f K o m o t i n i Project owner Labor Center of Komotini Project design parties Project management S.Agathakis & F.Stratos Architectural study G.Mademlis, Telis Vasiliadis Mep study Y. Cambicci (*) Acoustical study N.Mparkas-D.Keramidas Study period: 2001 Construction details General contractor: AGATHAKIS-STRATOS Construction period: 2002-2003 Construction status: in operation Short description of project-services Renovation of an existing Theater in Komotini Greece. Google metrics Buildings surface: 800m2 Plot size: 1.300m2 Mep budget: 400.000 € (*) co-designer 33% for planning
  • 32. Company profile 2012 page 33 out of 129 HHHooottteeelllsss
  • 33. Cambicci+Associates page 34 R e s t a u r a n t s A M M O S - A S T E R I A S a n d B o u s o u l a s a t S a n i R e s o r t i n H a l k i d i k i Project owner SANI SA Project design parties Architectural study NIMAND Architects Structural study Mep study Cambicci+Associates Study period: 2010 Construction details General contractor: SANI SA Construction period: 2012 Construction status: in operation Σύντομη περιγραφή έργου-υπηρεσιών Renovation of 2 beach-bars & restaurants at Sani resort in Halkidiki Greece. Google Μετρητικά στοιχεία Buildings surface: 500m2 Plot size: m2 Mep budget: €
  • 34. Company profile 2012 page 35 out of 129 O p e n T h e a t r e a n d m u l t i - f u n c t i o n a r e a a t t h e S a n i R e s o r t i n H a l k i d i k i Project owner SANI SA Project design parties Architectural study NIMAND Architects Structural study Mep study Cambicci+Associates Lighting design G-Lights Study period: 2010 Construction details General contractor: SANI SA Construction period: 2010 Construction status: in operation Short description of project-services The project scope was the construction of a new outdoor function area with a sheltered stage, auxiliary areas and adequate opticoacoustic equipment for the organization of cultural events in the SANI RESORT area Google metrics Buildings surface: 2.500m2 Plot size: m2 Mep budget: 500.000 €
  • 35. Cambicci+Associates page 36 H o t e l r e n o v a t i o n & e x p a n s i o n i n H a l k i d i k i , G r e e c e Project owner Eisaei SA Project design parties Project management ΜΜΤ SA Architectural study NIMAND SA – MMT SA Structural study ΜΜΤ SA Mep study Cambicci+Associates Study period: 2010 Construction details General contractor: SYNTHESIS SΑ Construction period: 2009-ongoing Construction status: under construction Short description of project-services The project scope was the extension, recon- struction, and upgrade of a 300-bed existing hotel in Ouranoupolis, Halkidiki, Greece. Google metrics Buildings surface: 9.500m2 Plot size: 25.000m2 Mep budget: 2.500.000 €
  • 36. Company profile 2012 page 37 out of 129 C o n g r e s s H a l l a t A l e x a n d e r B e a c h H o t e l i n A l e x a n d r o u p o l i , G r e e c e Project owner Xatzikonstantinou Bros SA Project design parties Architectural study A&B Stylianidis Structural study K.Xatzikonstantinou Mep study Y. Cambicci Mep construction supervisor Ν. Gemitzakis Study period: 2006 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2007 Construction status: in operation Short description of project-services The project scope was the construction of a new versatile E.O.T. approved congress hall, the formation of the outdoor area of the Hotel, and the updgrade of the m.e.p. installations of the Hotel Google Μετρητικά στοιχεία Buildings surface: 1.200m2 Plot size: 10.000m2 Mep budget: 1.800.000 €
  • 37. Cambicci+Associates page 38 C a s i n o i n P o r t o C a r r a s G r a n d R e s o r t , H a l k i d i k i G r e e c e Project owner CASINO MAGIC PORTO CARRAS SA Project design parties Project management ΑΡΧΙΤΕΧ SA Architectural study P.Makridis + Associates Structural study Mep study Y. Cambicci (*) Study period: 1996 Construction details General contractor: ARXITEX SA Construction period: 1996 Construction status: in operation Short description of project-services New Casino making in an existing Hotel Build- ing in Porto Carras Grand Resort. Google metrics Buildings surface: 1.500m2 Plot size: m2 Mep budget: 2.000.000 € (*) co-designer 33% for planning
  • 38. Company profile 2012 page 39 out of 129 S m a l l H o t e l i n S a n t o r i n i , G r e e c e Project owner Project design parties Project management Architectural study I.Vlahos Structural study Mep study Y. Cambicci (*) Study period: 2000 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Small Hotel Construction in Fira, Santorini, Greece. Google metrics Buildings surface: 700m2 Plot size: 8.000m2 Mep budget: 400.000 € (*) co-designer 50% for planning
  • 39. Cambicci+Associates page 40 This page was intentionally left blank
  • 40. Company profile 2012 page 41 out of 129 ΕΕΕddduuucccaaatttiiiooonnn
  • 41. Cambicci+Associates page 42 E x t e n s i o n o f t h e P e d a g o g y D e p a r t m e n t o f t h e A r i s t o t l e U n i v e r s i t y o f T h e s s a l o n i k i Project owner Aristotle University of Thessaloniki Project design parties Architectural study Ν.Kalogirou Professor Dpt. Arch. Α.U.Th. Α.Vasiliadis,Κ.Giatas,D.Koliakos,L.Mavridis Structural study Κ.Stylianidis Professor Dpt. Civ.Eng. Α.U.Th. Ch.Ignatakis Professor Dpt. Civ.Eng. Α.U.Th. S.Baxevanis Mep construction study Cambicci+Associates Mep study consultant: Κ.Andreou Lecturer Dpt. El.Eng. Α.U.Th. Mep study advisor Κ.Andreou Lecturer Dpt. El.Eng. Α.U.Th. Study period: 2010 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope was the costruction study for the expansion of the pedagogy Department of the A.U.Th with the addition of two new teach- ing room wards as well as an auditorium Google metrics Buildings surface: 18.500m2 Plot size: 10.000m2 Mep budget: 5.500.000 €
  • 42. Company profile 2012 page 43 out of 129 A . U . T h C o n g r e s s H a l l i n P o l y t e c h n i c S c h o o l , G r e e c e Project owner Company for the exploitation of A.U.Th. Real Estate Project design parties Project management A.U.Th TD Architectural study ΝΙΜΑΝD Architects Structural study Ι.Poulios Mep study Cambicci+Associates Study period: 2009 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope was the construction study and the compilation of auction documents for the renovation of the existing central auditori- ums of the Polytechnic School and the con- struction of a modern conference center in U.A.T. Google metrics Buildings surface: 3.200m2 Plot size: m2 Mep budget: 1.000.000 €
  • 43. Cambicci+Associates page 44 L i g h t i n g o f t h e A . U . T h P h i l o s o p h y D e p a r t m e n t Project owner A.U.Th Project design parties Project management A.U.Th TD Architectural study Ν.Μ.Andreadi Professor Dept.Arch.A.U.th. Mep study Cambicci+Associates Lighting design G-Lights - M.Gourogiannis Study period: 2010 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope is the architectural lighting of the facades of the landmark building of the Philosophy Dept of the A.U. of Thessaloniki. Google metrics Buildings surface: m2 Plot size: 4.000m2 Mep budget: 500.000 €
  • 44. Company profile 2012 page 45 out of 129 B i s s e l l C o l l e g e L i b r a r y i n T h e s s a l o n i k i , G r e e c e Project owner Board of the American College of Thessaloniki Project design parties Project management P.Makridis Architectural study P.Makridis + Associates Structural study Mep study Y. Cambicci (*) Study period: 1996 Construction details General contractor: DOMOTECHNIKI SA Construction period: 1997-1998 Construction status: in operation Short description of project-services New Library Building in American College of Thessaloniki. Google metrics Buildings surface: 4.000m2 Plot size: 10.000m2 Mep budget: 2.150.000 € (*) co-designer 33% for planning
  • 45. Cambicci+Associates page 46 R e c o n s t r u c t i o n o f p r i v a t e s c h o o l i n T h e s s a l o n i k i , G r e e c e Project owner American College ‘Anatolia’ of Thessaloniki Project design parties Project management P.Makridis Architectural study & construction supervision P.Makridis + Associates SA Structural study Mep study & construction supervision Cambicci+Associates Study period: 2010 Construction details General contractor: Construction period: 2010 Construction status: in operation Short description of project-services Elaboration of the construction study and the cost analysis reports. Google metrics Buildings surface: 1.500m2 Plot size: 20.000m2 Mep budget: 300.000 €
  • 46. Company profile 2012 page 47 out of 129 HHHeeeaaalllttthhh
  • 47. Cambicci+Associates page 48 R e h a b i l i t a t i o n C e n t r e i n S e r r e s , G r e e c e Project owner ANANEOSI SA Project design parties Project management SYNTHESIS SA Architectural study ΜΜΤ SA Structural study ΜΜΤ SA Mep study Cambicci+Associates Study period: 2010 Construction details General contractor: Construction period: 2009 Construction status: in operation Short description of project-services The project scope was the study of a rehabili- tation center in the municipality of Emmanouil Pappas in Serres. Google metrics Buildings surface: 5.200m2 Plot size: 6.700m2 Mep budget: 2.000.000 €
  • 48. Company profile 2012 page 49 out of 129 R e n o v a t i o n o f t h e B l u e C r o s s C l i n i c i n T h e s s a l o n i k i , G r e e c e Project owner EUROMEDICA SA ‘KIANOYS STAYROS’ SA Project design parties Project management EUROMEDICA TD Architectural study POLIS SA, MEIONENA Structural study K.Makedos Mep study Y. Cambicci (*) Study period: 2000-2001 Construction details General contractor: AKTOR SA Construction period: 2001-2002 Construction status: in operation Short description of project-services Tottaly reconstruction of a major clinik in Thes- saloniki. Google metrics Buildings surface: 5.800m2 Plot size: 1.300m2 Mep budget: 3.000.000 € (*) co-designer 33% for planning
  • 49. Cambicci+Associates page 50 C e n t r a l M E P I n s t a l l a t i o n s r e n o v a t i o n a t P r i v a t e G e n e r a l C l i n i c i n T h e s s a l o n i k i Project owner EUROMEDICA SA GENIKI KLINIKI SA Project design parties Project management EUROMEDICA TD Architectural study Structural study Mep study Y. Cambicci (*) Study period: 2001-2002 Construction details General contractor: ERGO3 Construction period: 2002-2003 Construction status: in operation Short description of project-services Reconstruction of the central MEP networks in a general clinik in Thessaloniki. Google metrics Buildings surface: 8.000m2 Plot size: 1.800m2 Mep budget: 1.000.000 € (*) co-designer 33% for planning
  • 50. Company profile 2012 page 51 out of 129 N e w S u r g e r y a n d A d m i n i s t r a t i o n B u i l d i n g i n A H E P A H o s p i t a l i n T h e s s a l o n i k i , G r e e c e Project owner Ministry of Health Project design parties Project management AHEPA TD Architectural study X.Kouloukouris,A.Tseranidis Ε.Ε. TROPALIS E.T.E. Structural study Mep study Y. Cambicci (*) Study period: 2001-2002 Construction details General contractor: Construction period: Construction status: postponed Short description of project-services New Surgeries, Central Sterilise Department, Intensive Care Department and administration building for a General Hospital in Thessaloniki. Google metrics Buildings surface: 5.800m2 Plot size: m2 Mep budget: 5.600.000 € (*) co-designer 33% for planning
  • 51. Cambicci+Associates page 52 E . D . a n d B l o o d D o n a t i o n C e n t r e a t I p p o k r a t e i o H o s p i t a l i n T h e s s a l o n i k i , G r e e c e Project owner DEPANOM SA Project design parties Project management J&P AVAX SA Architectural study METE SYSM SA Structural study METE SYSM SA Mep study Y. Cambicci (*) Study period: 2004 Construction details General contractor: J&P-AVAX SΑ Construction period: 2004-2006 Construction status: in operation Short description of project-services Reconstruction of existing building for emer- gency department and making of a new build- ing for blood donation center. Google metrics Buildings surface: 2.500m2 Plot size: m2 Mep budget: 1.100.000 € (*) co-designer 33% for planning
  • 52. Company profile 2012 page 53 out of 129 SSShhhoooppppppiiinnnggg mmmaaallllllsss &&& RRReeetttaaaiiilll ssstttooorrreeesss
  • 53. Cambicci+Associates page 54 S h o p p i n g C e n t e r a t X a n t h i , G r e e c e Project owner ALPHA RETAIL PARKS SA Project design parties Project management Leonidas Athanasiadis Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Study period: 2010 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2009-2010 Construction status: in operation Short description of project-services New Shopping Center Flamingo in Xanthi. Google metrics Buildings surface: 18.500m2 Plot size: 80.000m2 Mep budget: 2.200.000 €
  • 54. Company profile 2012 page 55 out of 129 H y p e r m a r k e t a t X a n t h i , G r e e c e Project owner PRAKTIKER HELLAS ΑΕ Project design parties Project management Leonidas Athanasiadis Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Study period: 2010 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2009-2010 Construction status: in operation Short description of project-services Hypermarket in Flamingo Shopping Center in Xanthi. The fire study was inspected and ap- proved by VdS. Google metrics Buildings surface: 4.500m2 Plot size: 5.500m2 Mep budget: 1.200.000 €
  • 55. Cambicci+Associates page 56 E a s t T h e s s a l o n i k i S h o p p i n g C e n t e r Project owner ΦΑΜ ΑΕ Project design parties Development, Project & Construction management Alexander Kalatzis Architectural study S.Suchomel-Τ.Kalatzis-Μ.kalatzis Structural study G.Papargyris-A.Kardoula & Associates Mep study Cambicci+Associates Study period: 2009 Construction details General contractor: ΜΑΚΤ SΑ Construction period: 2009-2010 Construction status: in operation Short description of project-services New Shopping Center East Plazza in eastern Thessaloniki. Google metrics Buildings surface: 9.300m2 Plot size: 30.000m2 Mep budget: 1.800.000 €
  • 56. Company profile 2012 page 57 out of 129 E a s t T h e s s a l o n i k i H y p e r m a r k e t Project owner SATURN-MEDIA MARKT ΑΕ Project design parties Project management MAKT SA-LDK SΑ Interior Architectural study LDK ΑΕ Mep study LDK SΑ - Cambicci+Associates Mep construction supervision LDK SΑ - Cambicci+Associates Study period: 2009 Construction details General contractor: ΜΑΚΤ SA Construction period: 2009-2010 Construction status: in operation Short description of project-services Fire safety construction study and MEP super- vision in Saturn Hypermarket in east Thessalo- niki. Google metrics Buildings surface: 6.400m2 Plot size: m2 Mep budget: 1.400.000 €
  • 57. Cambicci+Associates page 58 W e s t T h e s s a l o n i k i H y p e r m a r k e t Project owner HELLINIKI ETERIA IDIOKATASKEVON SA Project design parties Project management ECC Engineering Construction Consulting SA Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Study period: 2009 Construction details General contractor: Construction period: Construction status: under development Short description of project-services Mep study for making of a new hypermarket in Western Thessaloniki. Google metrics Buildings surface: 10.300m2 Plot size: 49.000m2 Mep budget: 1.600.000 €
  • 58. Company profile 2012 page 59 out of 129 H y p e r m a r k e t i n T i r a n a , A l b a n i a Project owner Megatek ShA Project design parties Project management Dionis Teqja Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Study period: 2007 Construction details General contractor: ZAlba SA Construction period: 2008-2009 Construction status: in operation Short description of project-services Retail & Whole Sale Building for MEGATEK ShA and new office bulding for DIONIS TEQJA Companies in Tirana-Durred Highway in Alba- nia. Google metrics Buildings surface: 25.200m2 Plot size: 75.000m2 Mep budget: 2.600.000 €
  • 59. Cambicci+Associates page 60 H y p e r m a r k e t i n L a r i s s a , G r e e c e Project owner HELLINIKI ETERIA IDIOKATASKEVON SA Project design parties Project management Focal Project Managers Architectural study archigraph architecture_interiors Structural study Statoras Initial mep study Α.Koutsikos SA Mep construction study Cambicci+Associates Study period: 2008-2009 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2009 Construction status: in operation Short description of project-services Modofications in construction study for a new hypermarket in Larissa Greece. Google metrics Buildings surface: 7.900m2 Plot size: 38.000m2 Mep budget: 1.400.000 €
  • 60. Company profile 2012 page 61 out of 129 H y p e r m a r k e t i n V o l o s , G r e e c e Project owner MAKRO Cash & Carry SA Project design parties Project management John Ninos Architectural study & construction supervision archigraph architecture_interiors Structural study & construction supervision Statoras Mep study & construction supervision Cambicci+Associates Study period: 2007 Construction details Gen. contractor:ΑRΧΙΚΟΝ SA-ANAPLASEON SA Construction period: 2008 Construction status: in operation Short description of project-services Mep Study and construction supervision for a new makro hypermarket in Volos, Greece. Google metrics Buildings surface: 4.200m2 Plot size: 29.000m2 Mep budget: 1.000.000 €
  • 61. Cambicci+Associates page 62 H y p e r m a r k e t i n V e r i a , G r e e c e Project owner Kalpakis Panagiotis Co Project design parties Initial Architectural study A.Sidiropoulos Construction Architectural study Κ.Papastergiou Structural study S.Diamantopoulos Mep study & construction supervision Cambicci+Associates Study period: 2007 Construction details General contractor: EGERSIS Limited Construction period: 2007-2008 Construction status: in operation Short description of project-services New factory and sales center for Kalpakis De- sign Company in Veria, Greece. Google metrics Buildings surface: 5.800m2 Plot size: 5.200m2 Mep budget: 1.500.000 €
  • 62. Company profile 2012 page 63 out of 129 H y p e r m a r k e t i n X a n t h i , G r e e c e Project owner MAKRO Cash & Carry SA Project design parties Project management Leonidas Athanasiadis Architectural study & construction supervision archigraph architecture_interiors Structural study & construction supervision Statoras Mep study & construction supervision Cambicci+Associates Study period: 2006-2007 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2008 Construction status: in operation Short description of project-services Mep Study and construction supervision for a new makro hypermarket in Xanthi, Greece Google metrics Buildings surface: 4.200m2 Plot size: 22.800m2 Mep budget: 1.000.000 €
  • 63. Cambicci+Associates page 64 S h o p p i n g c e n t e r i n T h e s s a l o n i k i , G r e e c e Project owner Carrefour Hellas SA Project design parties Development, Project & Cosntruction management MAKT SA – Alexander Kalatzis Architectural construction supervision S.Vergopoulos, N.Dimtsas Structural construction supervision G.Papargyris Mep construction supervision Cambicci+Associates Study period: 1998-1999 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 1999-2000 Construction status: in operation Short description of project-services MAKEDONIA Major Shopping Center in Thessa- loniki. In the center exists Carrefour Hyper- market, Cinema Complex, Shopping Mall, and Recreational area building. Google metrics Buildings surface: 35.000m2 Plot size: 140.000m2 Mep budget: 4.800.000 €
  • 64. Company profile 2012 page 65 out of 129 W e s t T h e s s a l o n i k i H y p e r m a r k e t Project owner MAKRO Cash & Carry SA Project design parties Project management Leonidas Athanasiadis Architectural study & construction supervision archigraph architecture_interiors Structural study & construction supervision Statoras Mep study & construction supervision Cambicci+Associates Study period: 2004 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2004-2005 Construction status: in operation Short description of project-services Mep Study and construction supervision for a new makro hypermarket in Western Thessalo- niki Area, Greece. Google metrics Buildings surface: 4.200m2 Plot size: 22.000m2 Mep budget: 1.000.000 €
  • 65. Cambicci+Associates page 66 E a s t T h e s s a l o n i k i E l e c t r i c a l H y p e r m a r k e t Project owner ΤΑΚ AE Project design parties Development, Project & Construction management MAKT SA - Alexander kalatzis Architectural study Μ.Kalatzis-Τ.Kalatzi-S.Suchomel Structural study & construction supervision G.Papargyris Mep construction supervision Cambicci+Associates Study period: 2005 Construction details General contractor: ΜΑΚΤ SΑ Construction period: 2004-2005 Construction status: in operation Short description of project-services Mep construction supervision for a new hyper- market in Thessaloniki. Google metrics Buildings surface: 7.200m2 Plot size: 17.500m2 Mep budget: 900.000 €
  • 66. Company profile 2012 page 67 out of 129 H y p e r m a r k e t i n T h e s s a l o n i k i , G r e e c e Project owner Diagonios SA Project design parties Project management Architectural study A.N Tombazis & Associates Architects- P.Makridis+Associates Structural study Ι.Poulios Mep study Y. Cambicci (*) Study period: 2000 Construction details General contractor: DIAGONIOS SA Construction period: 2001 Construction status: in operation Short description of project-services New Shopping center EUROTECH for building materials stores in eastern Thessaloniki area. Google metrics Buildings surface: 8.000m2 Plot size: 20.000m2 Mep budget: 1.300.000 € (*) co-designer 33% for planning
  • 67. Cambicci+Associates page 68 D u t y F r e e S h o p s i n B o r d e r S t a t i o n s Project owner Hellenic Duty Free Shops SA Project design parties Project management Architectural study POLIS SA, G.Vlahos Structural study Concept SA Mep study Y. Cambicci (*) Study period: 2004 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services New stores for Hellenic Duty Free Shops in Greece Border Stations at Kakavia, Promahona Rhodes Airport and Katakolo port (construction postponed). Google 1 2 3 4 5 metrics Buildings surface: 5.000m2 Plot size: m2 Mep budget: 650.000 € (*) co-designer 33% for planning
  • 68. Company profile 2012 page 69 out of 129       RRReeecccrrreeeaaatttiiiooonnn
  • 69. Cambicci+Associates page 70 R e s t a u r a n t i n T h e s s a l o n i k i , G r e e c e Project owner Clochard Restaurant Project design parties Project management Architectural study & construction supervision P.Makridis+Associates SA Structural study Mep study & construction supervision Cambicci+Associates Study period: 2007 Construction details General contractor: Construction period: 2008 Construction status: in operation Short description of project-services Restaurant reconstruction in Thessaloniki cen- ter. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: €
  • 70. Company profile 2012 page 71 out of 129 C a f é & R e s t a u r a n t i n T i r a n a , A l b a n i a Project owner Albanian restaurants Sha Project design parties Project management Vivartia TD-Goodys Architectural study archigraph architecture_interiors Structural study Mep study Cambicci+Associates Study period: 2007 Construction details General contractor: Construction period: : Construction status: postponed Short description of project-services Goodys & Flocafé stores in MEGATEK shopping center in Tirana Albania. Google metrics Buildings surface: 800m2 Plot size: m2 Mep budget: 250.000 €
  • 71. Cambicci+Associates page 72 This page was intentionally left blank
  • 72. Company profile 2012 page 73 out of 129 SSSpppooorrrtttsss
  • 73. Cambicci+Associates page 74 R e n o v a t i o n o f T o u m p a a r e a i n T h e s s a l o n i k i , G r e e c e Project owner Municipality of Thessaloniki Project design parties Project management Thessaloniki Organisation Architectural study A.Panos M.Papadakis Architects, DEKATHLON SA Structural study Concept Engineers Mep study Y. Cambicci (*) Study period: 2004 Construction details General contractor: Construction period: 2005-2008 Construction status: in operation Short description of project-services Open swimming pool, new cultural center, in Alana tis Toumpas area of Thessaloniki. Google metrics Buildings surface: 7.200m2 Plot size: 33.000m2 Mep budget: 2.700.000 € (*) co-designer 33% for planning
  • 74. Company profile 2012 page 75 out of 129 I n d o o r s w i m m i n g p o o l f a c i l i t y i n V e r i a , G r e e c e Project owner Municipality of Veria Project design parties Project management Evripos SA Architectural study PETRA SINERGATIKI Consulting Engineers Structural study Concept Consulting Engineers Mep study Y. Cambicci (*) Study period: 2006 Construction details General contractor: EVRIPOS SA Construction period: Construction status: postponed Short description of project-services New major indoor swimming pool facility in Veria sports center. Google metrics Buildings surface: 11.000m2 Plot size: 28.000m2 Mep budget: 2.200.000 € (*) co-designer 33% for planning
  • 75. Cambicci+Associates page 76 A r t i f i c i a l l a k e s c o m p l e x i n K a l a m a r i a , T h e s s a l o n i k i Project owner Municipality of Kalamaria Project design parties Project management Municipality of Kalamaria TD Architectural study Stamatis Koukopoulos Structural study Mep study Cambicci+Associates Study period: 1999 Construction details General contractor: Construction period: Construction status: cancelled Short description of project-services Outdoor major swimming pool and icetrack in Kalamaria, Thessaloniki, Greece. Google metrics Buildings surface: 3.500m2 Plot size: 19.000m2 Mep budget: 1.200.000 €
  • 76. Company profile 2012 page 77 out of 129 HHHooouuusssiiinnnggg
  • 77. Cambicci+Associates page 78 V I P V i l l a i n P e f k o c h o r i H a l k i d i k i , G r e e c e Project owner Project design parties Project management ΜΜΤ SA Architectural study & construction supervision Peter Schellinger Ε.Tzekakis, N.Manou-Andreadis R.Papadakis, D.Aristotelidis Structural study Ι.Poulios Mep study & construction supervision Cambicci+Associates Study period: 2011 Construction details General contractor: Construction period: 2011-ongoing Construction status: under construction Short description of project-services VIP Villas complex in Pefkochori Halikidiki, Greece. Google metrics Buildings surface: 700m2 Plot size: 16.000m2 Mep budget: 1.000.000 €
  • 78. Company profile 2012 page 79 out of 129 T w o c o u n t r y v i l l a s a t S k i a t h o s I s l a n d , G r e e c e Project owner Project design parties Project management P.Makridis+Associates SA Architectural study & construction supervision P.Makridis+Associates SA Petros Makridis Thodoris Makridis Eleana Makridis Structural study Mep study & construction supervision Cambicci+Associates Study period: 2010 Construction details General contractor: Construction period: 2012 Construction status: under construction Short description of project-services Two country villas in Skiathos town area. Google Μετρητικά στοιχεία Buildings surface: 220m2 Plot size: 4.000m2 Mep budget: €
  • 79. Cambicci+Associates page 80 O f f i c e s & H o u s e s C o m p l e x i n M e t a x o u r g i o A t h e n s , G r e e c e Project owner GEK SA Project design parties Project management Architectural study Tsigarida Architects Structural study Α.Xenos Mep study Cambicci+Associates Study period: 2006 Construction details General contractor: Construction period: Construction status: Short description of project-services 1st prize in architectural contest in Metaxourgeio area in Athens, Greece metrics Buildings surface: m2 Plot size: m2 Mep budget: €
  • 80. Company profile 2012 page 81 out of 129 V i l l a i n M o l i v o s , L e s v o s I s l a n d , G r e e c e Project owner Project design parties Project management Architectural study Tsigarida Architects Structural study Mep study Cambicci+Associates Study period: 1999 Construction details General contractor: Construction period: Construction status: Short description of project-services Country Villa at Molivos in Lesvos Island, Greece. Google Μετρητικά στοιχεία έργου Buildings surface: 150m2 Plot size: 4.000m2 Mep budget: €
  • 81. Cambicci+Associates page 82 V i l l a i n P o t i d a i a H a l k i d i k i , G r e e c e Project owner Project design parties Project management Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Study period: 2009 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services A seaside villa in Halkidiki, Greece Google metrics Buildings surface: m2 Plot size: m2 Mep budget: €
  • 82. Company profile 2012 page 83 out of 129 P l a g i a r i S . O . S . v i l l a g e f o r o r p h a n c h i l d r e n i n T h e s s a l o n i k i , G r e e c e Project owner SOS Village for Northern Greece Project design parties Project management Architectural study P.Makridis+Associates Structural study Mep study Y. Cambicci (*) Study period: 1999 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services MEP Study for a full village construction, com- posed of houses, main multipurpose building, sports areas, roads and infrastructure. Google metrics Buildings surface: 4.000m2 Plot size: 13.000m2 Mep budget: 1.100.000 € (*) co-designer 33% for planning
  • 83. Cambicci+Associates page 84 P r e s s V i l l a g e f o r A t h e n s O l y m p i c G a m e s i n M a r o u s i A t h e n s , G r e e c e Project owner Municipality of Amarousion Project design parties Project management Architectural study Structural study Mep study Y. Cambicci (*) Study period: 1999 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Complete mep study for village buildings made for the Olympic Games. Google metrics Buildings surface: 8.000m2 Plot size: 30.000m2 Mep budget: € (*) co-designer 50% for planning
  • 84. Company profile 2012 page 85 out of 129 UUUrrrbbbaaannn
  • 85. Cambicci+Associates page 86 W h i t e T o w e r s q u a r e r e n o v a t i o n i n T h e s s a l o n i k i , G r e e c e Project owner Municipality of Thessaloniki Project design parties Project management Architectural study Tsigarida Architects Mep study Y. Cambicci (*) Lighting design Duillio Passariello Li-Dac Philips Study period: 2005 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Mep study for the square of White tower, sym- bol of the city of Thessaloniki. Google metrics Buildings surface: 100m2 Plot size: 18.000m2 Mep budget: 500.000 € (*) co-designer 33% for planning
  • 86. Company profile 2012 page 87 out of 129 K e f a l a r i s p r i n g s a r e a i n D r a m a , G r e e c e Project owner DEPOS SΑ Project design parties Project management DEPOS SA Architectural study George Triantafyllidis Structural study Mep study Y. Cambicci (*) Study period: 2005 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Google metrics Buildings surface: 500m2 Plot size: 16.000m2 Mep budget: 900.000 € (*) co-designer 50% for planning
  • 87. Cambicci+Associates page 88 H e l l e n i c g a r d e n i n g a r d e n i n g E X P O i n C h i n a Project owner HELEXPO SA Project design parties Project management HELEXPO SA Architectural study P.Nikiforidis, B.Cuomo Structural study Maria Stefanouri Mep study Y. Cambicci (*) Study period: 2006 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services A garden for Shen Yang China International Hogricultural Exposition 2006. Google metrics Buildings surface: m2 Plot size: 1.200m2 Mep budget: € (*) co-designer 50% for planning
  • 88. Company profile 2012 page 89 out of 129 R e f u r b i s h m e n t o f t h e n e w p r o m e n a d e o f T h e s s a l o n i k i , G r e e c e Project owner Municipality of Thessaloniki Project design parties Architectural study P.Nikiforidis, B.Cuomo, Atelier R.Castro-S.Denissof Structural study I.Lavasas-M.Stefanouri Plants & trees arrangement study Iloriki Mep study Y. Cambicci (*) Study period: 2006 Construction details General contractor: SIDIRODROMIKA ERGA SA Construction period: phase A+B: 2006-2008 Phase C: 2011-ongoing Construction status: 50% in operation 50% under construction Short description of project-services Full renovation of Thessaloniki promenade. Google metrics Buildings surface: m2 Plot size: 280.000m2 Mep budget: 6.000.000 € (*) co-designer 33% for planning
  • 89. Cambicci+Associates page 90 This page was intentionally left blank
  • 90. Company profile 2012 page 91 out of 129 IIInnnddduuussstttrrriiiaaalll OOOiiilll &&& GGGaaasss iiinnnssstttaaallllllaaatttiiiooonnnsss
  • 91. Cambicci+Associates page 92 E l e c t r i c a l s y s t e m s m a n u f a c t u r i n g f a c t o r y i n K a l o h o r i , T h e s s a l o n i k i , G r e e c e Project owner SIAFARAS ELECTRICAL SYSTEMS SA Project design parties Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Energy study Energy Technologies ΕΝΤΕ Study period: 2008-2009 Construction details General contractor: FRIGOSTAHL SΑ Construction period: 2010-2011 Construction status: under construction Short description of project-services Expansion of existing factory in Thessaloniki Google metrics Buildings surface: 4.200m2 Plot size: 10.000m2 Mep budget: 800.000 €
  • 92. Company profile 2012 page 93 out of 129 N e w f a c t o r y - m i l l i n S i n d o s i n d u s t r i a l a r e a , G r e e c e Project owner E.DI.V.E. SA (Allatini Mill) Project design parties Project management Architectural study P.Makridis+Associates Structural study Mep study Y.Cambicci (*) Study period: 1995-1998 Construction details Gen. contractor: ΕLLINIKI TECHNODOMIKI SA ΤΕΚ THESSALONIKI SΑ Construction period: 1997-1998 Construction status: in operation Short description of project-services Mep study & supervision for a new factory in Sindos area. Google metrics Buildings surface: 9.100m2 Plot size: 33.000m2 Mep budget: 1.200.000 € (*) co-designer 33% for planning
  • 93. Cambicci+Associates page 94 C a r r e p a i r d e p o t Project owner Municipality of Thessaloniki Project design parties Project management ΑΡΧΙΤΕΧ SA Architectural study Anthi Katsika Structural study Parisis Mpillias Mep study Y.Cambicci (*) Study period: 2004 Construction details General contractor: ARXITEX SA Construction period: 2004 Construction status: in operation Short description of project-services New car repair depot for Thessaloniki munici- pality. Google metrics Buildings surface: 5.300m2 Plot size: 4.700m2 Mep budget: 900.000 € (*) co-designer 50% for planning
  • 94. Company profile 2012 page 95 out of 129 F i s h e r y p r o c e s s i n g f a c t o r y i n K a v a l a i n d u s t r i a l a r e a , G r e e c e Project owner TRIFONIDIS SA Project design parties Project management Architectural study archigraph architecture_interiors Structural study G.Papargyris-A.Kardoula Mep study Y.Cambicci (*) Study period: 2002 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2003 Construction status: in operation Short description of project-services New factory in Kavala area. Google metrics υ Buildings surface: 3.200m2 Plot size: 12.000m2 Mep budget: 500.000 € (*) co-designer 50% for planning
  • 95. Cambicci+Associates page 96 F u r n i t u r e f a c t o r y i n K a v a l a r i , T h e s s a l o n i k i , G r e e c e Project owner N.KARAPIPERIDIS-S.PARITSIS Co Project design parties Project management Architectural study archigraph architecture_interiors Structural study G.Papargyris-A.Kardoula Mep study Y.Cambicci (*) Study period: 2003 Construction details General contractor: Construction period: 2003 Construction status: in operation Short description of project-services New factory in Langadas area. Google metrics Buildings surface: 1.500m2 Plot size: 7.000m2 Mep budget: 200.000 €
  • 96. Company profile 2012 page 97 out of 129 N e w m e a t f a c t o r y i n F l o r i n a , G r e e c e Project owner VASILEIOS SAVVOPOULOS SA Project design parties Project management Leonidas Athanasiadis Architectural study archigraph architecture_interiors Structural study G.Papargyris-A.Kardoula Mep study Y.Cambicci (*) Study period: 1997 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 1997 Construction status: in operation Short description of project-services New factory in Florina area. Google metrics Buildings surface: 2.000m2 Plot size: 8.000m2 Mep budget: 500.000 € (*) co-designer 33% for planning
  • 97. Cambicci+Associates page 98 This page was intentionally left blank
  • 98. Company profile 2012 page 99 out of 129 IIInnnfffrrraaassstttrrruuuccctttuuurrreee
  • 99. Cambicci+Associates page 100 P o t i d a i a n e w H i g h w a y B r i d g e i n H a l k i d i k i , G r e e c e Project owner EGNATIA ODOS SA Project design parties Project management HELLINIKI TECHNODOMIKI SA Συγκοινωνιακή μελέτη GEOGNOSI SA Structural study VSL Systems AE Mep study Y.Cambicci (*) Study period: 2001 Construction details Gen. contractor: ELLINIKI TECHNODOMIKI SA Construction period: 2001 Construction status: in operation Short description of project-services New potidaia bridge with connecting highway in Halkidiki. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: € (*) co-designer 50% for planning
  • 100. Company profile 2012 page 101 out of 129 C u t & C o v e r u n d e r g r o u n d t u n n e l i n T h e s s a l o n i k i - M i c h a n i o n a A v e n u e Project owner Region of Central Makedonia Project design parties Project management Συγκοινωνιακή μελέτη DIKTYO SA Structural study ΜΕΤΕ SYSM SA Mep study Y.Cambicci (*) Study period: 2002 Construction details General contractor: Construction period: Construction status: postponed Short description of project-services Preliminary mep study for a 3 lanes carriage- way tunnel, 314m long, in MAKEDONIA Airport area. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: 3.000.000 € (*) co-designer 50% for planning
  • 101. Cambicci+Associates page 102 W a t e r t r e a t m e n t f a s c i l i t y f o r K o z a n i i n d u s t r i a l a r e a Project owner Prefecture of Kozani Project design parties Project management ENCO Co Χημικοτεχνική μελέτη ENCO Co Structural study Kostas Chatzis Mep study Cambicci+Associates Study period: 2008 Construction details General contractor: ITHAKI SA-MESOGEOS SA Construction period: 2008 Construction status: in operation Short description of project-services Renovation and expansion of water treatment fascility center for an industrial area. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: 500.000 €
  • 102. Company profile 2012 page 103 out of 129 W a t e r t r e a t m e n t f a s c i l i t y f o r A m y n t a i o , G r e e c e Project owner Municipality of Amyntaio Project design parties Project management ENCO CO Chemical study ENCO CO Structural study Kostas Chatzis Mep study Cambicci+Associates Study period: 2007 Construction details General contractor: DISTILOS SA Construction period: 2007 Construction status: in operation Short description of project-services Renovation and expansion of water treatment fascility center. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: 650.000 €
  • 103. Cambicci+Associates page 104 I r r i g a t i o n n e t w o r k o f M e s s i a n i , K o z a n i s , G r e e c e Project owner Prefecture of Kozani Project design parties Project management Anaptixiaki Kozanis Hydraulic study Horotechniki SA Structural study Akis Mystakidis Mep study Y.Cambicci (*) Study period: 1998 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Pump stations for irrigation networks. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: € (*) co-designer 33% for planning
  • 104. Company profile 2012 page 105 out of 129 ΕΕΕnnneeerrrgggyyy
  • 105. Cambicci+Associates page 106 T o w n H a l l o f P y l a i a Project owner Municipality of Pylaia Project design parties Architectural study K.Antoniou,E.Kastro,E.Disli,N.Barbari Structural study K.Anastasiadis, P.Panetsos Mep study Y. Cambicci (*) Mep study advisor Dr K.Pattas AUTh Proffessor Study period: 1994-1996 Construction details General contractor: Construction period: 1997-2000 Construction status: in operation Short description of project-services The first office building with geo-thermal ex- changers in Greece with Water to water Sourse Heat Pumps in coordination with the Mechani- cal Department of A.U.Th. Google (*) co-designer 33% for planning
  • 106. Company profile 2012 page 107 out of 129 T w o V i l l a s i n T h e r m i , G r e e c e Project owner Project design parties Architectural study Structural study Mep study Y. Cambicci (*) Geothermie systems advisor I.Mpousgolitis Study period: 2004 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Two villas with sophisticated water to water heat pumps network and geothermal exchang- ers. Google (*) co-designer 50% for planning
  • 107. Cambicci+Associates page 108 R e s i d e n t i a l P h o t o v o l t a i c s y s t e m s d e s i g n Project owner Project design parties Photovoltaic system study Cambicci+Associates Study period: 2010-ongoing Short description of project-services Connected residential photovoltaic systems in northern and central Greece Systems installed power: 5 up to 10 kWp each Total installed power: 165kWp System status: in operation
  • 108. Company profile 2012 page 109 out of 129 M a j o r p h o t o v o l t a i c s y s t e m s Project owner Project design parties Photovoltaic system study Cambicci+Associates Study period: 2011-ongoing Short description of project-services Connected photovoltaic systems, on rooftops and ground in northern and central Greece Systems installed power: 100 έως 2.000 kWp Total installed power: 2.400kWp System status: in various construction phases
  • 109. Cambicci+Associates page 110 This page was intentionally left blank
  • 110. Company profile 2012 page 111 out of 129 SSSeeecccuuurrriiitttyyy
  • 111. Cambicci+Associates page 112 B a n k o f G r e e c e B u i l d i n g i n T h e s s a l o n i k i , G r e e c e Project owner Bank of Greece SA Project design parties Construction manager Decathlon SA, D.Papazoglou Architectural study & construction supervision P.Nikiforidis–B.Cuomo ΤΥ ΤτΕ: BoG TD: E.Dalaklis-P.Panagakis Structural study and construction supervision Μ.Stefanouri–P.Zervas-G.Nikolaidis ΤΥ BoG TD: Ν.Vrontisis-G.Papadatos Mep study and construction supervision Y. Cambicci BoG TD:Κ.Dimitrakopoulos-Κ.Grigoropoulos Study period: 2004-2006 Construction details General contractor: DOMOTECHNIKI SA Construction period: 2007-2009 Construction status: in operation Systems description Sophisticated security systems including intru- sion control, central access control systems, closed circuit television networks, perimeter alarm systems, fully interconnected. Google
  • 112. Company profile 2012 page 113 out of 129 P o l i c e A d m i n i s t r a t i o n B u i l d i n g i n K o z a n i , G r e e c e MINISTRY OF INTERNAL AFFAIRS – HELLENIC POLICE DEPARTMENT Project design parties Project management KED SA Architectural study 406 Studies group, Vasileios Pappas Structural study I.Mavrakis and Associates SA Safety & Security study Cambicci+Associates Study period: 2008-2009 Construction details General contractor: ANDREADIS ZISIADIS SA Construction period: 2009-ongoing Construction status: under construction Short description of project-services Sophisticated security systems including intru- sion control, central access control systems, closed circuit television systems and risk anal- ysis study. Google
  • 113. Cambicci+Associates page 114 V I P V i l l a i n N o r t h e r n G r e e c e Ιδιώτης VIP πελάτης Project design parties Safety & security study Cambicci+Associates Study period: 2011 Short description of project-services Risk analysis study for the safety measures in VIP Villa in Northern Greece.
  • 114. Company profile 2012 page 115 out of 129 PPPrrrooojjjeeecccttt mmmaaannnaaagggeeemmmeeennnttt
  • 115. Cambicci+Associates page 116 This page was intentionally left blank
  • 116. Company profile 2012 page 117 out of 129 Project management services for the protection and upgrade of the suburban forest Seih-sou, in Thessaloniki, Greece. Project owner Region of Central Makedonia Project design parties Project management OMICRON E.P.E. CONSORTIUM, I.Iosifidis, Y.Cambicci, Services period: 2006-2009 Google
  • 117. Cambicci+Associates page 118 This page was intentionally left blank
  • 118. Company profile 2012 page 119 out of 129 ΟΟΟrrrgggaaannniiisssaaatttiiiooonnn Our office has the following depertments: Administration Mechanological & Plumbing Studies Electrical Studies Energy Studies Industrial Studies Lighting Design Security Studies And Renewable energy systems studies We have offices also in: • Alexandroupolis fir Thrace Projects • Larissa for Thessaly projects • Athens•
  • 119. Cambicci+Associates page 120 This page was intentionally left blank
  • 120. Company profile 2012 page 121 out of 129 QQQuuuaaallliiifffiiicccaaatttiiiooonnnsss –––dddiiippplllooommmaaasss fffrrrooommm pppuuubbbllliiiccc ssseeeccctttooorrr ppprrrooojjjeeeccctttsss Our office is equipped (as is necessary by Greek legislation) with a diploma for Public Sector projects in the following categories of Stud- ies: Mechanical-Electrical-Electronic Studies: Class C Diploma (Category 09) Environmental Studies: Class A Diploma (Category 27) Engineers who cooperate with our office have Diplomas in other categories. EEEnnneeerrrgggyyy iiinnnssspppeeeccctttiiiooonnn DDDiiippplllooommmaaasss The following engineers in our organization have been certified as Energy Inspectors: Yerasimo Cambicci (Class Β)
  • 121. Cambicci+Associates page 122 This page was intentionally left blank
  • 122. Company profile 2012 page 123 out of 129 CCCuuurrrrrriiicccuuullluuummm vvviiitttaaaeee
  • 123. Cambicci+Associates page 124 1. General Data Last Name: Cambicci First Name: Yerasimo Father’s name: Stylianos Year of birth: 1968 Place of birth: Xanthi, Greece Specialty: Diploma Mechanical Engineer A.U.TH. TCG No: 62405 Greek Public Works Degree (According to Greek Law 716/77) Number: 11263 Headquarters: Thessaloniki Valid thrued: 21.05.2008 Studies Categories: Category No 9: Degree Level C (MEP Studies) Category No 27: Degree Level A (Enviromental Studies) 2. Studies High School Degree Year of Graduation: 1985 Grade: Excellent High School: Xanthi 1st High School Mechanical Engineer Degree Year of Graduation: 1992 Grade: Good Thesis: Thermal Simulation of Artificial Water Tanks Thesis Grade: Excellent University: Aristoteleio University of Thessaloniki
  • 124. Company profile 2012 page 125 out of 129 3. Seminars Engineers & Personal Computers Carrier: TCG East Makedonia Section Period: 1992 Air Pollution Carrier: Energy Department- Section of Mechanical Engineers Polytechnic School - A.U.TH. Period: 1992 Ιnstallation Βus Compact Course Carrier: Siemens Training Center, Regensburg, Germany Period: 1997 Education In Lighting Carrier: Lightolier, USA Period: 2002 Lighting Technology Carrier: Rensesealer Polytechnic Institute, New York, USA Period: 2007 4. Foreign Languages English Diploma: First Certificate in English Institute: University of Cambridge
  • 125. Cambicci+Associates page 126 5. Work Experience 5.1 Employer: North Aegean Petrol Company (NAPC) Kavala, Greece Position: Production Engineer Period: 1987 Duties: Monitoring of the petrol deposit and supervision of drilling repair works 5.2 Employer: Private & Public Works in Greece Office Gerasimos Kampitsis + Associates Position: MEP Design Engineer Period: 1993-Today Duties: MEP Design & Construction Supervision, as follows: • Mechanical Electrical & Plumbing Installations design, for Buildings, Urban and infrastructure projects. • Lighting Design Projects • Supervision of the above studies at the construction phase. • Environmental Studies • Project Consultant • Project Management 6. Main Research Work 6.1 Research Program: New Pilaia Mayor Office – Energy Analysis Study Carrier: Pylaia Municipality, Polytechnic School of AUTH Position: Researcher Responsible Professor: Dr Konstantinos Pattas Period: 1994-1995 Project: Ground Source Heat Pumps
  • 126. Company profile 2012 page 127 out of 129 6.2 Research Program: New Media Mass Medium Carrier: A.U.TH. Position: Researcher Period: 2003 Project: Preliminary Report of New Building MEP Installations Study 6.3 Research Program: Expansion of Pedagogigs Building Carrier: A.U.TH. Position: Researcher Period: 2004 Project: Preliminary Report of New Building MEP Installations Study 6.4 Research Program: Fire Safety Installations in Law School Building Carrier: A.U.TH. Position: Researcher Responsible Professor: Dr Nikolaos Kyriakis Period: 2006 Project: Fire Safety Installations execution study 7. Conventions Urban Nightscape 2006, Hellenic Illumination Committee, September 2006, Goulandris Museum, Athens 8. Publications Heating System for a Baby Farm, Designing for Hygiene and Security. D.Mpozis, P.Kikidis, Y.Cambicci, D.Giannaraki, Ktirio magazine, Issue 166, 2004.
  • 127. Cambicci+Associates page 128 9. Member of TCG: Technical Chamber of Greece PSDMH: Hellenic Union of Dipl. Mechanical & Electrical Engineers SMHBE: Union of Northern Greece Mechanical & Electrical Engineers SMEDEKEM Union of Central Makedonia Public Projects Designers HIC: Hellenic Illumination Commitee ΕΙΒΑ/KNX: European Installation Bus Association (EIBA/KNX Partner). IESNA: Illuminating Engineering Society of North America. ASHRAE: American Society Of Heating Refrigerating and Air Conditioning, Hellenic Section Thessaloniki 2012 Γon behalf of Cambicci+Associates Yerasimo Cambicci Dipl.Mechanical Engineer AUTh
  • 128. Company profile 2012 page 129 out of 129 CCCooonnntttaaacccttt Postal Address: 10 Riga Feraiou & Filikis Eterias, 6th floor P.C. GR-555 35 Pylaia, Thessaloniki Greece Phones & Fax: Tel: +30 2310 850 800 +30 2310 262 106 +30 6970 985 805 Fax:+30 2310 850 865 Internet Address: Email: info@cambicci.eu Site: www.cambicci.eu (.com .gr) Skype: cambicci Facebook: Cambicci+Associates LinkedIn: Yerasimo Cambicci Driving Instructions Think before you print.