City of Albuquerque, Mayor Martin J. Chavez and the Albuquerquegreen program. Submitted by Danny Nevarez

City of Albuquerque, Mayor Martin J. Chavez and the Albuquerquegreen program. Submitted by Danny Nevarez

Statistics

Views

Total Views
564
Views on SlideShare
564
Embed Views
0

Actions

Likes
0
Downloads
6
Comments
0

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Green Path Criteria Green Path Criteria Presentation Transcript

  •  
  • The purpose of the Green Path Program is to encourage, and to facilitate, voluntary design and construction of energy-efficient buildings in Albuquerque that substantially exceed code minimum.
      • Voluntary
      • Incentivized
      • Commercial and Residential
      • Public and Private Sector Buildings
    THE GREEN PATH PROGRAM
    • NEW CONSTRUCTION
    • AND MAJOR RENOVATIONS
      • Must substantially exceed code minimum
      • LEED Gold or
      • LEED Silver with minimum 6 energy points
        • 4 points minimum in Credit Option 1 (energy efficiency)
        • 2 additional points in Credit Option 1, Credit Option 2 (on-site renewable energy), and/or Credit Option 6 (grid green power)
    GREEN PATH CRITERIA COMMERCIAL
  • GREEN PATH CRITERIA COMMERCIAL
    • SHELL BUILDINGS
      • Must substantially exceed code minimum
      • LEED Gold or
      • LEED Silver with minimum 6 energy points
        • 4 points minimum in Credit Option 1 (energy efficiency)
        • 2 additional points in Credit Option 1, Credit Option 2 (on-site renewable energy), Credit Option 5.2 (tenant sub-metering) and/or Credit Option 6 (grid green power)
  • GREEN PATH CRITERIA COMMERCIAL
    • TENANT DEVELOPMENTS
      • Must substantially exceed code minimum
      • LEED Gold or
      • LEED Silver with minimum 6 energy points
        • 4 points minimum (3 if in Green Path shell) in Credit Option 1 (optimize energy performance)
        • 2 additional points in Credit Option 1, Credit Option 3 (measurement and payment accountability), and/or Credit Option 4 (grid green power)
  • GREEN PATH CRITERIA RESIDENTIAL
      • Must substantially exceed code minimum
      • Build Green New Mexico (BGNM) Gold
      • LEED for Homes Gold or
      • LEED for Homes Silver with minimum 22.5 energy points
    • Proof that project has been registered with United States Green Building Council
    • Completed LEED checklist indicating points to be pursued
    • Credit assessment describing how points will be achieved
    • Summary report of energy modeling including input and relevant output
    • Copy of green power contract if grid green power point(s) will be pursued
    • Verification of compliance with Fundamental Commissioning requirements
    • Executive summary of project prepared by LEED AP
    GREEN PATH APPLICATION COMMERCIAL
    • Proof that project has been registered with United States Green Building Council or Build Green New Mexico
    • Completed LEED or Build Green New Mexico checklist indicating points to be pursued and describing how points will be achieved
    • Summary of energy performance calculations
    • Confirmation that HERS rater has reviewed plans and energy performance calculations
    GREEN PATH APPLICATION RESIDENTIAL
    • (continued)
    • Confirmation that HERS rater will perform (or monitor) and will validate results of:
      • duct leakage test,
      • building envelope leakage test, and/or
      • thermal bypass inspections
    • if those points are being pursued
    • Executive summary of project prepared by HERS rater
    GREEN PATH APPLICATION RESIDENTIAL
    • EXPEDITED PERMITTING
      • Review time cut in half
      • Always go to the front of the line
      • Plans routed to two sections at a time
    GREEN PATH INCENTIVES
      • INTEGRATED and Preliminary Plan Review and Eco-Charrette assistance at NO COST
    GREEN PATH INCENTIVES
  • INTEGRATED PLAN REVIEW TRADITIONAL LINEAR PLAN REVIEW Schematic Design Design Development Construction Documents Code Review PERMIT
  • INTEGRATED PLAN REVIEW INTEGRATED PLAN REVIEW
    • Large and/or complicated projects
    • Fast-track projects
    • Phased development
    • Performance-based projects
    Code Review Code Review Schematic Design Design Development Construction Documents = Building Permit Performance Standards
    • RECOGNITION
    • INCENTIVES
      • Green Path Certificates
      • Green Path Backsheets
    GREEN PATH INCENTIVES
      • Projects posted on Albuquerque’s Notable Green Buildings website
    GREEN PATH INCENTIVES
      • Designed to Earn the ENERGY STAR ( www.energystar.gov )
      • New Mexico Sustainable Building Tax Credit ( www.CleanEnergyNM.org )
    OTHER INCENTIVES
    • 1 MILLION SQ. FT. permitted since Jan. 1, 2008
    • 15% of new construction
    • 150-200 Green Path projects anticipated in 2009
    GREEN PATH SUCCESS
    • ONE BUILDING
    • EVERY YEAR:
      • Saves 4,233,000 kBTUs of energy
      • Reduces Carbon Dioxide emissions by 462.5 tons
    GREEN PATH SUCCESS
  • LINKS FOR FURTHER RESEARCH
    • Architecture 2030 and the 2030 Challenge:
    • www.architecture2030.com
    • Build Green New Mexico:
    • www.BuildGreenNM.com
    • ResNet (HERS Raters):
    • www.natresnet.org
    • United States Green Building Council (USGBC) and LEED:
    • www.usgbc.org