GM San Francisco, CA
Upcoming SlideShare
Loading in...5
×
 

GM San Francisco, CA

on

  • 459 views

 

Statistics

Views

Total Views
459
Views on SlideShare
454
Embed Views
5

Actions

Likes
0
Downloads
1
Comments
0

2 Embeds 5

http://www.linkedin.com 3
https://www.linkedin.com 2

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    GM San Francisco, CA GM San Francisco, CA Presentation Transcript

    • Architect: Ottolini Booth & Associates eGM - 475 Brannan Street - San Francisco, CA. General Motors Corporation recently launched its e-commerce division in San Francisco. The design strategy focused on the clients objective to create a space that gave visitors an immediate feeling of entering a cutting-edge technology company.End Show
    • eGM - 475 Brannan Street - San Francisco, CA. General Motors Mike WickProject Structure FMG resources are organized as cross functional teams which serve to align all members focus on client objectives. PB Patricia Ryan FMG David Daugherty FMG Mobile Company General Motors Corp. Name Mike Wick Title Address Phone # 248-797-0140 Phone # Fax # E-Mail Address Sherri Carter eGM 313-556-4956 Parsons Brinckerhoff Patricia Ryan Project Coordinator 2nd Flr - 480-101-210 810-986-8876 810-459-8302 810-986-5272 ryanp@pbworld.com Construction Services 6250 Chicago Road 810-947-1622 Warren, MI. 48090-9020 FMG FMG Ottolini & Booth Stephanie Hubbard 415-777-0768 hubbardsk@obarch.com OP Contract, Inc. Bruce Tharp YaShan Young 400 Second Street Ann Marie Project Manager 1983 A Davis Street 510-383-3630 415-716-6579 San Francisco, CA 94107 Chris Harris Project Manager San Leandro, CA 94577 510-430-0621 415-716-9280 510-639-3499 chrish@opcontract.com Tel 415 974 1677 Fax 415 974 5930 Warehouse 1983 A Davis Street San Leandro, CA 94577 Bodkins& Assoc. Noel Bodkins 616-949-8845 (Davis Webb) Chris OP Tracy Contract Source Group Frank Bonner 2384 Franklin Rd 248-745-9990 248-745-9994 Nienkamper Bloomfield Hills, MI Swinerton & Walberg Patricia Reid John Biale Project Manager 416-298-5700 416-298-9535 415-495-0414 415-730-5217 415-495-0484 Chris Harris Gerneral Contractor Bill Green Project Superintendent Maryanne Chille Administrator Clover Technologies Mark Katchever Systems Engineering One Clover Ct 248-449-4797 800-253-0395 248-449-9900 mkatchever@clover.com Manager Wixom, MI 48393 www.clover.comEnd Show
    • eGM - 475 Brannan Street - San Francisco, CA.Needs Assessment 3rd Floor Open Office Area (Room No. 302) •  (47) 6’-0” x 6’-6” Workstations - •  Panel height to allow “visual management” •  Single B/B/F Pedestal File/Reading Room (Room No. 306) •  Workstation to accommodate (1) LAN Line for Lap Top Computer and (1) Telephone) •  Lounge type furniture – “Fun, Functional, Flexible” •  Allow for Collaborative Work Environment •  Casual, collaborative setting •  Hoteling Situations •  Credenza for Storage •  Task Lighting •  Magazine Storage •  (47) Ergonomic Task Chairs •  CD/Media Storage •  (7) Round Teaming Tables w/ Castered Chairs •  Round, low work tables, possibly with electrical and tele/data hook-up Project Rooms (Room Nos. 312, 313, 315, 316) •  Lounge type furniture – “Fun, Functional, Flexible” Galley •  Casual, collaborative setting •  Stools •  Credenza for Storage •  (3) Round Tables w/ chairs •  Small, moveable side tables •  Round, low work tables, possibly with electrical and tele/ Terrace data hook-up •  (4) Round Outdoor Dining Tables w/ seatingEnd Show
    • eGM - 475 Brannan Street - San Francisco, CA.Manufacturer and Furnishings Evaluation Passage Desking System Meridian Storage Aeron ChairEnd Show
    • eGM - 475 Brannan Street - San Francisco, CA.Drawing & SpecificationDevelopment Furniture Layout 3rd Floor West eGM provided the programming data and building shell and FMG developed workstation typicals and conducted furniture layout test fits. Furniture SpecificationsEnd Show Typical Workstation Cluster
    • eGM - 475 Brannan Street - San Francisco, CA.Drawing & Specification Development Furniture Layout 4th Floor East eGM provided the programming data and building shell and FMG developed workstation typicals and conducted furniture layout test fits. Furniture Specifications Typical Workstation ClusterEnd Show
    • eGM - 475 Brannan Street - San Francisco, CA.Drawing & Specification Development Furniture Layout 4th Floor West eGM provided the programming data and building shell and FMG developed workstation typicals and conducted furniture layout test fits. Furniture Specifications Typical Workstation ClusterEnd Show
    • eGM - 475 Brannan Street - San Francisco, CA.Document Preparation and Acquisition Once basic agreements with the selected 475 Brannan St manufacturers have been made, we will: San Francisco, CA Zone 1, 2 & 3 Nienkamper Tables Proposal   Room Number MFG Cat Qty Part Number Part Description Unit Sell $ Total Sell $ 3/20/01 Lead Time 12 Weeks -  Verify pre-negotiated discounts against product Revised Proposal: BT41001-002 Project Room NIEK 2 V100/2CC Vox Vista Shaped Table - V shape - 160-15/16"L x 60-111 1/16"W x 28 1/2"H $12,658.25 $25,316.50 312 & 316 With 13" Partial Modesty Panel specifications. In Line Book Match Venner 15% Up Top Finish: Dark Mahogany $1,898.74 $3,797.48 Base Finish: Dark Mahogany Drawing End Pieces: Champagne - Submit final purchase orders for client approval. 01.119.3 Edge Detail: Facet Edge 10 Custom Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? $544.50 $5,445.00 Project Room NIEK 4 20810/2 Vox Table - Wave Shape - 120"W x 48"D x 28-1/2"H $3,113.00 $12,452.00 - Prepare and release orders. 313 & 315 Top Finish: Dark Mahogany Base Finish: Dark Mahogany Vendor Conf Rms Drawing End Pieces: Champagne -  Coordinate the acquisition of the furniture and 413 & 414 01.119.0 Edge Detail: Facet Edge 8 Custom Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? $544.50 $4,356.00 Project Room NIEK 1 VA200/2 VOX Arena Shaped Table - 192"W x 97-13/16"D x 28-1/2"H $12,111.00 $12,111.00 accessories. 314 With 13" Partial Modesty Panel In Line Book Match Venner 15% Up $1,816.65 $1,816.65 Top Finish: Dark Mahogany - Coordinate payments. Drawing Base Finish: Dark Mahogany End Pieces: Champagne 01.119.4 Edge Detail: Facet Edge -  Administer manufacturer pricing and Vendor NIEK 2 3 Custom 24724/2 Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? VOX Arenea Shaped Table - 192"W x 120"D x 28-1/2"H $544.50 $17,374.50 $1,633.50 $34,749.00 Conference Rm With 13" Partial Modesty Panel warranty agreements. 412 & 415 In Line Book Match Venner 15% Up Top Finish: Dark Mahogany $2,606.18 $5,212.35 Base Finish: Dark Mahogany Drawing End Pieces: Champagne 01.119.1 Edge Detail: Facet Edge 16 Custom Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? $544.50 $8,712.00 Main NIEK 1 27423/2 VOX Arenea Shaped Table - 132"W x 144"D x 28-1/2"H $11,720.50 $11,720.50 Conference Rm With 13" Partial Modesty Panel In Line Book Match Venner 15% Up Charge $1,758.08 $1,758.08 416 Top Finish: Dark Mahogany Base Finish: Dark Mahogany Drawing End Pieces: Champagne 01.118.0 Edge Detail: Facet Edge With Natural Figured Anagre - 15% Up Charge $1,758.08 $1,758.08 3 Custom Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? $544.50 $1,633.50 Main NIEK 1 VA100/2 VOX Arenea Shaped Table - 284-9/16"W x 339-11/16"D x 28-1/2"H $23,273.25 $23,273.25 Conference Rm With 13" Partial Modesty Panel In Line Book Match Venner 15% Up Charge $3,490.99 $3,490.99 416 Top Finish: Dark Mahogany Base Finish: Dark Mahogany Product Warranty Drawing End Pieces: Champagne 01.118.0 Edge Detail: Facet Edge With Natural Figured Anagre - 15% Up Charge $3,490.99 $3,490.99 8 Custom Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? $544.50 $4,356.00 ManufacturersEnd Show
    • eGM - 475 Brannan Street - San Francisco, CA.Document Preparation and Acquisition Issue Date: 3/2/2001 Revised: April 23, 2001 Vendor GM MFR MFR Order Vendor Ship Ship Phase Location MFG. Description Rel. # QUOTE P.O. # Date Ack. # Date To Current Orders Zone 1 3rd Floor HMI Seating Caper Seating SC-egm-001-R1 44-2101387-1 2/9/2001 225574 5/29/2001 Site Seating Aeron Seating SC-egm-001-R1 44-2101387-1 2/9/2001 225574 5/29/2001 Site Meridian Desks, Screens, Electrical & Files SC-egm-001-R1 34-23540-2 2/20/2001 2298340 5/21/2001 Site Zone 2 4th Floor HMI Seating Caper Seating SC-egm-002 4/23/2001 Site Seating Aeron Seating SC-egm-002 4/23/2001 Site Meridian Desks, Screens, Electrical & Files SC-egm-002 4/23/2001 Site Outstanding Proposals Proposal Location Description Status btegmz1 Zone 1,2 &3 Davis Webb Seating PO Release # Pending bt41001-002 Zone 1,2 &3 Nienkamper Tables PO Release # Pending Outstanding Issues Phase Location Description Status Zone 3 HMI, MeridianEnd Show
    • eGM - 475 Brannan Street - San Francisco, CA.Delivery Scheduling - Create a master schedule and critical path plan.   - Develop phasing plans to match your occupancy dates.   - Issue status reports to keep you advised of progress and to ensure that production and shipping dates are on schedule.End Show