Borg Warner Presentation
Upcoming SlideShare
Loading in...5
×
 

Borg Warner Presentation

on

  • 303 views

 

Statistics

Views

Total Views
303
Views on SlideShare
300
Embed Views
3

Actions

Likes
0
Downloads
0
Comments
0

2 Embeds 3

http://www.linkedin.com 2
https://www.linkedin.com 1

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Borg Warner Presentation Borg Warner Presentation Presentation Transcript

  • 805 E Maple Rd # 300 Studio B Architects Inc Birmingham, MI 48009 (248)433-1030 3800 Automation Drive - Auburn Hills, Michigan 48326End Show
  • - 3800 automation drive - auburn hills, mi. 48326 Scope of Work Analysis  Determine project parameters.  Define scope of work to be performed.  Establish project documentation procedures. Scope of Work • Consolidation Project • 410 Herman Miller Ethospace Workstations • Target Project Completion August 2002 Project Process • Union InstallationEnd Show
  • - 3800 automation drive - auburn hills, mi. 48326 Manufacture Evaluation  Develop detailed product specifications from approved final furniture plans.  Establish a CAD/CAP database for use in order entry.End Show
  • - 3800 automation drive - auburn hills, mi. 48326 Drawing & Specification Development  Develop detailed product specifications from approved final furniture plans.  Establish a CAD/CAP database for use in order entry.End Show
  • - 3800 automation drive - auburn hills, mi. 48326 Design and Product Application Consulting  Furniture Specifications  Application Guide Lines.End Show
  • - 3800 automation drive - auburn hills, mi. 48326Change Order Management  Process all change orders due to: Field changes / Layout revisions / Order modifications. Borg Warner Powertrain Technical Center CHANGE ORDEROwners Name: Borg Warner Date: June 5, 2002Address: 3800 Automation Drive, Auburn Hills, MI 48326Attention: Greg Wruck Project Address: 3800 Automation Ave, Auburn Hills, MI. 48326 GENERAL CONDITIONS:CONSTRUCTION CHANGE ORDER NUMBER: 2 __________ 1) PAYMENT Payment for this Change Order is due upon completion of the work described above, _______ and submittal of invoice by the Contractor.GENERAL SCOPE OF WORK DESCRIPTION: 2) INCORPORATIONPursuant to the Construction Agreement between Contractor and Owner dated April 2002, The This Change Order, by agreement of Owner and Contractor, is incorporated byContractor performed the following changes: reference into the Construction Agreement between Owner and Contractor. All terms and conditions in the General Conditions section of the Construction AgreementChange order #2 due to the unloading and staging of non-combustible furnishings between Owner and Contractor apply to this Change Order.on jobsite, all combustible furnishings will be reloaded and sent to Furniture DateManagement Service’s warehouse in Pontiac, Michigan. Combustible furnishing willstay at FMS’s warehouse until the city of Auburn Hills issues a Temporary Bruce Tharp _________________________________Certificate of Occupancy. When TCO has been issued the combustible furniture will Project Directorbe redelivered to the jobsite. Client Signature Facility Matrix GroupEnd Show
  • - 3800 automation drive - auburn hills, mi. 48326 Delivery Scheduling/Status Reports  Create a master schedule and critical path plan.  Develop phasing plans to match occupancy dates.End Show
  • - 3800 automation drive - auburn hills, mi. 48326 Punchlist Development  Identified all products that were damaged, shipped or installed incorrectly.  Assigned resources and completion dates. Borg Warner 3800 Automation Dr Auburn Hills, MI 48326 Project Punchlist - Ground Floor West Side Project Manager: Bruce Tharp Issue Date: 19-Jul-02 * The items identified herein shall be corrected by the General Contractor or by their sub-contractor(s) prior to final acceptance of the w ork by the tenant and/or tenants landlord/ow ner. Any omission of items from this punchlist does not w aiver the General Contractors responsibilities for finish quality w orkmanship, materials, quarantees, etc. * If any of the items or parts listed are to be considered additional w ork (i.e., not part of the contract) by the General Contractor or sub-contractor(s) , the landlord/ow ner and tenant must be notified in w riting no later than 10 days after issue date, identifying costs for such, prior to proceeding w ith the w ork. * All repair w ork shall be done in an expeditious manner w ith due respect to tenants w ork schedule and personnel. If required by the landlord/tenant, a schedule for repairs shall be submitted for use in coordinating the same w ith the landlord/tenant. * The General Contractor shall notify the Architect and Landlord/Ow ner of his completion of repairs in order that final approval inspection may be provided Location / Punchlist Punchlist Date Approval Date Room # Dwg Code Item Y or N Description Resource Completed Signature Comments 7/19 G-33 A Y Scratched mobile pedestal FMS 7/25/2002 G-35 B Y Loose end panel base FMS 7/25/2002 G-39 B Y Loose end panel base FMS 7/25/2002 G-21 B Y Loose end panel base FMS 7/25/2002 G-24 B Y Loose end panel base FMS 7/25/2002 G-7 B Y Loose end panel base FMS 7/25/2002End Show