Cio Summit 2010 Presentation On Pue And Datacenter Optimisation

314 views
258 views

Published on

Datacenter PUE and optimisation presentation given by E-TEC during the CIO Summit 2010 in Vienna (Austria)

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
314
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Cio Summit 2010 Presentation On Pue And Datacenter Optimisation

  1. 1. CIO Europe Summit 2010<br />Vienna, October 19th – 21st<br />Datacenter optimization and PUE<br />“Focus oncosteffective and futureproof designs”<br />Presentationby Krzysztof Tutaj (CEO), Bob Hunt (VP), Bram Slaager (VP)<br />
  2. 2. Company overview E-TEC<br /><ul><li>International company
  3. 3. 10 years + in business
  4. 4. Focus on Datacenter design, building and manage
  5. 5. Software solutions
  6. 6. Business areas: IT, Industry, Telecom, ISP, Banking, Insurance
  7. 7. Vendor neutralapproach</li></ul>Ireland United KingdomGermanyNetherlands CEO Mr. Tutaj E-TEC facebook<br />www.e-tecpowerman.com<br />
  8. 8. Focus of todays Workshop Presentation<br />Datacenter design and optimization! <br />
  9. 9. The newapproach to datacenter design!<br />
  10. 10. Key Datacenter Operating Factors<br />EFFICIENCY<br />CAPACITY<br />AVAILABILITY<br />
  11. 11. Datacenter operatingcostsgoing UP<br />
  12. 12. Let’s switch to PUE – Overview of Topics<br /><ul><li> General Explanation
  13. 13. Case Story energycompany (Germany)
  14. 14. Case Story City of Amsterdam (Netherlands)
  15. 15. White Papers</li></li></ul><li>General Explanation - 1<br />
  16. 16. General Explanation - 2<br />
  17. 17. Case Story 1- Energy & Water company (Germany)<br /><ul><li> 1600 HU Capacity
  18. 18. 250kW Power and Cooling, Fully redundant 2N
  19. 19. Security, Access, Fire extinghuising
  20. 20. Building time 16 weeks turnkey
  21. 21. Pre-calculated PUE 1,4 maximum
  22. 22. Free cooling 65% of the year (water/air temperatures)
  23. 23. Airflow management inside datacenter (hot/cold air mixing)
  24. 24. High efficiency installations (UPS, cabling, pumps)</li></ul>http://www.rewag.de<br />
  25. 25. Case Story 2- CityHall of Amsterdam<br /><ul><li>Turnkey high efficient datacenter City of Amsterdam
  26. 26. 10% Electrical Power = usedby datacenters in Amsterdam region
  27. 27. OneReason is reduction of 40% CO2 by 2025
  28. 28. SecondReason is Saving of 33% energyconsumption
  29. 29. Result at 1MW IT Power: savingonenergycosts Euro 500.000,=
  30. 30. Result at 1MW IT Power: reduction of CO2 of 1.800.000 kg
  31. 31. Free cooling 65% per year
  32. 32. Additional Hot/Cold underground waterstorage
  33. 33. Additional Water CoolingbyusingAmstel River coolingcapacity</li></ul>http://www.amsterdam.nl<br />
  34. 34. White Papers<br />Ouropinion: Proven design and PUE beforebuild! <br />
  35. 35. Summary<br />What has been covered in todays workshop:<br /><ul><li>Cost of operationfor datacenters are growing
  36. 36. PUE Regulation of localgovernmentwillbe put into place
  37. 37. New Technologies helpsyou to improve the Datacenter efficiency
  38. 38. Now is the time to change</li></ul>Keymessages: <br /><ul><li>Integral design and planning
  39. 39. Prove the Efficiency upfront and notafterwards
  40. 40. Invest a bit more and achieve a better TCO</li></li></ul><li>Q + A<br />
  41. 41. E-TEC thanksit’stechnology partners<br />

×