• Save
Sample Of Work - Drafting Portfolio
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Sample Of Work - Drafting Portfolio

on

  • 4,418 views

 

Statistics

Views

Total Views
4,418
Views on SlideShare
4,415
Embed Views
3

Actions

Likes
1
Downloads
0
Comments
0

2 Embeds 3

https://www.linkedin.com 2
http://www.linkedin.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Sample Of Work - Drafting Portfolio Presentation Transcript

  • 1. Drafting Portfolio for Bryon Kunz
    Samples of Work: Sketches, Construction Documents, Site Photos
  • 2. Contents
    Retail Store Front - Fountain Water Feature ~ slides 3 – 16
    Multi-Family Apartment - Community Building,
    Manager’s Unit, Manager’s Office ~ 17 – 53
    Multi-Family Apartment - Maintenance Building,
    Mail Kiosk, Fire Water Pump House ~ 54 – 61
    Tenant Improvement on Vacant Commercial Shell ~ 62 – 70
    Residential Kitchen Remodel - Preliminary and
    Final Sketches per Client Interaction ~ 71 – 78
    Featured Project, Remodel Spokane magazine,
    Fall 2009 issue - Roberson Bath / Kitchen ~ 79 – 83
    Multi-Family Apartment – Addition and Conversion
    of Pool / Laundry Building into Leasing Office ~ 84 – 95
    Featured Project, Remodel Spokane magazine,
    Spring 2010 issue - ClowKitchen (http://www.remodelspokane.org/viewmag/?art=149) ~ 96 – 101
  • 3. Store Front Fountain Project
    Elk Grove, CA
    2008
  • 4.
  • 5.
  • 6. As mandated by ordinances and plan review comments, the original fountain design was reoriented to face the intersection of Waterman Road and Elk Grove Boulevard, and underwent modifications to the overall size, landscaping, bench seating & anterior signage.
  • 7. North Elevation
  • 8. East Elevation
  • 9.
  • 10.
  • 11.
  • 12. South-West Elevation
  • 13.
  • 14. West Elevation
  • 15.
  • 16.
  • 17. 2,921 sq. ft. Community Building, Office & Upstairs Manager’s Unit for 103-Unit Multi-Family Apartment Project
    Elk Grove, CA
    2009
  • 18.
  • 19.
  • 20.
  • 21.
  • 22. The following site photos, showing the completed and newly occupied downstairs Community Building and Office, move from the front entrance (adjacent to large main parking lot, see image below) around the exterior in a counter-clockwise manner. Upon reaching the patio adjacent to the pool deck, the photo tour shifts to the building’s interior near the pool-side window wall, and proceeds along the inside details with a clock-wise progression.
  • 23.
  • 24. South Elevation
  • 25. Photovoltaic roof tiles were included in the LEED qualifying design scheme.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. Covered mail receptacles along the East elevation.
  • 31. Approaching the corridor access to Northern pool-side patio area, from the East.
  • 32.
  • 33. Pool-side shower at North-East corner of Community Building, along the North elevation.
  • 34.
  • 35.
  • 36. North Interior Elevation
  • 37. Light well above table seating area, along North interior elevation
  • 38. Lighting troughs were added throughout the interior of the Community Building lobby area.
  • 39. East Interior Elevation
  • 40.
  • 41.
  • 42. South-West Interior Elevation
  • 43. West Interior Elevation
  • 44.
  • 45. Kitchen at North-West corner of Community Building
  • 46.
  • 47.
  • 48. South-East view of dwelling Buildings P and Q of Copperstone project during construction, taken from US Hwy 99, adjacent to West Stockton Boulevard (beyond freeway onramp and greenbelt, alongside which semi trailer is parked). Reference previous slide’s image.
  • 49. South view of Buildings O and P during construction
  • 50.
  • 51.
  • 52.
  • 53.
  • 54. Additional Buildings from 103-Unit Multi-Family Apartment Project
    Elk Grove, CA
    2009
  • 55. Maintenance Building
  • 56.
  • 57. Mail Kiosk
  • 58.
  • 59.
  • 60. Fire Water Pump House
  • 61.
  • 62. 5,395 sq. ft. Tenant Improvement on Vacant Commercial Shell Project
    Sacramento, CA
    2009
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71. Residential Kitchen Remodel
    Cheney, WA
    2009
    Preliminary and Final sketches, used to facilitate the design process through Client feedback, revisions & interaction
  • 72. Sketch 1
  • 73. Sketch 2
  • 74. Sketch 3
  • 75. Final Kitchen Plan Sketch
  • 76. Referenced from Final Kitchen Plan - photo examples 1 & 2
  • 77. Referenced from Final Kitchen Plan - photo example 3
  • 78. Provided by Client – photo example of radius counter
  • 79. Featured Project, Remodel Spokane magazine (Fall 2009 issue)
    Roberson Bathroom and Kitchen Remodel
    winners of contest co-sponsored by KXLY News 4 Extreme Team and the Spokane Home Builders Association Remodeler’s Council
  • 80.
  • 81.
  • 82.
  • 83.
  • 84. Multi-Family Apartment – Addition and Conversion of Pool / Laundry Building into Manager’s Leasing Office
    Elk Grove, CA
    2009
  • 85.
  • 86.
  • 87.
  • 88.
  • 89.
  • 90.
  • 91.
  • 92. North-East Elevation
  • 93. Entrance at East Elevation
  • 94. North Elevation
  • 95.
  • 96. Featured Project, Remodel Spokane magazine (Spring 2010 issue)
    Newman Lake, WA
    2010
    ClowKitchen Addition & Remodel
    http://www.remodelspokane.org/viewmag/?art=149