Ecolink double wall march 11 2013
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Ecolink double wall march 11 2013

on

  • 439 views

 

Statistics

Views

Total Views
439
Views on SlideShare
439
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Ecolink double wall march 11 2013 Presentation Transcript

  • 1. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013
  • 2. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013
  • 3. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Foundation• Concrete w spread footing
  • 4. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Backfill• Foundation damp proofing• Drain tile• Under slab plumbing
  • 5. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Structural Framing 1• Conventional 2x4• ½” ecoboard sheathing• Conventional floor joists• Joist hangers (no rim joist)
  • 6. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Structural Framing 2• 2x4 w ecoboard sheathing
  • 7. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Framing Inner Wall• Ecofoam 2x4 non structural• Ecofoam 6” for sub slab
  • 8. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Slabs & Opening• 4” slab on grade• 1-1/2” topping on 2nd floor• Hydronic in floor heat• ½” ecoboard boxing windows
  • 9. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Window• 3x glaze fibreglass (Cascadia)• Nail flange mount• Mount to outer wall• (Could be centre mounted)
  • 10. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Spray Foam• 4” at foundation• 10” in wall
  • 11. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Finishes• Drywall and baseboard trim• Wood window trims• Exterior rainscreen and claddding
  • 12. Lanefab / EcoLink Double Wall Assembly March 11 2013Roof Assembly
  • 13. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Floor Joists
  • 14. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Structural Framing
  • 15. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Roof Framing• Parallel chord truss (~15”)• 2x4 eave tails
  • 16. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Inner Wall• Ecofoam 2x4 non structural
  • 17. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013Spray Foam• 10” wall• 15” roof
  • 18. Lanefab / EcoLinkDouble Wall AssemblyMarch 11 2013