• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
City Council March 22 -  50th Street & Grape Creek Road Construction
 

City Council March 22 - 50th Street & Grape Creek Road Construction

on

  • 717 views

 

Statistics

Views

Total Views
717
Views on SlideShare
662
Embed Views
55

Actions

Likes
0
Downloads
1
Comments
0

3 Embeds 55

http://www.sanangelotexas.us 23
http://sanangelotexas.us 22
http://www.sanangelotexas.org 10

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    City Council March 22 -  50th Street & Grape Creek Road Construction City Council March 22 - 50th Street & Grape Creek Road Construction Presentation Transcript

    • City Council
      March 22, 2011
    • Roller Compacted Concrete
      What is Roller Compacted Concrete (RCC)
      Where has RCC been used
      RCC Construction Process
      50th Street & Grape Creek Bid Tab
      Street Life Cycle
    • Roller Compacted Concrete
      RCC Pavement
      No Slump
      Consistency of damp gravel
      No forms
      No reinforcing steel
      No finishing
      Placed with asphalt pavers
      Compacted with vibratory rollers
      Normal cement hydration
      Low W/C ratio = limited shrinkage cracks
      Reynoldsburg, OH
    • RCC Construction Projects
      Street Projects
      Collector & Residential
      Several in S. Carolina
      100+ in Columbus, OH
      S. Carolina DOT – 8 Projects
      Interstate Projects
      I-285 Atlanta, GA
      I-385 Greenville, SC
      Aiken, SC
    • RCC Construction Projects
      S. Carolina DOT US Hwy 2009
      10” RCC reconstruction
      6000 ADT, 4 lanes
      45 mph
      Replaced 1 mile in 15 days
      Re-opened in 24 hours
    • RCC Construction Projects
      Ohio State University 2002
      • 8” RCC reconstruction
      • 150 buses/day
      • Reconstructed in 1 weekend
      • RCC selected for fast
      construction process to
      complete by 1st football game
    • RCC Construction Process
      Central Mix
      • Mid size applications
      • 200 to 300 tons/hr
      • Available at some locations
      • Fixed locations
      • Capacity reduced due to low water content of mixture
    • RCC Construction Process
      Continuous Flow Pugmill
      • High-volume applications
      • Excellent mixing efficiency for dry materials
      • 250 to 900+ tons/hr
      • Mobile, erected on site
      • Mobilization costs
    • RCC Construction Process
      Asphalt Paver Placement
      • High density
      • High initial density (85% to 95%)
      • Smooth surface depends on initial density
      • High-production (1900 LF/day)
      • Max lift thick – 8 to 10 in.
      Lane Ave – Columbus, OH
    • RCC Construction Process
      Asphalt Paver Placement
      • Proper compaction is critical for strength and durability
      • Compact to 98% of modified proctor
      • 10 to 12 Ton vibratory roller
      • Eliminate long. cold joints through compaction process
      Reynoldsburg, OH
    • RCC Construction Process
      RCC
      Asphalt
      Conventional Concrete
      RCC
      Diamond Ground Conventional Concrete
      Diamond Ground RCC
    • 75 Year Useful Life Maintenance Cost
      Asphalt RCC
      Sealcoat $939,680.28 $0.00
      (Every 8yrs)
      Mill & Overlay $6,556,466.24 $0.00
      (Every 24yrs)
      Overlay $0.00 $1,416,103.69
      (RCC at 60yrs)
      Maintenance Cost $7,496,146.52 $1,416,103.69
      (75yrs)
    • Asphalt Street Life Cycle
    • 50th & Grape Creek Bid Tab
      Price Construction Reece Albert
      50th $2,267,261.73 $2,353,428.01
      Grape Ck “A” $1,431,937.80 $1,174,202.99
      Grape Ck “B” $1,352,668.32 $1,193,184.85
      “A”= Asphalt “B”= Roller Compacted Concrete
      50th & “A” $3,699,199.53 $3,527,631.00
      50th & “B” $3,619,930.05 $3,546,612.86
      Difference $79,269.48 $18,981.86