City Council Feb. 5, 2013 river project update

  1. 1. City CouncilFebruary 5, 2013
  2. 2. River Improvements ProjectFebruary 5, 2013
  3. 3. River Improvements Project
  4. 4. River Improvements Project• Construction Manager at Risk: Templeton Construction, Inc.• Time Summary • Contract Date: October 1, 2011 • Completion Date: August 2013• Budget Summary • Project Budget = $9,899,321.79 • Total Change Orders to date = $599,321.79 • Billed to Date (Gross) = $7,918,778.91 • Retainage Held to Date (3%) = $234,122.70 • Billed to Date (Less Retainage) = $7,684,656.21 • % Complete = 78%
  5. 5. River Improvements Project• Funding Sources: Half-Cent Sales Taxes and nearly $2,000,000 in grants including 2 from Texas Parks and Wildlife, San Angelo Health Foundation, Texas Commission on Environmental Quality and National Endowment for the Arts.• Improvements to Include: stabilization of the banks from Oakes Street upriver to the vicinity of Sulphur Draw, additional trails and trail improvements, new lighting, an outdoor exercise area, public art, shaded sitting areas, water features and other special elements.• Work outside of contract includes trail section on SAHF property and some existing trail renovation.• Note: dredging of the river occurred in 2009 from Sulphur Draw upriver to 14th Street at a cost of about $1,500,000.
  6. 6. River Improvements Project• Bank stabilization complete, including extended area. May do additional stabilization below Visitors’ Center.• Most initial art installed (less sculpture panels).• Work continues at Irving Street and Games area.• Landscaping discussion with City Council.• High pedestrian bridge update.
  7. 7. River Improvements Project Bank stabilization below Central High School
  8. 8. River Improvements Project Bank stabilization just down river from Pecos Bridge
  9. 9. River Improvements ProjectBank stabilization between Pecos and Beauregard Bridges
  10. 10. River Improvements Project Bank stabilization down river from Beauregard Bridge
  11. 11. River Improvements Project Bank stabilization, before and after
  12. 12. River Improvements Project High pedestrian bridge, refurbishment to follow
  13. 13. River Improvements ProjectPublic space between high pedestrian bridge and South Abe
  14. 14. River Improvements ProjectPublic space between high pedestrian bridge and South Abe
  15. 15. River Improvements Project Small “amphitheater” area east of South Abe
  16. 16. River Improvements Project Mosaic panel below South Abe
  17. 17. River Improvements Project Bank stabilization below “Kids’ Kingdom” Park
  18. 18. River Improvements Project Curbing and pavestone work at Meza Fountain
  19. 19. River Improvements Project Area to be considered for additional stabilization
  20. 20. River Improvements Project Mosaic cars below Koenigheim
  21. 21. River Improvements Project Exercise Area below Koenigheim
  22. 22. River Improvements Project LED lights below Koenigheim
  23. 23. River Improvements Project Ramp east of Koenigheim
  24. 24. River Improvements ProjectColumns with openings for limestone panels and lights at Irving
  25. 25. River Improvements Project Trail crossing at Irving
  26. 26. River Improvements ProjectRiver crossing at Irving Ramp to new trail on SAHF property
  27. 27. River Improvements Project Stonework at Irving
  28. 28. River Improvements ProjectColumns, stonework and trail light at games area
  29. 29. River Improvements ProjectFossils in stone at columns
  30. 30. River Improvements Project Restrooms at games area near Irving
  31. 31. River Improvements Project Refurbished fountain at games area
  32. 32. River Improvements Project Art work below Chadbourne
  33. 33. River Improvements Project Trail lights below Neff’s area
  34. 34. River Improvements Project Main fountain testing
  35. 35. River Improvements Project Shade structures near main fountain
  36. 36. River Improvements ProjectMosaic panel west of Oakes
  37. 37. River Improvements Project Pumping station west of Oakes
  38. 38. River Improvements Project Refurbished fountain west of Oakes
  39. 39. River Improvements Project Interpretive area below Oakes
  40. 40. River Improvements Project Interpretive area below Oakes
  41. 41. River Improvements Project
  42. 42. River Improvements Project
  43. 43. River Improvements Project
  44. 44. River Improvements Project
  45. 45. River Improvements Project

×